إقبال Hossain, Principal Engineer

إقبال Hossain

Principal Engineer

Saudi Arabian parsons LTD

البلد
المملكة العربية السعودية - جازان
التعليم
ماجستير, Civil Engineering (Environmental)
الخبرة
30 سنة, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :30 سنة, 9 أشهر

Principal Engineer في Saudi Arabian parsons LTD
  • المملكة العربية السعودية - جازان
  • أشغل هذه الوظيفة منذ فبراير 2019

I have been managing water/waste water infrastructure projects for Saudi Royal Commission at the JCPDI Project Site (Jazan). Two of these projects that I am currently doing design management are: 1. A 37-MLD Capacity Industrial Waste Water Treatment Plant servicing the Industrial Area of JCPDI. It is an EPC project with construction cost estimate is SAR 350 million. 2. A 35- MLD Process Water Facility to serve industrial users at JCPDI. It is an EPC project with construction cost estimate is approximately SAR 50 In addition, I have done design review of the following projects: 1. A 75-km Industrial Waste Water Piping Network for JCPDI. 2. A-70-km Process Water Piping Network for JCPDI

Senior Water/Wastewater Engineering Project Manager في RPS Group
  • الولايات المتحدة - تكساس
  • يونيو 2016 إلى أغسطس 2018

I was hired to lead the company's design team for the 400 MGD water treatment design-build project for the City of Houston. The entire project cost was estimated to be US $1.3 billions.

Senior Engineer II/Project Manager في AECOM/URS/BOYLE Engineering
  • الولايات المتحدة
  • فبراير 2008 إلى فبراير 2016

I managed projects from planning to construction phases. I prepared project budget and schedule and assign tasks to younger engineers. I supervised younger engineers, construction inspectors and CADD technicians. I provided technical leadership on studies, design and construction of water/wastewater system projects, including site work, piping, structures, roadway, and buildings for equipment and operating staff. I helped clients during project bid phase and managed construction phase including shop drawing review, pay estimate review and approval, RFI reviews, change order negotiation, and operation assistance. Major projects with this employer are:

1. Rotonda WWTP, Charlotte County, FL - Project Manager for this $18 million dollars construction project which was completed in July 2009. The main components of this project were: Fine Screens, Washers/Compactors, Grit Removal Facility, EQ tanks, Anoxic/Aerobic Tanks, MBR tanks, Chlorine Contact Tanks, ground storage tanks, sludge holding tanks, numerous pump stations, new operation building, piping, civil site grading, roadways, stormwater detention ponds, electrical and instrumentation and control.

2. Cove Stormwater Pumping Station Impr., City of Naples, Florida - Technical Leader for design of a large stormwater pumping station improvement project. The project included: replacement of three diesel engine drive mixed flow pumps (25, 000 gpm each); installation of two mechanical bar screens; pump station building architectural and ventilation improvements; a stand-by power generator; lighting improvements; new instrumentation and control for pumps and bar screen; site work; landscaping and irrigation. Construction cost was $2.8 million.

Project Manager/Lead Engineer في Hibbs and Todd, Inc
  • الولايات المتحدة
  • سبتمبر 2009 إلى مايو 2013

I was hired by this employer to lead/manage civil engineering projects, especially water/wastewater system projects throughout Texas. Typically, a project starts with a concept followed by studies, design, and finally construction and start-up. I manage all phases of civil engineering projects. My specialty is to lead design (construction drawing preparation) and construction management of projects. I also coordinate and negotiate regulatory and funding agencies during project design and construction.

I prepare project budget and schedule, develop project guidelines, and monitor project progress. I conduct QA/QC review of projects during design and constructability review before projects go to construction.

During construction, I manage both engineering and construction staff. I conduct site visits, determine project progress, review and approve contractor's payment request. I lead negotiation with contractor for change orders and other construction disputes.

Sr. Project Manager في WilsonMiller, Inc
  • الولايات المتحدة
  • يونيو 2005 إلى فبراير 2008

I managed day-to-day operation of WilsonMiller's Water/Wastewater Engineering Group. The group consisted of engineers, CAD technicians and other employees.
I also managed design and construction of numerous water and wastewater projects from design through construction. I negotiated contracts with clients and contractors. As part of the project management, I monitored budget and work schedule, and supervised project team during the design and construction phases of all projects. Major project with this employer were:

1. Utility Relocation at Daniels Pkwy. & I-75 Interchange, Lee County, Florida - Project Manager for relocation of the existing 30-inch water main and installation of a new 30-inch casing pipe under I-75 at Daniels Parkway for the Lee County Utilities, Inc. The Florida DOT was in the process of expanding I-75 at Daniels Parkway, which required the relocation of the existing utilities. First, an optimal pipe route was determined based cost and ease of construction. After the pipe route was selected, plans and profiles were prepared for a new 42-inch ductile iron pope crossing under I-75. Plan and profiles were also prepared for installation of a 30-inch casing pipe under I-75 for future wastewater forcemain connection. Estimated construction cost was approximately $ 3.5 million.

