Imteyaz Ahmad Siddique PMP RMP PMI MBA Project Management Professional, Senior Project Manager

Imteyaz Ahmad Siddique PMP RMP PMI MBA Project Management Professional

Senior Project Manager

Rawabi Butec Co LTD

Location
Saudi Arabia - Riyadh
Education
Master's degree, Master of Business Administration - MBA
Experience
21 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 11 Months

Senior Project Manager at Rawabi Butec Co LTD
  • Saudi Arabia - Tabouk
  • My current job since June 2022

Directly reporting to the Project Director of the Company, The Senior Project Manager will have responsibilities. Schedule, plan, coordinate and direct the Contractor all construction activities at the Site to ensure that the Project gets completed on time, within budget with the best quality and safety record. The Project Manager responsibilities include but are not limited to Ensuring that the Contractor Schedule the project in logical steps and budgets the time required to meet deadlines. Project Scope for TABUK BP- Installation of Two new Foam generation skids (X04-U-0110 and X04-U-0112) and connect the discharge to Loading islands, unloading islands, and Pump shelters 01 & 02.The existing 8” bare carbon steel shall be demolished, and 10” new internal FBE-coated pipe spools shall be replaced Installation of new CPI skids(X04-U-0108) with Effluent pumps and skimmed oil pumps. Installation of New Normal OWS pump (X04-G-2B) along with discharge piping to new CPI system. Replace the existing OWS pump (Xo4-G-2A and X04-G-3A) discharge line with new flow elements. Extend heel recovery drainage sump and demolish existing leftover pumps(Xo04-G-4A/B).Demolition of Existing API separator after commissioning new CPI system. Liner Rim seal shall be provided for the existing floating tanks T-1305 to T-1309, D-403, and D-0113.Demolition of Existing Foam skid(D-0105 & D-0106)along with foam tanks, Smoke detection system shall be provided in the existing cafeteria area. Replace existing heat detectors in loading islands, unloading islands & pump shelters. MS modification work for the fire network system. Insulation scope for existing eyewash system. Fireproofing scope for new structural items. Modification of existing Loading/Unloading sheds. Installation of ground sweep nozzles Truck loading Islands 1 & 3 and Truck unloading Islands 2, 3, 5, 6 & 7.Project Scope for DUBA BP-Installation of One new Foam generation skid (X05-U-0204) Installation of 11 Ground Sweep Nozzles.

Senior Project Manager at IMADCO CO
  • Saudi Arabia - Dammam
  • June 2021 to June 2022

Directly reporting to the P&GM of the Company, The Project Manager will have responsibilities.
Schedule, plan, coordinate and direct the Contractor all construction activities at the Site to ensure that the Project gets completed on time, within budget with the best quality and safety record. The Project Manager's responsibilities include, but are not limited to Ensuring that the Contractor Schedule the project in logical steps and budget time required meeting deadlines. Ensure that the Contractor assesses properly labor requirements and dispatch workers efficiently to work areas and enforce the need for extra resource and/or alternative work processes required to maintain performance. Ensure that the Contractor follows projects Saudi Aramco STD/Procedures codes and other governing regulations. Ensure that the Contractor has obtained all necessary permits and licenses. Ensure the Contractor submits a 3-Week Look-Ahead Schedule on a weekly basis. Overall approval of Contractor Safety program and ensuring Safety program is strictly applied during all site activities. Ensure that the Contractor has issued the necessary requisition supplies and materials to meet the project construction Schedule. Monitor strictly the Contractor Procurement Schedule Study job specifications to determine appropriate construction methods. Evaluate construction methods and determine the cost-effectiveness of plans. Advise Project management on the timely identification of deviations from budget, schedule, quality, or safety. Ensure continuous presence of wood supervision if the Contractor is working during the night or outside project working hours. Ensure maintenance of daily records of all site activities, including information on labor and plant, and any non-compliant materials or workmanship. Manage the wood team of Site Engineers, Safety Officers, Inspectors, and any other person working at the actual Site. Take actions to deal with the results of delays, bad weather, or emergencies at the construction site.

