Work Experience

Total years of experience :13 years, 7 Months

Senior Mechanical Engineer at China State Construction Engineering Corp. Egypt
  • Egypt - Cairo
  • My current job since November 2019

- Prepare and submit work inspection requests, method statement, checklists and ITP.
- Prepare / review Material submittal & shopdrawing
- Maintain continuous inspection of all construction activities to assure a high standard
quality in accordance with the applicable codes and standards.
- Review suppliers inspection and test plans against the milestone scope of work.
- Ensure proper quality of the delivered materials.
- Resolve any discrepancies between the completed milestone and quality documentation.
- Coordinate with the site construction team on all quality issues and assist subcontractors
- Monitor and control the status of punch list and exception lists relevant to quality dossiers.
- Studying & evaluating the projects in tender and in-hand stage providing the technical &
financial proposals with the complete internal cost estimation.

Mechanical Engineer at American International
  • Qatar - Doha
  • December 2017 to September 2018

1- American International Contractors -(Archirodon) - December 2017-Till present (Doha-Qatar) :
 SHIELD 5 Program Project- US Army Corps of Engineers (USAE)
 Job Title: Mechanical Engineer
 Duties & Responsibilities:
1. Supervise Preparation of Shop Drawings.
2. Supervise preparation of Material Submittals, Method of Statements and O&M Manuals, Testing, commissioning & start up.
3. Supervise all procurement procedures.
4. Site supervision of all Mechanical services installation.

MEP COORDINATOR at BLUU QATAR
  • Qatar
  • November 2016 to December 2017

1. Distribution of tasks and duties, to assure effective workflow and facilitate
operations.
2. Supervise Preparation of Design & Shop Drawings for MEP SYSTEM
3. Supervise preparation of Material Submittals, Method Statements and
O&M Manuals, Testing, commissioning & start up.
4. Site supervision of all MEP services installation.
5. Monthly Interim Payments Evaluation for all works done at site, to submit
it to the client.
6. Attending technical meetings with client, consultant and designer.
Main projects in BLUU QATAR :
A- QNBFS -ALSADD CLUB BRANCH
* Project Owner: QNB
* Project Consultant: APG
* Project Main Contractor: BLUU QATAR
* Period: 105 DAYS
B- NUSR-ET restaurant @ Sheraton hotel
* Project Owner: ALSARA-QATAR/G2G-EGYPT
* Project Consultant: ERGA
* Project Main Contractor: BLUU QATAR
* Period: 8 Months

Project engineer at CENTRA Corporation
  • Qatar
  • March 2013 to November 2016

for Fire Fighting and Fire Alarm works.
2. Distribution of tasks and duties, to assure effective workflow and facilitate
operations.
3. Supervise Preparation of Design & Shop Drawings for Fire Fighting and Fire
Alarm Systems.
4. Supervise preparation of Material Submittals, Method Statements and O&M Manuals.
5. Site supervision of all services (conventional water sprinkler, fire hydrant, fire hose
reels, fire pump room, conventional & addressable fire alarm and IG541
& FM200 gas suppression c/w detection systems)
6. Prepare Material orders as per site conditions and following store reports.
7. Studying & evaluating the projects in tender and in-hand stage providing the
technical & financial proposals with the complete internal cost estimation.
8. Monthly Interim Payments Evaluation for all works done at site, to submit it to the
client.
9. Testing & Commissioning for the Fire Fighting and Fire Alarm Systems.
10. Attending technical meetings with client, consultant and designer.
Main projects in CENTRA Corporation :
A- West Bay - Qatar cool district plant 3
* Job Title: Project Engineer
* Project Owner: Qatar Cool
* Project Consultant: DAR AL-HANDASAH SHAIR AND PARTNERS
* Project Main Contractor: Aljaber Engineering
* Period: 9 Months
Achievements
* Installing, testing & commissioning of FM200 & FOAM Systems for 13 rooms.
* Installing, testing & commissioning of Detection system .

