Trainee Engineer
Sitara Energy
مجموع سنوات الخبرة :1 years, 1 أشهر
Sitara Energy comprises power plant having 48MW (8 x 5.96 MW HFO operated NIIGATA Japan diesel engines), 34MW natural gas based engines (12 x 1.95MW caterpillar, 4 x 3.14MW jenbacher) with exhaust gas boilers.2※255 KW Gas operated Guascor engines. It’s also comprises of waste heat recovery system with 10 units water tube boiler having capacity of 2.5 tons/hours each and 3 units fire tube made by DDFC, 3.7 TONS/HOURS EACH.
Maintenance activities
• Major 8000 hours maintenance
• HFO and lube oil purifier overhauling
• Gas engine maintenance
• Electric heater rectification
• 3000 hours maintenance
• Meggaring test.
• Switch gears (HV/LV/MV)
• Maintenance of 400 V, circuit breaker.
• Testing operating and maintenance of circuit breaker, single & double circuit breaker scheme
• Transformer 30KVA, 11KV/415V maintenance
• Protection relays,
• PLC & instrumentation
• Generator maintenance
• Motors and cables
• Battery Chargers and UPS
Operation activities
Operate the Engine
Synchronous the Generator( Manual and Automatic)
Sharing Load
Operate MCB
1) Programmable Logic contoller (PLC) 2) Power supply of factories 3) Design of power supply system 4) Electric Machinery theory 5) Fundamental of electric Circuit 6) Digital Electronic Technology 7) Automation control theory 8) Power Electronics 9) Electric Drive And Control System 10) Motion Control system