Contract Representative Project Manager at M.R.AL KHATLAN CO.
  • Saudi Arabia - Dammam
  • June 2018 to June 2021

Develop and maintain effective working practices for the project management team. Provide, with full responsibility and accountability, leadership, and excellence in the achievement of coordinating both technical and governance through the Stages of the Project. Coordinated site supervision work, manage various contractors, and monitor progress of work. Oversaw all critical developments of project master program, including establishment of milestones and phasing. Ensured compliance with technical specifications and approving quality of main construction materials as per standards. Implemented HSE and monitoring adherence to safety standards and satisfactory work practices. Take full technical and commercial responsibility for execution of the contract in all matters covered within the terms of the contract (from initial contract review to project close-out) Identify and communicate project team objectives in accordance with the contract terms, scope of work and corporate policy. Organize the project team, define individual responsibilities, and motivate team members towards successful achievement of specified project goals, particularly through regular project meetings. Delegate work to the project team members in a manner that encourages individual responsibility. Provide guidance to internal and external stakeholders during project execution to meet project objectives. Oversee different contracting parties, owners, customers, government bodies and existing facilities in coordination. Manage complicated issues among different project phases and the existing facilities. Provide leadership and management for the PMT and EPC to ensure safe, cost effective and timely resolution of all interfaces. Be exposed to different cultures, backgrounds, and environments. Attend to and resolve conflicts, challenges and problems related to a large multi-cultural and multi-discipline technical workforce. Review / Validate detailed design and Engineering Deliverables. Participation in design review, 3D Model Reviews, Value Engineering, Risk Management workshops, constructability Reviews, PHSERs, IPR etc.
. Ensure compliance with Saudi Aramco standards. Compliance with Saudi Aramco Contract Schedule A, B, C, F, D, G, H, I, Q and S. Ensuring on time reporting as per Schedule B. Compliance with IKTVA & Saudization.

Project Manager at ARKAD Engineering & Construction Co.
  • Saudi Arabia - Dammam
  • July 2016 to July 2018

Directly reporting to the Project Director, the project manager will have responsibilities
To Manage and execute projects. Review & Evaluation of Request for Contract Release
Purchase Order (CRPO). Release Purchase Order (RPO) Acceptance or Rejection
Surveying, IFC Review & Evaluation, Comparison of IFC with Site Conditions IFC MTO
Comparison with MRS (Material Reconciliation Summary Sheet) Requesting Material
From Material Specialist of Design & Material Department (DMD) of Saudi Aramco.
Collection of Material from Saudi Aramco Warehouses Storage of Material at Contractor
Yard as per Saudi Aramco Approved Project Quality Plan (PQP) & Inspection & Test Plan
(ITP). Presenting Aramco Supplied Material & Contractor Supplied Material for Project
Inspection Department (PID) Inspection & Acceptance. Raising Technical Queries (TQs)to
Resolve Material Issues & Discrepancies along with IFC Variations. Weld Mapping & Shop
Drawing Finalization, Fabrication of Spools & Structural Items Pre-casting of Civil
Foundations. Cast in Place .Mobilization of Temporary Site Facilities Site Construction
Activities for Civil, Mechanical, Electrical, Instrumentation, Communication, SCADA, RTU,
Switch Rack, Switch Gear, OHPL, Fencing, Well Pad Extension etc. Raising Job Site
Instruction (JSI) Requests to execute change order works. Coordination for CRPO
Revision, Invoicing & Saudiazation. Implementation of Construction Site Safety Plan
(CSSP), Hazard Identification Plan (HIP), Emergency Response Plan (ERP), Job Safety
Analysis (JSA), Pre-Excavation Checklist. Certification for WPR, Operators & Riggers.
Coordination with Quality department for the implementation of PQP & ITP. Approval of
Welders JCC (PQR, WQT), QC Inspectors. Painting & Coating Supervisors, Painters,
Sandblasters & QC Supervisors. Coordination with Loss Prevention Department through
Saudi Aramco Project Management Team for TSF & Offices approval. Pre- Commissioning
& Commissioning Activities. Project Close Out.