Technical support at THAWIZA MEP
  • March 2011 to February 2013

& site supervision of all services (fire sprinklers,
hydrant, fire hose reels, fire pump room, fire alarm & detection, VESDA, and high pressure
standard wet, deluge &pre-action water mist systems).
2- Preparing all Drawing, documentation & technical details following manufacturers
recommendation and Qatar Civil Defense regulations.
3- Technical support & site supervision of all services (Duct Spilt, mechanical ventilation
including jet fans)
4- Technical office & site engineer of some small projects for gas suppression &
detection and kitchen fire suppression systems.
5- Handling all Communications in between THAWIZA and their suppliers in
Spain and UK.
6- Studying & evaluating the projects in tender and in-hand stage providing the
technical & financial proposals with the complete internal cost estimation.
Main projects in THAWIZA MEP :
A- MEEZA DATA CENTRES MV2.

marine engineer at National Navigation Company
  • Egypt
  • February 2010 to December 2010

Operating & maintenance for all mechanical
equipment on the Ship (Main diesel engine, generators, purifiers, pumps & air
compressors .

marine engineer at El Nile Co
  • United States
  • August 2009 to January 2010

Operating & maintenance for all mechanical
equipment on the Ship (Main diesel engine, generators, purifiers, pumps & air
compressors .
Interpersonal skills:
* Able to get along with co-workers and accept supervision.
* Able to work for long hours to get my job done.
* Decision making, critical thinking, organizing and planning.
* Hard working, self-motivated, analytical and proactive.

Project Engineer at B- Development of Barzan camp 2 – Package 5
  • to
Project Owner
  • to

Private Engineering Office (PEO)
* Project Consultant: TECNITAL
* Project Main Contractor: Petro serve
* Period: 24 Months

Project Engineer
  • to

Project Owner: Ashghal
* Project Consultant: Parsons
* Project Main Contractor: NAS, Aljaber Engineering & Petro serve .
* Period: 14 Months
Achievements
* Design, Installing, testing & commissioning of Inergen-IG541 & detection
Systems for 24 pump stations.
D- Sewage tanker receiving station @ Lusail
* Job Title: Project Engineer
* Project Owner: Qatari Diar Real State
* Project Consultant: HYDER
* Project Main Contractor: REDCO INT.
* Period: 10 Months
Achievements
* Design, Installing, testing &commissioning of the firefighting pump set Pump
Room.
* Installation, testing &commissioning of the Fire hose cabinets & fire network
including gate valves, HDPE pipes for the external network(Infrastructure).

Project Engineer at E- PROPOSED 3B+M+G+10 Building
  • to
Project Owner at ALBADER GROUP
  • to
Project Consultant at ASSOCIATED CONSULTING ENGINEERS
  • United Arab Emirates
  • to

Project Main Contractor: ALBADER GROUP .
* Period: 26 Months

Project Engineer
  • to
Project Owner
  • to

Qatar Foundation
* Project Consultant: ARUP ASSOCIATES
* Project Main Contractor: HARINSA QATAR .
* Period: 18 Months
Achievements
* Design, Installing, testing & commissioning of Inergen-IG541 & detection
Systems.
* Design, Installation, testing &commissioning of the Fire sprinkler network,
Fire hose cabinets & fire network including gate valves, DI pipes .
B- BIN OMRAN COMMERCIAL BUILDING
* Project Owner: HAWA'A ABD ALRAHMAN AL-MANSOOR
* Project Main Contractor: ROYAL ABJERTRAD.&CONT.
* Period: 12 Months .

Education

Bachelor's degree, Marine Engineering
  • at Alexandria University
  • January 2009

Specialties & Skills

Fire Fighting
Fire Alarm
Plumbing
Ventilation
ENGINEERING
FINANCIAL
PROPOSAL WRITING
SUPERVISORY SKILLS
CONSULTING
CUSTOMER RELATIONS
DOCUMENTATION
GRAPHIC DESIGN

Languages

Arabic
Expert
English
Expert