Total Years of Experience: 13 Years, 2 Months
January 2021
To Present
Water Project Engineer
at Critical Engineering Company CEC
Location :
Saudi Arabia - Ras Al Khair
Water transmission pipeline, Sewer, water and sewage networks, Pump stations, lift stations, Wastwater-treatment plants
September 2019
To December 2020
Site Manager
at NWC
Location :
Saudi Arabia
July 2011
To December 2019
Senior Mechanical Water Engineer
I found this job using Bayt.com
at Gulf Water Construction Com
Location :
Saudi Arabia - Dammam
Engineer, implement and monitor water treatment/operations projects and identify optimal
design criteria for scaling projects to full-scale deployment across different regions.
Interface with internal engineering, operations, real estate and environmental health and
safety teams to develop and implement solutions in rural areas that often lack adequate
available water and wastewater infrastructure. Promote standards that maintain consistency
and reliability in services delivered.
pumpstations / lift stations / GLS Steel Tanks
design criteria for scaling projects to full-scale deployment across different regions.
Interface with internal engineering, operations, real estate and environmental health and
safety teams to develop and implement solutions in rural areas that often lack adequate
available water and wastewater infrastructure. Promote standards that maintain consistency
and reliability in services delivered.
pumpstations / lift stations / GLS Steel Tanks
April 2017
To August 2017
Piping Senior Engineer
at RITCO
Location :
Saudi Arabia
Factory for the production of 300, 000 tons of soda ash, which considered
the first kind in the Gulf region and the largest in the Middle East and North
Africa (MENA) region.
o Piping installation and hydrotest including water, waste water, Sanitary
water, Sea water cooling supply and return pipes and potable water.
o Up to 1200mm RTRP, FRP, HDPE pipes.
o Metering Skids construction.
o Water and lift stations construction.
Isam K. Kabbani Group of Companies http://www.ikk
the first kind in the Gulf region and the largest in the Middle East and North
Africa (MENA) region.
o Piping installation and hydrotest including water, waste water, Sanitary
water, Sea water cooling supply and return pipes and potable water.
o Up to 1200mm RTRP, FRP, HDPE pipes.
o Metering Skids construction.
o Water and lift stations construction.
Isam K. Kabbani Group of Companies http://www.ikk
January 2011
To July 2011
Maintenance Engineer
at BEHIRA WATER AND DRAINAGE CO
Location :
Egypt
water treatment plant. 240, 000 m3/day
Share on Facebook
Share on Twitter
Share Via Email