Project Manager at AL Robaya Holding Company
  • Saudi Arabia - Jubail
  • May 2015 to June 2016

Directly reporting to the General Manager of Country, the project manager will have responsibilities to manage and execute projects to ensure the effective progression of a project from initial contact with a client to final account in order to achieve the company's objectives in relation to service, profitability and development with a functional authority over all aspects of the progression of designated projects. Validates Tenders and proposals and prepares report Assesses the feasibility of projects in relation to technical, financial and organization resources of the company. Client Management to ensure continuity and repeat orders on a negotiated basis. Discuss further proposals with the client and possible future projects and partnerships where feasible Develops and implements plans of action to meet client’s needs. Developing the client relationship/ developing a partnership as to meet client’s needs but keep company out of risk and in a profitable position. Take responsibility of any special engineering, design, location or scale factors affecting the project, by monitoring projects and solving problems proactively.
Scrutinize contract documents and identify and interpret the implications of any special features. Ensuring the content of the contract is fully understood and eliminating any areas of risk by setting up procedures to do so. Set up contractual documents for approval in accordance with procedures and authority of responsibility. Producing contractual documents for any variations, sub-contractors and future prospects. Establish budgets and controlling of such budgets to meet maximum profitability compile Scope of work consists of construction of new 105 km 16” sour gas pipeline project from KJO Khafji to Tanajib trap area, valve station, scraper &launcher, included all the mechanical/civil/electrical/telecommunication activity in the scope, etc.
Projects and ongoing work and monitoring them. Compile labor norms and approve final estimates. Compiling norms in the compilation and validation of costs for projects at tender stage within constraints of project operations. Determine project team size and make up with contracts by developing an organogram, interview team members, Establish site establishment and services. Requisition all site establishment and services and ensure that services are utilized and maintained. Hold on site meetings to establish any deviations and problems and take action to solve such.
Control total services on site, as QS, construction, estimating and engineering.
Ensure that all information is available to planners and detailed plan is drawn up. Set up procedures to ensure information is channeled to planning department and monitor such procedures and reports. Authorize and agree to plan prior to construction together with a timetable for scheduling and completing the project.
m

Project Manager at Essar Project Saudi Company
  • Saudi Arabia - Dammam
  • June 2014 to May 2015

Responsibilities includes Co-ordinate all projects/sites activity with responsibility for the execution of the project (EPCC Project) in compliance with all contractual requirements, ensure that resource usage is optimized to achieve, or exceed, projected profit margins. Occasionally leads proposal preparation efforts. Ensure a thorough understanding of the contract requirements and direct preliminary planning stages as necessary.Co-ordinate the work of the mobilization team to ensure that all necessary activities are reviewed with actions appropriately assigned, timescales agreed and relevant parties briefed with new communication channels established where ever necessary. Manage and coordinate the resourcing requirements for respective project segments, including staffing and plant to ensure that these are accurate and realistic and that any necessary steps needed to supply resources have been arranged. Co-ordinate, in construction with the Project Management Team, the development and establishment of the project planning package together with the mechanisms for monitoring subsequent progress against that plan. Ensure that corrective action is agreed and implemented at the appropriate level as and when variations from plans occur. Liaise with relevant staff to ensure that the project monitoring system is implemented adequately and that output on financial performance is reviewed at the appropriate level and frequency to ensure effective control of the project budget. Provide adequate resources and expertise on site to ensure the effective supervision, monitoring and control of the work being undertaken to ensure full compliance with all relevant standards policy and procedures.
Understand project insurance requirements and initiate action to secure coverage in line with contractual obligations. Review Safety and QA/QC project plans with respective functional heads and submit to client for approval. Resolve any contractual/legal matters and ensures that appropriate action Monitor the demobilization plans of the workforce and plant as the project progresses in order to facilitate the relocation of the workforce and the further utilization or disposal of plant. Act as the Company’s official representative with clients, suppliers, and third party contractors - negotiating terms and conditions where necessary, ensuring that Company interests are both optimized and protected.Monitor performance of suppliers and subcontractors to determine compliance with contractual obligations. Resolve issues arising from disputes or sub-standard performance. Monitor payments from clients and initiate payments to suppliers and sub-contractors ensuring all terms and conditions have been met. Manage the preparation and presentation of the final documentation and liaises with the client for the issuance of the acceptance certificate and release of performance bonds and bank guarantees. Participate in a formal review of the project with relevant parties on completion and identify opportunities for learning and development.

