PPSM Analyst (Infrastructure)
Accenture
Total years of experience :17 years, 5 Months
Key Responsibilities
• Technical requirements analysis and gap analysis
• Design, development, and implementation of hardware solutions, systems, or products.
• Project based Cost Analysis
• Project Co-ordination.
• Create systematic and consistent requirements specifications in both technical and user-friendly language
• BOQ and BOM preparation on site survey.
• Vendor management with Product Evaluation both of OEM and Local OEM.
• Tier-III (TIA-942) or Mission Critical Data Center Infrastructure Solution
• Structure cabling as per Tier-III Data Center.
• Ensure high availability of Data Centre resources and associated infrastructure like, Network Equipment, Server- storage, Generators, UPS, Automatic Fire-Fighting systems, Environment Monitoring System, Air-conditioning and Precision Air Conditioning etc.
• Ensure safety and security of all IT resources. Also ensure that all IT resources are maintained under proper environmental conditions
• Coordinating with all stake holders (Business users, Applications development groups, Technical Support & Infrastructure Groups) and external service suppliers to ensure good service levels
Achievement:
• Successfully handle a large Tier-III Data Center (5000sft) Project of Bangladesh Govt.
• Maintaining a large GSM Company(Grameenphone Ltd/Telenor) Data Center and Disaster recovery center
• Successfully Completed a large Government and Private Bank of Bangladesh Core Banking Data Center
Working with Customer
• Met with channels/customers to understand their current technical environment, key business issues/drivers, and future technology requirements
• Worked closely with customers on the technical requirements to provide technical solutions - Identified requirements, including technical details sufficient for product definition.
• Developed and established strong relationships with strategic clients and industry partners.
• Provided product updates and technical advice to clients - Explained technical capabilities and business benefits of solutions to the customer from engineering level to senior executives.
• Presented the company products to clients - Showcased drivers and value that supported the business case for the total cost of ownership to the customer.
Working with Delivery Team
• Provide End to End design using AutoCAD(2D) related on Data Center Implementation
• Actual Bill of quantity (BOQ) and Bill of material (BOM) preparation based on Data Center requirements including facilities, Server, Storage, Network and structure cabling etc.
• All kinds Architectural design of Tier-3 (TIA-3) Data Center Infrastructure Solution
• Power Solution with Single Line Diagram on the basis of actual load both of IT and Non-IT.
• Automatic Fire Fighting with Detection system design depends on GAS
• Specific Design for Precision Air conditioner installation and Commissioning.
• Pre-sales and Post-sales Support
Key Initiatives and Achievements
• Architectural design some of the most complex solutions using the latest technology in the field of Passive Product (Physical Environment, Total Power solution both of IT and Non IT Product, Online UPS 10 to 250KVA, Automatic Fire Fighting System, Detection System, Cooling System, Structure Cabling etc) of Data Center Infrastructure Facilities.
• Initiated pre-sales activities, consulting services and products - Developed projects’ scopes (SOW, scope of work) and prepared proposals.
• Performed competitive analyses based on market competitor.
• Vendor management and Technical evolution both of OEM and SI.
• Attended industry trade shows, exhibitions, seminars and training sessions to promote products and services.
Assignments:
Was a part of implementation process and was assigned the task of Installing, configuring and managing the server.
Activities performed:
● HMC configuration for managing the pSystems.
● Creation and modification of LPAR:
a. Profile creation and modification.
b. Allocation of Hardware resources based on the requirement.
● Installation and Configuration of NIM:
a. Installing and configuring NIM Master Database for diskless installation.
b. Creating NIM resources (mksysb, spot)
c. Defining client in the NIM Master Database.
d. Deployment of NIM Client.
● Installation and Configuration of AIX Operating System:
a. Installation, migration and maintenance of AIX operating systems.
b. New system planning, System related problem determination and resolution.
c. Keeping the complete backup of the system and restoring data in the event of disk failure.
d. Device management, including adding, changing, and configuring physical and logical devices.
e. User Management - Creating, maintaining, and removing users and groups. Security settings on user accounts and groups.
f. System Administration and performance monitoring Task on AIX servers.
g. File system management using LVM.
h. User, Patch and Security Management, Problem determination.
i. Management of Health checking issues and actions.
j. Troubleshooting hardware and operating system problems.
k. Troubleshooting network and system related problems.
l. Troubleshooting booting related issues, creating boot records, working with system maintenance mode, accessing rootvg in system maintenance mode, recovering root password, fixing booting related issues, working with bootlist.
m. Disk Storage Management in AIX - Logical and Physical Volume management, configuring disks, working with volume groups, logical volumes, and physical volumes.
n. Mirroring volumes groups, logical volumes and working ODM and VGDA and fixing related issues.
o. Working with paging spaces - creation, increase, decrease paging spaces as per the requirement.
Job Responsibilities
• Prepare all kinds of design using AutoCAD(2D)
• Data Center Infrastructure facilities Solution
• Total Power Solution including Generator, UPS, AVR etc.
• Online UPS Installation Commissioning & Trouble shooting.
• Automatic Fire Fighting System installation Commissioning & Trouble shooting
• Environmental Monitoring System installation, Commissioning & Trouble shooting
• Precision Air conditioner installation, Commissioning & Trouble shooting
• Support the pre-sales and after sales team directly
• Successfully handled 6000sft or 56 meter2 Data Center maintenance works.
• Support using Service Level Agreement(SLA)
Khulna University B.Sc in Electronics and Communication Engineering-December- 2006 (Completed 160 Credits out of 160 Credits) Major in ECE, CGPA 3.13/ 4.0