Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
ismail Khalid, Senior Land Survey Engineer

ismail Khalid

Senior Land Survey Engineer·SASEC Engineering Consultant (Saudi)

Saudi Arabia

Diploma, Civil Engineer

Work experience

Total years of experience: 14 years, 9 months

Senior Land Survey Engineer

January 2023 - January 2025

SASEC Engineering Consultant (Saudi)

Abha, Saudi Arabia

January 2023 - January 2025

Project: (PMC) WTTCO (Abha Metropolitan Water Transmission System Phase 2, Parts B)

• Administered survey and construction activities for water transmission infrastructure, including tank
foundations, electrical buildings, cable ducts, and valve chambers.
• Implemented installation of major pipeline routes, including a 40-inch line over 37 km in Abha.
• Executed horizontal and vertical alignment checks for Tunnel Boring Machine (TBM) operations using
precise coordinates and leveling techniques.
• Directed survey and layout works for Two large tank foundations (30, 000 m³), main pump houses, VSD
and transformer buildings, electrical and security control buildings, distribution transformer foundations,
and related valve shafts.
• Conducted surveying and setting-out for walkable cable ducts, inlet, isolation, control, and flow meter
valve shafts, and outlet surge vessels.
• Performed detailed surveying of underground stormwater pipelines and manholes, ensuring compliance
with design specifications.
• Established coordinates and reference points for structural and utility elements based on design
drawings.

Company industry:
Construction & Building

Senior Land Survey Engineer

January 2021 - January 2023

/ Fichtner Engineering Consultant (Germany)

Khobar, Saudi Arabia

January 2021 - January 2023

Project: (Khobar to Dammam/Dhahran Water & Transmission Desalination plants)
• Conducted surveying and layout works for the installation of an 80-inch diameter pipeline extending 23
km from Khobar to Dammam (Jamiah) as part of the Water Transmission System Plant Project in Khobar,
ensuring accurate alignment and compliance with design specifications.
• Performed horizontal and vertical alignment checks for TBM Works operations with high-precision
measurement tools.
• Conducted precise horizontal and vertical alignment verifications for Tunnel Boring Machine (TBM)
operations using advanced leveling techniques and coordinates.
• Carried out topographic and as-built surveys for underground stormwater pipelines and manholes,
ensuring strict adherence to design specifications.
• Managed surveying and layout work for major infrastructure elements, including three 170, 000 m³ tank
foundations, the main pump house, VSD and transformer buildings, electrical and security control
buildings, and distribution transformer foundations.
• Coordinated setting-out activities for walkable cable ducts, valve shafts (inlet, isolation, control, and flow
meter), and outlet surge vessels to ensure precise installation and alignment with design drawings.
• Surveyed and verified underground stormwater pipelines and manholes, maintaining full compliance with
approved engineering designs and specifications.
• Supervised daily survey operations for roads, bridges, highways, and tunnels, ensuring all setting-out
works, benchmarks, and reference points were accurate and in line with approved project requirements.

Company industry:
Construction & Building

Senior Land Surveyor

October 2020 - January 2021

Saudi Architect Engineering Consultant (Saudi Arabia)

Riyadh, Saudi Arabia

October 2020 - January 2021

Project: Airport Aviation Project | Ministry of Defense (World Defense Air Show 2022)
Riyadh, MULHIM

 Verified runway grades, slopes, and elevations to ensure compliance with aviation design standards.
 Performed layout and staking for taxiway centerlines, edges, fillets, shoulders, and connecting taxiway routes.
 Established and marked coordinates for block boundaries, foundations, columns, slabs, manholes, and pipeline centers, supporting accurate and efficient site execution.
 Handled layout and surveying for underground stormwater pipelines and manholes, confirming correct slopes, levels, and positioning.
 Performed layout and staking for aircraft parking stands, service roads, equipment staging areas, and apron pavements.
 Performed precise layout and staking for airport car parking areas, including parking bays, access roads, drop-off/pick-up zones, curbs, medians, and pedestrian walkways.
 Performed as-built surveys and prepared reports for engineering review and regulatory approval.
 Supported construction teams during earthworks, grading, compaction, and paving, ensuring all work matched airport design specifications.

