إسلام نور الدين, Technical offices Manager JV Projects – Operation department

إسلام نور الدين

Technical offices Manager JV Projects – Operation department

Rowad Modern engineering

البلد
مصر
التعليم
بكالوريوس, civil Engineering
الخبرات
22 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 0 أشهر

Technical offices Manager JV Projects – Operation department في Rowad Modern engineering
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ مايو 2023

• Manage and monitor the technical office
Managers for the Joint venture Projects by
Monthly reports.
• Support the technical office Managers for JV
projects to solve any obstacles/problem in their
project.
Following up projects:
1. High speed Rail 6th October workshop -
Egypt (Rowad modern engineering &
Gamma).
2. Roads & Bridges Projects in Libya
(Orascom-Hassan Allam-Rowad modern
engineering & NEOM).

Estimation Support Manager – Tender department في Rowad Modern engineering
  • مصر - القاهرة
  • يناير 2021 إلى أبريل 2023

• Manage and monitor the overall performance of the Estimation Support team to obtain cost-efficient high quality offers from suppliers & subcontractors.
• Support to Tender teams with offers that comply with the specification requirements for the project in the tendering stage.
• Tendering Studying Projects:
1. NBKE Head Quarters in Administrative Capital
-Fit out & MEP Package (Administrational)
2. American International School - Uptown cairo
(Educational).
3. EIPICO 3 medicine factory (Industrial) -
Awarded
4. Badya University-Phase 1-6th October
(Educational)
5. Dakahlia Upgrade-Cotton & Textile (Industrial).
6. Creeks Urban K - 5th settlement (Residential).
7. Tameer UBL- 5th settlement (Residential).
8. Ora Zed East Club - 5th settlement (Club)
9. Ora Zed East Phase 1 - 5th settlement
(Residential)
10. Ora Zed East Phase 1 - 5th settlement
(Residential)
11. SODIC-VYE-Phase 1 - 6th October (Residential)
12. Alamein Towers -Two Towers \[G+20 Floors &
G+40Floors\] (Residential)
13. Dabaa NPP-Doosan-Civil & Arch (Power
stations)
14. Blue Vert - District R7 - New administrative
Capital (Residential)
15. Manmade Textile Factory (Industrial)
16. Noon BTS Warehouse (Industrial)
17. East Port Said -RoRo Terminal (Ports)
18. Rotana Hotel - Luxor (Hotel)
19. Noor City - PKG#3 - New administrative
Capital (Residential)
20. UTC PKG#173 - Sports club Main Building -
Uptown Cairo (Club)
21. Capital med Medical city - Badr city (Hospital)

Head section - Tendering department في Rowad modern engineering
  • مصر - القاهرة
  • نوفمبر 2018 إلى ديسمبر 2020

• Manage, direct, and monitor the overall performance of the tender process team to obtain maximum efficiency, quality, service and profitability for the organization.
• Support to all other departments with tender-related issues for Direct awarded project & Tendering Study projects.
Projects:
A) Direct Awarded projects:
1) Army Projects:
a- Ministry Buildings in new administrative
capital:
1) Ministry of Awqaf 2) Ministry of education
3) Ministry of higher education
4) National media Authority
5) Head office of administrative capital for
Urban (ACUD))
b- Olympic Sport Hall 15000 seats in new
administrative capital.
c- Mansoura University-Faculty of Medicine
Extension.
d-Air Defense College in Kayan.
e- Roads & Bridges projects:
- Safir Square Bridge. - El Hegaz square Bridge.
- Abbas el Akkad Bridge.
2) The Ministry of Transport Projects:
- Expansion of Ring Road (Maryoutia)
- Expansion of Ring Road (El Marg).
- Mit Ghamer - Dakadous Bridge
- Expansion of Damietta port.
3) Government Projects:
a) The New Urban Communities Authority
Projects (Residential & infrastructure
projects) - New administrative capital :

• District R05 Residential (4 clusters each
cluster contains 7 to 8 buildings - GR +6
Floors & GR +8 Floors)

• Infrastructure project in District Gov. (2) &
Diplomatic District
b) Tendering Studying projects:
1) The New Urban Communities Authority
Projects 6th October:
• Infrastructure Works for 6th Oct. Main
Lines

