ENGINEER-III
PARCO
مجموع سنوات الخبرة :14 years, 11 أشهر
•Prepare Technical evaluation of bids received, presentation note for IEC’s approval, monthly activity report, Bill of quantities for materials to be indented (Pipeline Spares and Materials).
•Carryout scheduled survey of pipeline to check the extent of external corrosion of Pipeline.
•Loading, launching, retrieving and tracking of cleaning, geometrical and intelligent pigs for diameter 26” white oil pipelines, 16” diameter KMK Pipeline, 20” diameter Transfer Line and 26” diameter KPLP Line.
•Assist in pigging contractor to carryout Intelligent Pigging campaign in the region.
•Involved in procedure qualification test and welder qualification test was conducted as per WPS supplied by the owner.
•To plan execution schedule, to coordinate with contractor for the achievement of scheduled milestones, verification of daily, weekly and monthly progress reports.
•Attending real time emergencies to maintain the integrity of PARCO Pipeline network in the designated region.
•Receive requisition for repair, maintenance from immediate supervisor, arranges to obtain related material and deploy team to carry out necessary repair and maintenance work on site by keeping in view of all safety requirements.
•Receive schedule of Pipeline replacement due to internal corrosion in the assigned region and prioritize the repair maintenance work.
•Plan for periodic assessment of designated Pipeline region maintenance work by carrying out required surveys of Pipeline. Obtain approval from superior and arrange to perform required surveys accordingly.
•Coordinate with the Stations & Terminals before carrying out repair and maintenance of Pipeline to stop pumping or decrease flow rate for Sleeve welding over Pilferage, metal loss and dent points.
•Direct subordinates or contractor to carry out approved repair and maintenance work, check report of welding to ensure flawless welding and details of tests carried out with the result to ensure strength of pipeline.