OWNER
ISSAM DAGHER MECHANICAL ENGINEERING
Total years of experience :32 years, 4 Months
ALL HVAC.
150 VILLAS PROJECT FOR THE MINISTRY OF INTERIER IN ABU DHABI.(ALL MEP WORKS)HVAC+ ALL INFRASTRUCTURE COORDINATE WORK I ATTENDED ALL TECHNICAL AND COORDINATE MEETING WITH THE MAIN CONTRACTOR AND THE CONSULTANT+MAKING SHOP DRAWINGS AND GET THE APPROVAL FROM CONSULTANT AFTER THAT SUPERVISE THE SITE FOR THE INSTALLATION OF ALL HVAC, INFRASTRUCTURE, WATER PUMPS, WORKS
REGARDS
ENGR ISSAM DAGHER
REDESIGNE HVAC, PLUMBINGS DRAWINGS FOR SOME TOWERS(30 STORY BUILDINGS)MADE ETS ROOM SHOP DRAWINGS AND GET THE APPROVALS FROM THE DEVELOPER (UDC)AND QATAR COOL FOR THE ETS ROOMS FOR ALL TOWERS MAKE THE HVAC DESIGN, SHOP AND AS BUILT DRAWINGS FOR ALL FLOORS ON BY ONE THE MAKE THE RISERS DESIGN AND SHOP DRAWINGS AND GET THE APPROVALS FOR ALL DRAWINGS, ATTEND ALL COORDINATE AND TECHNICAL MEETINGS WITH THE MAIL CONTRACTOR ACC AND THE DEVELOPER UDC, SUPERVISE THE SITES FOR ALL INSTALLATIONS, HVAC, WATER, DRAINAGE, FIREFIGHTING, VENTILATION.INFRASTRUCTURE
MEP OPERATIONS MANAGER.
CHECK THE DESIGNE DRAWINGS FROM THE SUB CONSULTANTS, AND SUPERVISE ALL SITES AND MAKE INSPECTIONS UNTIILL THE COMMITIONING AND DELEVERING TO THE CLIENTS
CENTRAL HVAC, WALKING COOLERS INSTALLATIONS+MAINTINENCE.
MAKE ALL TYPES OF MAINTINENCE FOR APPLE BEES RESTAURENT+MILLES RESTAURENTS=BAKERS SQUARES RESTAURENT +MC DONALDS RESTAURENTS IN LOS ANGELOS AND HVAC INSTALLATIONS FOR SOME VILLAS IN BEVERLLY HILLS.
MAKE PRECOMMITIONING WORKS FOR ALL THE NEW EQUIPMENTS, MAKE OFFICIAL RUNING TEST MESURE THE TEMPERATUE AND THE VIBRATIONS, RPM FOR PUMPS AND MOTORS AND DELEVER IT TO THE CUSTOMER.
MAKE PRECOMMITIONING WORKS FOR ALL THE NEW EQUIPMENTS, MAKE OFFICIAL RUNING TEST MESURE THE TEMPERATUE AND THE VIBRATIONS, RPM FOR PUMPS AND MOTORS AND DELEVER IT TO THE CUSTOMER
CENTRAL HEATING DESIGNE AND INSTALLATION.