2) The Ministry of Electricity and Renewable
Energy Projects:

• Dabaa Administration building
• AL Arish Simple Cycle Power Plant (JV RME
& El Sewedy)
3) Holding Company for water & wastewater
Projects:
• Kafr El-Sahel WWTP-Tanta upgrade
Capacity from (5000 m3 to 7500 m3)
• Sohag west WWTP upgrade capacity from
(22000 m3 to 37000 m3)
4) Private Sector Projects:
• New Giza university phase 2 (Medical,
Dental, pharmacy, Student center,
Utility Building extension) - 6th October -
Giza
• NBKE Head Quarters in Administrative
Capital - Core & shell (Leeds requirement
golden Certificate)

• Kemet Administration building in new
administrative Capital.
• New Head Quarters for the Arab
Organization for Industrials in new admin.
Capital.
5) International Projects:

• Rufiji Bridge - Tanzania.
• Rufiji Switch yard 400 KV - Tanzania.

Technical office Manager في Rowad Modern Engineering
  • مصر - القاهرة
  • أكتوبر 2015 إلى أكتوبر 2018

Project : UPTOWN CAIRO-PKG#53 (11 Residential Buildings)-Sierra (Civil, Finishing, MEP works, ...etc)

• Client : EMAAR
• Management Consultant : TURNER
• Technical Consultant : ACE Consulting engineers
(Moharram.Bakhoum)
• Projects Costs: 350 Million L.E

Technical office Manager في Rowad for Modern Engineering
  • مصر - القاهرة
  • يناير 2013 إلى سبتمبر 2015

Project: Rehabilitation and Expansion of cairo international Airport terminal Building no.(2) - (Building (A) - Building (C) zone C1&C1 -Passenger Board Building & Infra works (sewer, Storm, Duct banks, Domestic & Firefighting networks)

• Client : Cairo Airport Company (CAC)
• Consultant : Engineering consultant group (ECG), Hill
International & Netherland Airport Consultants B.V. (NACO)
• Main Contractor : Limak Insaat (Turkish Company)
• Projects Costs: 120 Million L.E

Technical office Manger في Rowad for Modern Engineering
  • مصر - القاهرة
  • أكتوبر 2012 إلى ديسمبر 2012

Project : Pakistan International School Cairo (PISC) (6th October)
• Client : Embassy of the Islamic republic of Pakistan
• Consultant : AL Amaar Consulting Group (AMG)
• Main Contractor : Rowad Modern Engineering
• Projects Costs: 40 Million L.E

Technical office Manager في Rowad for Modern Engineering
  • مصر - القاهرة
  • مايو 2011 إلى سبتمبر 2012

Project : (CFC Substation 22-66 KV (New Cairo)

• Client : El Futtaim
• Consultant :ECG
• Main Contractor : Carillion
• Sub-Contractor :ABB
• Projects Costs: 14 Million L.E
• Position: Technical office Manager

Projects coordinator (administration) في Rowad for Modern Engineering
  • مصر - القاهرة
  • نوفمبر 2009 إلى أبريل 2011

• Projects Costs: 100 Million L.E

For the following Projects:

a) Dahsour Strip Mall "Auto ville " (allgeria): (from 24th may 2010
till May2011)(Consultant: Al Amaar Consulting Group, Owner:
Sodic Garden City)
b) Marassi Water tank 10000 m3: (from 23th may 2010 till May
2011) (Main Contractor: Turner, Consultant: ACE Consulting
engineers Moharam bakhoum, Owner: Emaar Misr)
c) Mashtal Power Station: (from 25th may 2009 till May 2011)
(Main Contractor: Areva, Owner: Ministry of Electricity)
d) Cairo Festival City (CFC): (from 22 th July 2009 till May 2011)
(Main Contractor: Orascom & Carillion JV, |Consultant: ECG,
Owner: Al Fuattem)
f) El Sewedy Administration Building (New Cairo): (from 21st may
2009 till May 2011) (Consultant: ECG, Owner: El Sewedy for
Cables)
e) CAIRO WEST 500KV GIS SWITCHYARD EXTENSION: (from
1st August 2009 till 1st October 2010) (Main Contractor: Areva,
Consultant: PEGESCO, Owner: Ministry of Electricity)
g) Glass Factory Sphinx (Sadat): (from 1st august 2009 till 30 June
2010) (Consultant: CDEC (Center of design & Engineering
Consulting Prof. Dr M. El Zanaty & Prof. Dr A. El Zanaty, Main
Contractor: Air Products and Chemicals, Inc.
Allentown, Pennsylvania & Air Products, PLC Hersham, England)
h) El Sewedy Administration Building (Ain El Shoknah): (from
March 2009 till March 2010) (Owner & Consultant: El Sewedy for
Cables)