Project Manager at Madina Group W.L.L
  • Qatar - Doha
  • June 2013 to June 2014

Responsibilities includes co-ordination from E.P.C. bid preparation, including preliminary
Engineering designs, participation in pre bid and post bid negotionations, appointing
Engineering consultants, for detailed design engineering, technical specifications, for all
The equipments (i.e. vessels, tanks, drums, valves, piping’s, pumps and motors, electrical,
Instrumentation and control systems, etc.)
Preparation of detailed engineering and construction drawings, materials take off (B.O.Q.),
Material summaries, preparation of subcontract agreements-documents, for both
Equipments suppliers and construction contractors for various engineering disciplines,
Evaluation of offers, awarding of contracts for both supply as well as construction,
Planning and coordination, contract performance/ monitoring, manpower planning and
Control, quality assurance and control, health safety &environment, budgeting as per
Original estimates for each section, total coordination between inter discipline engineering
Like civil, mechanical, rotating and static equipment, process, electrical, instrumentation
&controls, for timely completion of project as per schedule, pre-commissioning, commissioning and handing over with all relevant documentation.
Process knowledge of multiproduct pipelines including handling of coated pipes,
Stringing Alignment welding, radiography, blasting and painting if required, heat shrinks
Sleeving Sand beding, laying in trench, holiday testing, backfilling, foam pigging, gauge
Pigging, air testing if required, water flushing /cleaning /filling, integrity testing (hydraulic
Testing), flushing, drying and Nitrogen purging/filling if required.
Also have basic knowledge of surface preparation (blasting) and painting internal pipe
Sleeving for sour lines, pipe line maintenance (pigging) including intelligent pigging, hot
Tapping and external sleeving
I am energetic person with sound and health personality and worked with various
Nationalities include, Middleast, Southeast, England, French, Dutch, and Germen etc.

Construction Manager at METAL. SERVICE Company
  • Saudi Arabia - Dammam
  • July 2011 to June 2013

Responsibilities includes co-ordination from E.P.C. bid preparation, including preliminary engineering designs, participation in pre bid and post bid negotiations, appointing engineering consultants, for detailed design engineering, technical specifications, for all the equipment’s (i.e. vessels, tanks, drums, valves, piping’s, pumps and motors, electrical, instrumentation and control systems, etc.)

Preparation of detailed engineering and construction drawings, material take off (B.O.Q.), Material summaries, preparation of subcontract agreements-documents, for both equipment’s suppliers and construction contractors for various engineering disciplines, evaluation of offers, awarding of contracts for both supply as well as construction, planning and coordination, contract performance/ monitoring, manpower planning and control, quality assurance and control, health safety &environment, budgeting as per original estimates for each section, total coordination between inter discipline engineering like civil, mechanical, rotating and static equipment, process, electrical, instrumentation &controls, (D.C.S., SCADA, PLC, PIMS, ESD, F&G SYSTEM etc.), for timely completion of project as per schedule, pre-commissioning, commissioning and handing over with all relevant documentation.
Process knowledge of multiproduct pipelines including handling of coated pipes, stringing Alignment welding, radiography, blasting and painting if required, heat shrinks sleeving Sand beding, laying in trench, holiday testing, backfilling, foam pigging, gauge pigging, air Testing if required, water flushing /cleaning /filling, integrity testing (hydraulic Testing), flushing, drying and Nitrogen purging/filling if required.
Also have basic knowledge of surface preparation (blasting) and painting internal pipe sleeving for sour lines, pipe line maintenance (pigging) including intelligent pigging, hot tapping and external sleeving

I am energetic person with sound and health personality and worked with various nationalities includes, Middleast, Southeast, England, French, Dutch, Germen etc.

Construction Manager at M.S.AL Suwaidi Company
  • Saudi Arabia - Dammam
  • December 2009 to March 2011

Consultants, clients, suppliers and subcontractors Requisition supplies and materials to
Complete construction projects Prepare and submits budget estimates and progress and
Cost tracking reports Develop and implement quality control programs take actions to
Deal with the results of delays, bad weather, or emergencies at construction site.
Confer with supervisory personnel, owners, contractors, and design professionals to
Discuss and resolve matters such as procedures, complaints, and construction
Problems. Plan, organize, and direct activities concerned with the construction and
Maintenance of structures, facilities, and systems.
Investigate damage, accidents, or delays at construction sites, to ensure that proper
Procedures are being carried out.


Knowledge of materials, methods, and the tools involved in the construction or repair of houses, buildings, or other structures such as highways and roads.

Knowledge of arithmetic, algebra, geometry, calculus, statistics, and their applications.

