Production Foreman
Waha oil company
Total years of experience :21 years, 4 Months
Work Full Time 12 Hours Every Day.
WellTesting.
Water Cut.
A.P.IGravity.
Calculation.
Work With Team OrAlone.
Daily Reports.
Wearing Safety Equipment
Keep Watching On Separation Between Gas, Oil And Water.
Sharing The Wells On Vessels.
Solution The Process Problem.
Startup And Shutdown For Separators In Normal And Emergency Case
Called Maintenance In Problem Case
Flow Meter Reading.
Work On P.L.C . System.
Turn On Pumps And Off.
Send And Receive The Pig.
Revealing On Air Compressorand draining.
Sending Crude Oil To Tanks
Revealing On Chemical Pumps
Open And Close EmergencyShutdownValves (E.S.D.V).
SamplesforWell Head, Station, Well Test And Separators.
Wells Area.
Daily draining for Vessels and Tanks.
Water in jection.