Company industry:
Construction & Building

Senior Land Surveyor

October 2018 - October 2020

Al Jaber Group (UAE)

Altaif, Saudi Arabia

October 2018 - October 2020

Project: Ministry of Housing (Sail AL Kabeer), Taif

• Supervised and performed surveying and layout activities for roads, concrete structures, asphalt layers,
and base courses, ensuring complete compliance with approved design drawings and project
specifications.
• Verified elevations and grading levels during cut and fill operations to maintain precise alignment and
design accuracy across all stages of construction.
• Conducted detailed measurements and setting-out for road centerlines, edges, and parking areas,
guaranteeing correct alignment, level, and surface quality.
• Positioned manholes and pipeline centers for proper installation and connectivity.
• Performed layout and setting-out works for box culverts, raft foundations, retaining walls, and steel
structures with a focus on precision and accuracy.
• Prepared, checked, and verified coordinates for structural and utility installations, ensuring alignment
with project specifications and maintaining high construction standards.
• Collaborated with consultants, engineers, and site teams to resolve design conflicts and technical issues
efficiently, minimizing delays and rework.
• Utilized CAD and GIS software for survey data processing, design verification, and preparation of project
documentation and as-built drawings.

Company industry:
Construction & Building

Land Surveyor

October 2017 - January 2018

Wadi Dafa Contracting Company (Saudi Arabia)

Riyadh, Saudi Arabia

October 2017 - January 2018

Project: Royal Commission for Riyadh | BRT project (Bus Rapid Transit)

 Oversaw construction of roads, concrete, asphalt, and base course works, ensuring strict compliance with design drawings and project specifications for structural and civil works.
 Positioned manholes and pipeline centers accurately for proper installation and connectivity.
 Managed the installation and surveying of underground stormwater pipelines and manholes to meet engineering standards.
 Performed surveying and layout of landscape and hardscape elements, ensuring accurate alignment with design plans and project specifications.

Company industry:
Construction & Building

Senior Land Survey Engineer

January 2015 - January 2017

Hyundai Heavy Engineering

Jizan, Saudi Arabia

January 2015 - January 2017

Project: JRTP (Jizan Aramco Refinery and Terminal Project) EPC 2

• Prepared detailed layouts for anchor bolt foundations, RTR pipes, stormwater drainage systems, and
manholes, verifying elevations according to approved drawings.
• Supervised main building structural and civil works to ensure quality, safety, and conformity with design
requirements.
• Reviewed, analyzed, and revised project drawings and construction shop drawings to resolve design
issues and improve accuracy.
• Validated layouts for the substation buildings blinding, foundations, columns, roof slabs, and other
structural elements.
• Laid out coordinates for air-conditioning ducts, firefighting points, and electrical panel points, ensuring
correct top and bottom elevations.

Company industry:
Oil & Gas

Senior Land Survey Engineer

January 2013 - January 2015

Hyundai Heavy Engineering

Al-Ahsa, Saudi Arabia

January 2013 - January 2015

Project: Al Hafuf Aramco Power Plant

• Engineered and supervised the construction of HRSG (Heat Recovery Steam Generator) foundations, GTG
(Gas Turbine Generator) foundations, pipe rack foundations, electrical and security buildings, warehouse
structures, emergency diesel generator foundations, gantry tower foundations, stormwater and
wastewater drainage pipelines, firefighting pipelines, wastewater sumps, and valve pit foundations,
ensuring compliance with approved design drawings and engineering standards.
• Verified and maintained all elevations to ensure alignment with approved drawings and project
specifications.
• Directed main building structural and civil works, ensuring quality control and adherence to design
requirements.
• Developed layouts for anchor bolt foundations, RTR pipes, stormwater drainage systems, and manholes,
confirming accurate elevations.
• Reviewed, analyzed, and revised project and construction shop drawings to resolve discrepancies and
enhance execution accuracy.
• Validated layouts for substation building, blinding, foundations, columns, roof slabs, and other structural
components.

