Mechanical Engineer
Olayan Descon
مجموع سنوات الخبرة :5 years, 9 أشهر
Fabrication and Erection of 95000 dia inch of piping, 1200 Ton of Structure erection and Installation of 90 Equipment’s. Supervision to all the activities foTurn Around Inspection & Corrective maintenance of Boiler, Turbine & its Auxiliaries Bearings Inspection & Alignment of ID Fans, FD Fans & GR Fans.
Construction of new chlorination plant in Rabigh Power plant:-Installation of rotary equipment like Pressure pump, Dosing pump, Air Dilation fan, Erection of Hypochlorite tank, Hypochlorite generator, GRP & SS Piping, Poly Propylene pipe line, Fabrication of Support, Testing & Commissioning.
TIMS (Tank Inventory Management System):- Installation of RADAR Gauge, LATIS Probe through fabricating the manhole on the tank, installation of conduits, Panels, Cabling, Testing & Commissioning In 8 Power Plant (53 Tanks).
MARS Project (King Abdullah Economic city):- Installation of firefighting pipe line, Water pipe line thorough Growing, threading and welding, Installation of Gate valve, Sprinkler, Fabrication of supports & Pressure Testing.
Maintenance of Boiler and rotary epuipment like FD FAN, ID FAN, GR FAN overhauling and Alignment in shoibah power plant during Shutdown period.
Construction of 360 MW china western boiler in Chattisgarh.