MEP Engineer
Orbis Fitout Technical Services
Total years of experience :12 years, 5 Months
⦿ Managing a team of Engineers and draftsmen.
⦿ Involvement in project estimation for design and built projects.
⦿Implemented step‑wise process for Schematic design, detail design, shop drawings preparation, and execution methodology for design and built
projects.
⦿ Coordination with Client, Architect, and other services design teams.
⦿ Performing and verification of calculations for Mechanical utilities i.e. HVAC, Water supply, drainage, LPG, etc.
⦿ Preparation of project‑specific specifications as per the client's requirement.
⦿Finalizing equipment selection as per the project requirement.
⦿ Inspection and Quality evaluation of Execution of MEP works for the project.
➼ Mentionable Healthcare Projects:
1. Latifa Hospital Extension Project
2. Emirates Speciality Hospital
3. Al Yusuf Medical Center
4. KG4YOU Medical Center
5. Sharjah Medical Center
Mentionable Other Projects:
1. FujiFilm Showroom, Jafza
2. Design Cluster Ummramool
3. Hilton Hotel Sharjah
4. Toyota Showroom/service Center - Al Futtaim
5. EXPO2020 Concorsers
6. Polish Pavilion - EXPO2020
Project‑Based Job:
⦿ Developed project basic concept
⦿ Performed design calculations
⦿ Prepared detail design of HVAC and Plumbing systems.
⦿ Coordinated with Client, Architect, and other services team members.
⦿ Developed the project‑based specifications, Drawings, BOQ, and tender documents.
➼Projects Executed:
1. Lulu Logistics Hub.
2. G+3 ‑ Diyafah School
3. Cold Storage facility for Lulu
⦿ Developed concept & detailed design of HVAC and Plumbing systems.
⦿ Prepared shop drawings after performing different calculations.
⦿ Sized and developed schematics & layout drawings of different systems.
⦿ Prepared Project Plan execution plan along with resource planning, Coordinated (Co‑ordination with client, architect, electrical & utility depts., interior designer, vendors, contractors, and other agencies) to sort
out Engineering & Coordination issues for MEP services.
⦿ Preparation & approval of method statements, monitoring site work progress, assistance in inspection, testing, and commissioning of the
HVAC system.
➼Mentionable Healthcare Projects:
1. Ortus Hospital, Dubai
2. Bin Kamil Hospital, Sharjah
3. One Day hospital, Sharjah
Mentionable Other Projects:
1. Vieco Pharma, Dubai
2. MTB Car Parking Terminal - Air Port Abu Dhabi
3. Al Qasar Hotel - Madinat Jumeirah refurbishment works
4. Sky Restaurant - Opera House
⦿ Performed Design & Engineering activities including concept development & detailed design of Public Health (Waters - Water Supply
and Drainage) and HVAC system (including cooling/heating load
estimation), equipment sizing /selection.
⦿ Sized and developed schematics & layout drawings of different systems.
⦿ Prepared specification documents including BOQ estimation, cost estimation for the entire HVAC system, floated inquiry, evaluated
bids/quotation, negotiated with vendors, evaluation of material
submittals, etc.
➼ Mentionable Healthcare Projects:
1. Medicare Hospital
2. Shaikh Zayed Hospital
Mentionable Other Projects:
1. EBM
2. IndusPharma Dynatis
3. Artistic Milliners
⦿ Prepared and involved in the below‑mentioned activities:
⦿ Space Markup for Shafts allocation.
⦿ Load Calculation on HAP and preparation of Load Calculation Sheet.
⦿ Prepared Preliminary layout of AC Ducting and piping.
⦿ Duct sizing and Air Devices Selection/ Sizing.
⦿ AutoCAD Design - HVAC.
⦿ Riser Drawings (CHWS‑R, Fresh Air, Exhaust Air).
⦿ Basement Ventilation Calculation according to Dubai Municipality regulations.
⦿ Stair Pressurization and zone smoke control calculations.
⦿ Equipment Schedules.
⦿ Comparison of AHU’s and FCU’s Submittals from suppliers for Selection.
⦿ Verifying Contractor’s running bills.
⦿ A thorough study of existing Drawings and Value Engineering reports in the case of Value Engineering.
➼ Mentionable Projects:
1. Tabba Heart Hospital, Karachi
2. Shooting Range Facility, Qatar
⦿ Prepared and involved in the below‑mentioned activities:
⦿ Space Markup for Shafts allocation.
⦿ Load Calculation on HAP and preparation of Load Calculation Sheet.
⦿ Prepared Preliminary layout of AC Ducting and piping.
⦿ Duct sizing and Air Devices Selection/ Sizing.
⦿ AutoCAD Design - HVAC.
⦿ Riser Drawings (CHWS‑R, Fresh Air, Exhaust Air).
⦿ Stair Pressurization and zone smoke control calculations.
⦿ Equipment Schedules.
⦿ Comparison of AHU’s and FCU’s Submittals from suppliers for Selection.
⦿ Verifying Contractor’s running bills.
⦿ A thorough study of existing Drawings and Value Engineering reports in the case of Value Engineering.
➼Mentionable Projects:
1. Nib Bank - PNSC Building, Karachi
2. World Trade Center, Islamabad
3. Aisha Steel Mills, Karachi
4. Indus Pharma, Karachi