Reviewing the technical specifications, Tender documents, Method of
statement, approved structural & architectural and IFC Shop drawings
before starting any activities in Site.
• Review plans drawings, quantities for accuracy, and work sequence of the
contract program with the planning department.
• Execution of finishing work like joinery, marble and tile work,
interior fit out, wooden panel installation, false ceiling.
• Undertaking surveys and setting out sites.
• Assessed costs of labor and materials for each project, ensuring adherence
to budgetary requirements.
• Material submission for approval.
• Crafted project documentation including work order cards, method
statements, construction plans and risk assessments.
• Complete construction goals safety on budget and to desire
deadline.
• Execution of infrastructure and substation works.
• Execution of all substructures, superstructure works, finishing
& Landscaping works.
• Preparing and delivering status reports to senior management regularly.
• Created detailed project schedules, working closely with subcontractor to
manage deadlines.
• Ensure that all materials used, and work performed are in accordance
with the specifications.
• Identified and rectified quality issues to minimize operational disruption.
• Review & recommend method statements and required details for monthly
valuation.
• Preparing Productivity reports, Progress Report and Two weeks look-
ahead plans for the site.,
• Managed parts of construction projects and analyzed technical drawings.
• Produced all surveyor setting out along with approved drawings.
• Monitored excavation & quality standards during the construction period
in accordance with project specifications.
• Checked technical designs & drawings and inspected sequential completed
items to the consultant.
• Oversaw quality control, health, and safety matters on site.
• Ensure execution of work according to approved drawings, design and
specification.
• Overseeing Excavation & Back Filling work. Execution of Structural & non-
structural works (checking materials used, checking layout/orientation of
structure, checking installation of steel reinforcement, diameter and
number of bars, splicing/lapping of bars, installation of formworks, support
and elevation of foundation.
• Execution of Finishing work (Masonry, plastering, waterproofing, tile works).
• Execution of manhole pipe line works.
• Coordinating with the procurement department Weekly/Monthly basis in
order to site requirement materials.
• Coordinating with quality and HSE team to assuring the quality & safety of
work.
• Produce quality work, meeting requirements of project specifications and
industry standard.
• Prepare adequately for the daily Toolbox safety meetings and cover as a
minimum weekly
Estimated quantities and cost of materials, equipment and labor
requirements to determine project feasibility.
• Completed projects on time and within budget by collaborating with
contractors, architects and public authorities.
• Planned and designed site layouts from concept to completion using
AutoCAD Civil 3D and ArcGIS.
• Visited sites to review work progress and drive process improvements.
• Oversaw Quality Control (QC) for construction teams, delivering results in
line with project specifications.
• Inspection of all Civil Works - steel cutting according to BBS
shuttering and casting of box Culvert & launching.
• Testing materials such as concrete, cement, Aggregate.
• Preparing Bar Bending schedule of Footings, Columns, walls & slabs
• Making Daily, weekly and monthly progress reports.
• Drawing up monthly reports on the progress of the site.
• Complete all documents such as RFI & Billing of contractors etc.
• Inspection of concrete pouring activities & Site supervision of building
as per drawings
• Maintaining Standard thickness of Plastering and proper mixing of
mortar as per ratio and giving plaster marking by using Right-angle
method.
• Surveyed, graded and levelled construction sites within assigned
Timeframes.
• Safety Precautions to the workers during construction.