Secondary Design Engineer
SCADA INNOVATIONS
Total years of experience :8 years, 7 Months
Duties:
- Preparation of design documents, review Base Design Schematics of Protection Panels.
‐ Prepare and review Detail Design Schematics of Protection Panels.
‐ Discussions with clients, obtaining approval for submitted drawings, etc.
‐ Coordinate with other projects to make Interface between Panels.
‐ Review of Technical Offers.
‐ Design of main/operational Single Line Diagrams.
‐ Design of AC SLD, and LV Breaker Sizing Calculations.
‐ Design of DC SLD, and LV Breaker Sizing Calculations.
- Protection & interlocking Logic Diagrams.
- Prepare Cable Schedules and termination charts.
Main Project:
RAS GHAREB-S4 (500/220kV)
NAGA HAMADI SS (500/220/66/11kV).
EAST SOHAG SS (500/220/66/22kV).
EL BASATEEN-3 SS ( 66/11kV).
-Design schematics drawings for 500kV Protection and Control.
-Design schematics drawings for 220kV Protection and Control.
-Design schematics drawings for 66kV Protection and Control.
COALANGEEL S/S 66/11KV (Smart Solution).
- Selection of suitable materials for Design.
- Prepare and review Detail Design Schematics of AC/DC.
EXTENSION OF ASSIUT AL-WALIDYA 220kV POWER STATION.
- Design of AC/DC SLD, LV Breaker Sizing Calculations, and Cable Sizing.
- Selection of suitable Materials for Design.
- Prepare and review Detail Design Schematics of AC/DC
POSITION: QA/QC
Duties:
- Reviewing shop drawings and co-ordination with tech. office and erectors and proposing
alternative solution wherever is necessary for a state of art erection works.
- Testing and inspecting of L.V& MV Switchgears.
- Testing and inspecting of Cables (continuity test & megger test).
- Testing and inspecting for power transformers and distribution transformers.
- Inspection for cable trays and cable busways.
- Assuring that termination of cables is matching with design drawings.
- Testing & inspecting for fire alarm and HVAC systems (Electrically wise).
- Testing & inspecting for (lighting, grounding& lightning) systems.
- Assuring that installation works matching with Standard and design drawings.
- Preparing Inspection Requests (IR).
- Preparing punch lists for the inspected systems of the site installation works.
- Preparing Non - Conformance Reports (NCR) and send it to subcontractors.
- Preparing QC Activity Status and send it to the client.
- Reporting to QC/QA Manager. & Project Manager
- Follow up site meeting with project manager.
- Attend meetings related to project with project manager.
- Arrange with other parties “subcontractors” for site work.
- Supervision of installation.
- Technical coordination.
- Preparation of requirement of project and bill of quantities.
- Technical evaluation of bidders’ offers.
- Preparation of purchase orders.
- Review of shop drawings and preparation of as built for any change in shop drawings.
- Maintenance and installation the low voltage and control panels .
- Programmer and maintenance for GEN SET.
- Design the layout for panels by Auto cad.
BSc. Of Engineering on June 2013. Section: Electrical Machines and power Engineering. Grade: good. High School: Galal Fahme Industrial Institute.