2. Potable Water Mains for GPIWA, Lee County, Florida - Lead Engineer for design & construction of two sub-aqueous potable water mains (12- & 16-inch) for GPIWA. The first part of the project involved design and services during construction of approximately 600 linear feet of 12-inch water main under Sandy Hook Bridge using HDD technology. Both ends of the new pipe were connected to the existing pipe. The pipe material of the new pipe was HDPE. The second part of the project involved designing and providing design services during construction of a 16-inch HDPE pipe under Matlacha Pass using HDD technology. The construction cost for both phases was $1.2 million

Sr. Principal Engineer في Hazen and Sawyer, P.C.
  • الولايات المتحدة
  • أكتوبر 2003 إلى مارس 2005

I was Senior Principal Engineer for a project titled "300 MGD Croton Water Treatment Plant -Eastview Site, New York". I was Task Leader for final design of eight chemical feed systems including bulk storage tanks, and a 50 HP pump station. The project was fast track and final design was completed in one year. The chemical feed systems that were included in this project were: sulfuric acid, phosphoric acid, aluminum sulfate/polyaluminum chloride, sodium hydroxide, cationic polymer, anionic polymer, hydrofluosilicic acid, and sodium hypochlorite. I supervised 2 to 3 engineers and 2 CADD technicians.

Sr. Project Engineer في Malcolm Pirnie
  • الولايات المتحدة
  • ديسمبر 2000 إلى أكتوبر 2003

I was a Project Engineer for two large project for the New York City DEP. One of the project was titled "Reconstruction of Delaware Aqueduct Shafts 9, 10, and 17, New York City Department of Environmental Protection". My responsibilities included detailed design of replacing all sluice gates and operators in shafts; adding of sodium bisulfite feed facilities at Shafts 9 and 17; adding caustic and alum facilities at Shaft 17; installing gaseous chlorination facilities at Shaft 10; replacing all dewatering and sump pumps; adding chlorine gas scrubber at Shaft 10; constructing a water quality station in each shaft; and renovating house water system at each shaft. I managed 4 to 5 younger engineers and 2 to 3 CAD technicians. The construction costs was estimated to be $10 million.

The second project was titled " Process Performance and Odor Minimization at North River WPCP, New York City DEP". I was project engineer for improvements to the 170-MGD North River WPCP. Project consisted of: addition of process blower, modifications to the secondary bypass system, rehabilitation of the North and South odor control systems, modifications of the digester overflow boxes and gas holder ventilation system, additions of new odor control scrubbers and carbon adsorbers to both North and South odor control facilities, modifications to the thickener room and final setting tanks ventilation, and other miscellaneous improvements.

Design Engineer, Project Engineer, Project Manager في Freese and Nichols, Inc.
  • الولايات المتحدة
  • سبتمبر 1992 إلى ديسمبر 2000

I started as Design Engineer and left the company as Project Manager. I worked eight and an half years on many projects involving planning, studies, design and construction services of water/wastewater treatment plants, pipelines & pumping stations. In the early years of my career, I worked with Licensed Engineers & designed water/wastewater treatment facilities, wrote preliminary and final design reports, prepared technical specifications, & estimated construction costs. I also have done numerous studies evaluating both conventional & advanced water and wastewater treatment processes, such as ion exchange, ozonation, membranes, RO, SBRs etc. to implement Federal Safe Drinking Water & Water Pollution Control Acts.

After being Licensed Engineer in '98, I started managing projects from design through construction. I managed projects with construction costs ranged from $1.4 to 15 million. Major project with this employer are:

1. Wastewater Treatment Facility, City of Vernon, TX - Project Manager for the 1.7-mgd plant's ultraviolet disinfection system, two effluent sand filters, modifications to the grit processing facility, piping, site work, an effluent metering box with V-notch weir and instrumentation and control. Wrote specifications and prepared construction documents and cost estimate. Assisted owner in advertising the project and selecting the successful bidder. Performed construction administration. Construction cost was $1.2 million.

2. Lake Ray Roberts WTP Design/ Ozonation Facility, City of Denton, Texas - Lead Engineer for preliminary & final design of a 20-MGD conventional surface water treatment plant w/ pre- and intermediate ozonation process. Construction cost was $15 million.

الخلفية التعليمية

ماجستير, Civil Engineering (Environmental)
  • في The University of Texas at Arlington
  • ديسمبر 1992
بكالوريوس, Civil Engineering
  • في Bangladesh University of Engineering and Technology
  • أغسطس 1988

Specialties & Skills

Instrumentation
Installation
Operation
Ventilation
MS Suites, Word, Excel, Project, PowerPoint

اللغات

الانجليزية
متمرّس
البنغالي
متمرّس

العضويات

American Water Works Association
  • member
  • September 1992
Water Environment Federation (WEF)
  • Member
  • September 1992