islam khalil, Senior Cost Engineer

islam khalil

Senior Cost Engineer

heisco

Lieu
Egypte - Alexandrie
Éducation
Master, Project management
Expérience
13 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 8 Mois

Senior Cost Engineer à heisco
  • Koweït - Al Ahmadi
  • mars 2016 à mars 2021

cost controlling

Planning and Cost Engineer à alkhodari
  • Arabie Saoudite - Dammam
  • mai 2014 à février 2016

•Prepare project Baseline Schedule.
•Assign Different Resources on the schedule and prepare histogram for Different Resources.
•Weekly Updating the Schedule.
•Montring the Project Schedule to clarify the project Delays for corrective action to be taken.
•Prepare Look Ahead Schedules
•Prepare Progress Site Report including( Photos, Videos).
•Prepare a list of the critical activities among the project.
•Prepare a recovery plan according to the site conditions.
•Prepare Time Claims.
•Creating and analyzing Project BOQ breakdown containing detailed resources quantities and production rates
•Creating and analyzing Project indirect costs breakdown containing detailed resources quantities and rates
•Montring the project using ORACLE-ERP application to collect the detailed actual cost.
•Allocating actual Costs on the related budget codes .
•Analyzing the actual cost performance to achieve the activities actual rate and cost variances.
•Estimate (EAC) for each budget code based on the performance of actual costs and the expected performance for each budget item.
•Create a Monthly Cost Report includes recommendations and corrective actions.
•Create a monthly Wastage Report for permanent materials.
•Prepare Project Cash flow includes cash out distribution based on the suppliers and subcontractors contracts and cash in distribution based on the project contact payment terms.
•Create Revised Budget based on scope deviations and approved change orders
•Create the financial studies for several variations orders according to the project contract.
•Leading project quantity surveyors to calculate the project tender drawings quantities and approved shop drawings quantities to a get full picture about the project scope.
•Building the necessary relationships with the project team and several departments as finance and tender and Procurement and planning to increase the quality of the cost reports.

Cost Control and Planning Engineer à Gama For Trade and Contracting Company
  • Egypte - Alexandrie
  • avril 2012 à avril 2014

Since April 2012
Gama For Trade and Contracting Company
Project: Kraft Foods Factory -Borgalarab-Alexandria
Solvay Shahrazad-Phase2

Job title: Cost Control and Planning Engineer
Job discription:
• Analyising Project budget
• Analysing each Activity in the project to achieve it's actual Cost to compare it with the planned breackdown
• Analysing All Site Expences and allocate it according to the planned budget
• Prepare A Monthly Cost Report includes Direct And indirect Cost
• Prepare Budget Deviation Report
• Prepare Cost Variation Orders
• Prepare Clinet Invoice
• Prepare acomparision between the Sub contractors' invoices and Client invoice among the quantities and rates
• Task number code for subcontractor's invoices, inventory Goods issuance order
• Prepare Material Waste Report
• Prepare Progress Site Report
• Prepare project Time Schedule
• Assign Different Resources on the schedule
• Weekly Updating the Schedule
• Montring the Project Schedule to clarify the project Delays
• Prepare a list of the critical activities among the project
• Prepare a recovery plan according to the site conditions
• Prepare Time Claims

Cost Control and Planning Engineer à PALM HILLS DEVELOPMENT
  • Egypte - Alexandrie
  • août 2010 à avril 2012

From August 2010 to April 2012
PALM HILLS DEVELOPMENT
Project: Hacienda Bay-zone1
Hacienda White-zone1

Job title: Cost Control and Planning Engineer

Job discription:
• Prepare cost control repots (comparision between Project Actual cost and Earned value)
• Determine the Usage percentages of materials.
• Preparing the B.O.Q and the sub contractors invoices.
• Preparing Cost breakdown for the Project.
• Submittals, procurements, Contracts.
• Prepare cost estimates
• Update and monitoring the project schedule
• Prepare progress reports
• Prepare project Time Schedule
• Prepare project monthly invoice
• Prepare purchase request (PR)
• Task number code for subcontractor's invoices, inventory Goods issuance order

Site manager à FLAME PRMOTIONS AND PROCUREMENT, ZAMBIA, LUSAKA
  • Zambie
  • juillet 2008 à juillet 2010

from July 2008 to July 2010
FLAME PRMOTIONS AND PROCUREMENT, ZAMBIA, LUSAKA

Job title: Site manager
Job discription: • Creates and executes project work plans and revises as appropriate to meet changing needs and requirements.
• Identifies resources needed and assigns individual responsibilities.
• Manages day-to-day operational aspects of a project and scope.
• Effectively applies and enforces project standards.
• Prepares for engagement reviews and quality assurance procedures.
• Ensures project documents are complete, current, and stored appropriately.
• Tracks and reports team hours and expenses on a weekly basis.
• Determines appropriate revenue recognition, ensures timely and accurate invoicing and monitors receivables for project.
• Holds regular status meetings with project team.

Former projects experience:
The Colisiem (offices area)
• It is conisits of 2 stories with total area 1500m2
• I was responsible on executing all the civil works, the architecture works and land scaping on the site


Diamonds of lusaka (five factories)
• It is consists of five factories each has a show area and ofices area and a storage area with total area 6000m2

• I was responsible on executing all the civil works, steel works, the architecture works and land scaping of the site

site engineer à TALAAT MOUSTAFA GROUP
  • Egypte - Le Caire
  • août 2007 à juillet 2008

From August 2007 to July 2008
TALAAT MOUSTAFA GROUP (alexandria for construction)

Project: Madinaty City
Job title: site engineer
Job discription: • charge of a group of 6 structures each was 6 stories with area 400 square meter.
• inspecting the daily movement of the civil works in the group that following the specifications and the time schedual.
• Receipt the civil works from the sub-contractors and deliver it to the consultants

Training Experience

Éducation

Master, Project management
  • à University Of Liverpool
  • décembre 2019
Diplôme, Management
  • à جامعة الاسكندرية-كلية الهندسة
  • juillet 2013

September 2010
Diploma of science in Construction Management from the department of Civil Engineering

Baccalauréat, Civil Engineering
  • à Alexandria University Faculty of Engineering
  • juillet 2007

July 2007 Bachelor of Science from the department of Civil Engineering Alexandria University Faculty of Engineering ( Good 67.4%) July 2007 Graduation project Contracts, Quantity surveying, specification and construction management Grade: Excellent 85%

Specialties & Skills

AutoCAD
Cost Control
Primavera P6
Microsoft Office
MS Project
AutoCad
Different Office processing
Microsoft Office
PRIMAVERA 7

Langues

Arabe
Expert
Anglais
Expert
Français
Débutant