Design Knowledge of design techniques, tools, and principles involved in production of precision technical plans, blueprints, drawings, and models

Project Engineer at CCIC Company WLL
  • Qatar - Doha
  • January 2003 to July 2008

The Project Engineer bas the primary responsibility of producing a complete, accurate, biddable, and buildable set of plans for all the structures in a project. This responsibility should be performed with the least possible manpower expenditures.
The duties and traits of the Project Engineer that are cannon throughout Design are listed on the attached sheets. It should be noted that these duties may be extended or modified by factors such as the needs or desires of the Design Engineer, the Project Engineer's experience or the particular project requirements Reviews all preliminary reports including advance planning studies for the project. Proper shoulder widths, traffic and false work clearances, approach slab status, and adequate stream flow and scour provisions must be verified prior to developing the General Plan.
Investigates statements or site detain District reports which appear uneconomical
or inconsistent with policies.
Reviews bridge maintenance books and discusses with Bridge Maintenance Engineer for widening and rehabilitation projects.
Determines Seismic Retrofit and scour mitigation requirements on existing bridges to be modified.
Reviews locations of existing utilities for possible conflict and relocation. Establishes need to carry utilities or provide for future utilities.
Reviews prior corrunitrnents to other agencies and coordinates commitments and DOS policies with District proposals. Hydraulic and railroad issues are particularly important.Prepares and submits Type Selection memo. Schedules Type Selection meeting. Schedules strategy meetings for earthquake retrofit projects. Prepares and submits minutes of strategy meeting. m) Conducts site reviews as necessary

Piping Engineer at Abdullah H. Al Suwair Co
  • Saudi Arabia - Riyadh
  • January 2000 to January 2002

The Project Engineer bas the primary responsibility of producing a complete, accurate, biddable, and buildable set of plans for all the structures in a project. This responsibility should be performed with the least possible manpower expenditures.
The duties and traits of the Project Engineer that are cannon throughout Design are listed on the attached sheets. It should be noted that these duties may be extended or modified by factors such as the needs or desires of the Design Engineer, the Project Engineer's experience or the particular project requirements Reviews all preliminary reports including advance planning studies for the project. Proper shoulder widths, traffic and false work clearances, approach slab status, and adequate stream flow and scour provisions must be verified prior to developing the General Plan.
Investigates statements or site detain District reports which appear uneconomical
or inconsistent with policies.
Reviews bridge maintenance books and discusses with Bridge Maintenance Engineer for widening and rehabilitation projects.
Determines Seismic Retrofit and scour mitigation requirements on existing bridges to be modified.
Reviews locations of existing utilities for possible conflict and relocation. Establishes need to carry utilities or provide for future utilities.
Reviews prior corrunitrnents to other agencies and coordinates commitments and DOS policies with District proposals. Hydraulic and railroad issues are particularly important.Prepares and submits Type Selection memo. Schedules Type Selection meeting. Schedules strategy meetings for earthquake retrofit projects. Prepares and submits minutes of strategy meeting. m) Conducts site reviews as necessary

Education

Master's degree, Master of Business Administration - MBA
  • at Swiss Bussiness school
  • March 2021

Master of Business Administration - MBA

Bachelor's degree, MECHANICAL ENGINEERING
  • at Bangalore University India
  • January 2000

+

Specialties & Skills

Civil Works
Oil and Gas
Refinery
Project Managment
ENERGETIC
ENGINEER
LINE MAINTENANCE
MAINTENANCE
PACKAGING LINE
PAINTING
PROJECT ENGINEER
RADIOGRAPHY
Project Managment
Design Build
Ability to Project manage Multiple projects
Responsibilities includes co-ordination from E.P.C. bid preparation, including preliminary engineeri
Building and Construction - Knowledge of materials,
Quality
Project Managment
BUILDING CONSTRUCTION
High Rise Building Towers

Languages

Hindi
Expert
Arabic
Expert
English
Expert

Training and Certifications

PMI Risk Management Professional (PMI-RMP)® (Certificate)
Date Attended:
August 2022
Valid Until:
August 2025
Project Management Professional (PMP) Certified, Membership ID : 7184434‎, PMP®# 3010383. (Certificate)
Date Attended:
May 2012
Valid Until:
May 2024

Hobbies

  • Cricket
    I like to playing cricket