Company industry:
Oil & Gas

Land Surveyor

October 2012 - January 2013

Sinopec E&C Middle East Co., Ltd.

Jeddah, Saudi Arabia

October 2012 - January 2013

Project: Flyover at SINAE Project Jeddah

• Collaborated with consulting staff on-site to coordinate inspections, monitor work progress, and ensure
compliance with project standards.
• Executed site preparation tasks, including layout, unit setting-out, and precise leveling for construction
activities.
• Oversaw construction operations in accordance with approved drawings and specifications, ensuring
high-quality workmanship across civil, electrical, and associated works.
• Designed and scheduled work execution programs in coordination with senior staff to align with the
master project schedule.
• Documented and reported work execution challenges and site issues to the Project Engineer for timely
resolution.
• Conducted topographical surveys for sewerage main lines, including urban area leveling and manhole
location marking for profile design.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture

Land Survey Inspector

October 2011 - October 2012

AL-ID Engineer Consultant

Jizan, Saudi Arabia

October 2011 - October 2012

Project: Jizan Tawal Ministry of Transport

• Collaborated with client teams on-site to stay aligned on project goals, resolve issues quickly, and keep
deliverables on track.
• Effectively supervised construction operations, ensuring adherence to design drawings and specifications
while maintaining exceptional workmanship quality.
• Supported the resident engineer and senior supervision staff in achieving project milestones.

Company industry:
General Engineering Consultancy

Land Surveyor

January 2009 - December 2011

Bahria Town Pvt Ltd

Islamabad, Pakistan

January 2009 - December 2011

Project: Minister of Housing, Rawat

• Responsible for surveying and setting out works related to roads, concrete structures, asphalt layers, and
base courses to ensure accurate alignment and construction quality.
• Checked and verified elevations during cut and fill operations to maintain proper grading and design
levels.
• Measured and laid out road centerlines, edges, and parking areas in accordance with project drawings
and specifications.
• Marked coordinates for block boundaries, foundations, columns, slabs, manholes, and pipe centers to
support construction accuracy.
• Set out coordinates for structural works and underground stormwater pipelines, ensuring precise
positioning and compliance with design requirements.

Company industry:
Construction & Building

Education

QMA Jinnah Instutite

December 2010

December 2010

Diploma, Civil Engineer

Pakistan

GPA (percentage): 90%

GPA (percentage): 90%

Civil Engineer | Land Surveying
View attachment

Skills

AutoCAD
Expert
AutoCAD
Expert
Autocad Civil 3D
Expert
Autocad Civil 3D
Expert
Site Inspection
Expert
Site Inspection
Expert
Ms office
Expert
Ms office
Expert
Surveying
Expert
Surveying
Expert
AVIATION
Intermediate
AVIATION
Intermediate
COMPLEX PROBLEM SOLVING
Intermediate
COMPLEX PROBLEM SOLVING
Intermediate
DRAWING
Intermediate
DRAWING
Intermediate
LEADERSHIP
Intermediate
LEADERSHIP
Intermediate
OPERATIONS
Intermediate
OPERATIONS
Intermediate
PROJECT COORDINATION
Intermediate
PROJECT COORDINATION
Intermediate
SURVEY MEASUREMENTS
Intermediate
SURVEY MEASUREMENTS
Intermediate
TECHNICAL DOCUMENTATION
Intermediate
TECHNICAL DOCUMENTATION
Intermediate
TIMELINES
Intermediate
TIMELINES
Intermediate

Social profiles

Languages

English

Expert

Arabic

Expert

Urdu

Expert

Memberships

saudi council of engineers

Land Surveyor

September 2025

Training and Certifications

Certifications
AutoCad, Civil 3D
Cascade College
Jun 2006 - Sep 2006
Driving License
AutoCad, Civil 3D
Cascade College
Jun 2006 - Sep 2006

Hobbies and interests

Cricket