عيسى معايعه, Construction Manager

عيسى معايعه

Construction Manager

UCC Holding

البلد
المملكة العربية السعودية - الرياض
التعليم
بكالوريوس, Civil Construction And Civil Engineering
الخبرات
10 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 9 أشهر

Construction Manager في UCC Holding
  • المملكة العربية السعودية - تبوك
  • أشغل هذه الوظيفة منذ مارس 2024

The Water Park Hotel will be a unqiue and exemplary hospitality development in the centre of the new Qiddiya Master plan to the West of Riyadh. The hotel will comprise of 400 keys and include a number of premium villas that will sit on top of a parking and BOH podium.
The design has been developed to be in keeping with the layered rock of the geological context and green planters to bring the feeling of nature into each room of the hotel.
The size of the project is 25, 000 sqm.
Project Cost: QR 2.2 Billion

Construction Manager في UCC Holding
  • المملكة العربية السعودية - تبوك
  • يناير 2023 إلى مارس 2024

Tabuk Entertainment Complex - (Saudi Entertainment Ventures (SEVEN) Client) - Saudi Arabia
Joint Venture between UCC and Al Bawani working the design consultant Dar
The entertainment complex sites in Tabuk and Yanbu will be spread over about 40, 000 square meters and 36, 000 square meters respectively.
PIF Budget for SEVEN: SAR 14 Billion,
I'm Responsible for all structure and finishing Work .

Construction Manager في UCC Holding
  • قطر - الدوحة
  • فبراير 2021 إلى يناير 2023

Family Integrated Housing project ( Barwa Client) - Qatar
The project was in Al Wakrah Qatar, With a total 330 Buildings, 156 Buildings fully precast modern Buildings G+4 and 174 Buildings with tunnel and conventional system, I was Responsible for More than 70 Buildings, handling the structure work and finishing work and managing all the sub-contractors and prepare the work and the back charge reports and hand over the building to third party FIFA World Cup and to the Client
Project Cost: QR 3 Billion

Construction Manager في Arabtec Holding
  • الإمارات العربية المتحدة - دبي
  • يونيو 2020 إلى فبراير 2021

Cherry woods 378 villas Project ( MERAAS Client ). The project was 378 villas and townhouses, fully precast modern villas G+1 with boundary wall, I was responsible for all precast works ( villas Installation, Boundary walls, Manholes works, water tanks ), the Clint is MERAAS *contract value: AED 52 million .
Communicated daily with vendors to keep project fully operational.
Verified completed projects met approved time, quality, and cost estimates.
Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
Monitored subcontractor operations and applied effective time, resource, and money management strategies to deliver under-budget project completion.

Senior Project Engineer في Arabtec Construction
  • الإمارات العربية المتحدة - دبي
  • أغسطس 2019 إلى يونيو 2020

478 villas Akoya Oxygen Project ( DAMAC Properties Client ).
The project was 478 Villas townhouses fully precast modern villas G+1 with boundary wall, I was responsible for the Substructure and superstructure with concrete casting and precast works ( villas Installation, Boundary walls, Manholes works) and All Works related to finishing activates. Project Cost: AED 560 million
Assessed scope and requirements to assist with project design determinations.
Adhered to timelines to meet quality assurance targets.
Calculated risks during project development and managed risks throughout projects.

Project Engineer في Arabtec Construction
  • الإمارات العربية المتحدة - دبي
  • ديسمبر 2018 إلى أغسطس 2019

The manufacturing of prefabricated pods, Bathrooms, kitchens, and buildings i was responsible for the development of a method statement for the particular work on the factory and check if the works are moving as per the drawing, as per material approved, as per method statement and as per quality control procedure. And the safety of people carrying out the works and making MEP and Civil works inspected and making sure that the job to be inspected is completed so that there will be no revisions or rejection of the finished pod, the manufacturing of prefabricated pods, houses, buildings, overseeing all quality control procedures throughout the full production process Including all inspections and all testing.

Civil Project Engineer في Arabtec Construction
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2017 إلى ديسمبر 2018

1, 017 Residential Villas West Yas (AL-DAR Client ), The project was the Construction of 1017 Villas, I was responsible for the substructure, superstructure ( tunnel and conventional system ) and concrete casting and precast work, external work ( Boundary walls, Manholes works, pavement work ) also i was responsible for all finishing works ( Block works, Plaster Works, Tile work, paint work) and Handed over the Villas to the Client and ADM .
Project Cost: AED 2.2 Billion .

Senior Site Engineer في Arabtec Construction
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2016 إلى يناير 2017

411 villas in West Bani Yas (Ministry of Presidential Affairs).
The project was 411 Villas distributed in three Areas * Construction Cost: AED 423 Million i was responsible to :
-Dealing with customers and the Ministry of Presidential Affairs (MOPA) and Abu Dhabi Municipality ( ADM ) and Engineering Company (EC)
Finish all the snags and de-snags Works. Coordinating with all supplier

Senior Site Engineer في Arabtec Construction
  • الإمارات العربية المتحدة - دبي
  • مارس 2015 إلى مايو 2016

Nimr Automotive Facility) Military Project .
The project is a factory of steel structure, with five ancillary buildings and a Mosque with a total area of 40, 000 m2. I was responsible of the structure and finishing activities and Road works and infrastructure.
Project Cost: $145.4 Million
Oversaw quality control and health and safety matters for construction teams.
Recorded daily events and activities in the site diary to evaluate processes and improve productivity.
Ordered and tracked the delivery of construction materials and supplies from vendors.
Applied engineering principles to troubleshooting and followed up on defined corrective actions to prevent re-occurrences.

Civil Site Engineer في Arabtec Construction
  • الإمارات العربية المتحدة - دبي
  • أكتوبر 2014 إلى مارس 2015

Tiara Palm Dubai Hotel and Tiara Residences with Wassel and Zabel Client
Seven Star Hotel consists of two Towers with 14 floors in each.
Project Cost : AED1.5 Billion.
Conducted research to test and analyze the feasibility, design, operation, and performance of equipment, components, and systems.
Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.

Civil Site Engineer في Building preparation company,
  • الأردن - اربد
  • يوليو 2011 إلى يوليو 2012

Managed construction contracts for capital projects to outline objectives, stakeholder responsibilities and modification procedures. Collaborated with civil technicians to gather project equipment and update maps, drawings, and blueprints.

الخلفية التعليمية

بكالوريوس, Civil Construction And Civil Engineering
  • في Philadelphia University - Jordan
  • يونيو 2014

Civil Engineering

الثانوية العامة أو ما يعادلها, Tawjihi Scientific
  • في LATIN PATRIARCHATE SECONDARY SCHOOL HOUSON
  • يناير 2009

Tawjihi Scientific

التدريب و الشهادات

AutoCAD 2D - Jordanian Engineers Association (JEA) (الشهادة)
تاريخ الدورة:
February 2012
Etabs - Jordanian Engineers Association (JEA) (الشهادة)
تاريخ الدورة:
December 2013
Primavera - Jordanian Engineers Association (JEA) (الشهادة)
تاريخ الدورة:
January 2014