Technical office engineer في Rowad for Modern Engineering (Algeria Branch)
  • الجزائر - الجزائر
  • يناير 2007 إلى أكتوبر 2009

-Algeria Metro Line (1) stage No.(1) :

1) Bach Djerah Maintaince Workshop: (January 2008- September
2009)
• Main Contractor t: Vinci Construction Grands Projects
• Consultant: SYSTRA.
• Project Cost: 2, 000, 000 Euro consists of two Buildings & two
Workshops.

2) El Anasser Service Buildings Project: (January 2007- January
2008)

• Main Contractor : Vinci Construction Grands Projects
• Consultant: SYSTRA.
•Project Cost: 4, 000, 000 Euro consists of three Buildings (Administration, Electric generators, Housing & Electric Cables Tunnel).

Project Manager في Rowad for Modern Engineering
  • مصر - القاهرة
  • أغسطس 2006 إلى ديسمبر 2006

Project : Renewing The Building of Club YMCA in EL Ghomehereyah street near (Ramsis square)

• Client : YMCA
• Consultant: Orascom Construction & industries (OCI).
• Project Cost: 1, 250, 000 L.E

Site & Technical office Engineer في Rowad for Modern Engineering
  • مصر - القاهرة
  • مارس 2006 إلى يوليو 2006

Project : Repairing the construction parts in Nile Hilton in Tahrir square beside the Egyptian museum

• Client : Misr for Hotels Company
• Consultant: Dr Adel Abd rahman for Consultants.
• Project Cost: 3, 500, 000 L.E
• Position : Site & Technical office Engineer

Site engineer في EL MOTAHADAAH Company
  • مصر - القاهرة
  • سبتمبر 2004 إلى فبراير 2006

Projects : Repairing Ancient Islamic Buildings

- Soliman Agha El Selehdar mosque.
- House of Quatbaay.
- House of Shabashery
- Mahmoud Mohram mosque.
- Castle of prince Taz.
- Mami El Sephi mosque.

• Client & Consultant: Ministry of culture.
• Project Cost : 21, 000, 000 L.E

site engineer في Rowad Modern Engineering Company
  • مصر - القاهرة
  • ديسمبر 2003 إلى أغسطس 2004

projects:

a) Ticket & Control Unit building & Reinforcement concrete fence
with several gate points around the Pyramids -Giza
b) Secret Agency Fence - Kobri El Khobbah.
c) Renewing the workshop, Reception, showrooms Giza national
Automotive for Mercedes (GNA)-Makkar

Assistant Engineer in Technical office for Military engineering projects في During Military services
  • مصر - القاهرة
  • مايو 2002 إلى نوفمبر 2003

• Making workshop drawing with AutoCAD.
• Responsible for quantity survey and material take off for
construction works.
• Making Bill of quantities (B.O.Q) & The Contracts with
subcontractors.
• Responsible for surveying works.
• Insure the job is done according to the technical
specifications.

الخلفية التعليمية

بكالوريوس, civil Engineering
  • في Helwan University
  • مايو 2002
الثانوية العامة أو ما يعادلها, engineering
  • في Saint fatima Language school
  • مايو 1997

Specialties & Skills

Project Management
SAP 2000
AUTOCAD
MICROSOFT OFFICE
Primavera planner & Microsoft Project

اللغات

العربية
متمرّس
الانجليزية
متمرّس
الفرنسية
مبتدئ

العضويات

Project Management Institute (PMI)
  • member
  • January 2010

التدريب و الشهادات

Preperation for PMP - Mena chapter (الشهادة)

الهوايات

  • swimming
  • Driving
  • Football