Issaoui Mustapha, Senior Projects Manager

Issaoui Mustapha

Senior Projects Manager

Solar Energy

Location
Saudi Arabia - Riyadh
Education
Master's degree, Power Engineering /Renewable energy Green Energy
Experience
32 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :32 years, 3 Months

Senior Projects Manager at Solar Energy
  • My current job since November 2013

(Photovoltaic, thermal solar power and CSP Solar energy):
Design, Implementation, Testing/commissionning and maintenance.

Senior Projects Manager at Al-Jazirah Engineers & Consultants
  • Pakistan
  • October 2011 to October 2013

Power Generation & Electromechanical Projects, technical design and erections
managements: Jubail Commercial Port Power Plant - Jazan Port Power Plant -
Ras El-kheer Power Plant - Yanbu airport Tower

Project Manager at Saudi Electricity Company
  • Armenia
  • April 2010 to September 2011

Power Generation Projects and planning Dept. ( Ryiadh HQ ):
Senior Generation

Manager at Saudi Electricity Company SEC South
  • August 1997 to April 2010

SEC Abha - Projects Dept:
 Najran Oil fired Power Plant (400 MW) Project 
 Jazan Power Plant Extension( unit 11 &12 - 60 MW GTG ) 
 Tihama Power Plant 1200 MW
 Sharourah PS Extension Project: Gas Turbines 50MW 
 Jazan, Tihama and Sharourah EPMS project based on
IBM Lotus Notes with SOBIS Company.
 Najran CPS 400 MW oil fired 
 Sharourah PS 80 MW
 Najran-East Substation-132/13.8 Kv: Erection, Commissioning and testing 
 Al-Khaldia Substation-132/13.8 Kv: Erection, Commissioning and testing 
 Abha-Ouest 380/132Kv Substation: Erection, Commissioning and testing 
 Riyadh Al-Rabwa 132/13.8 Kv S/S# 8169, Commissioning and testing 
b- Y2k Compliance committee coordinator: 
SEC South passed the Y2K critical dates without any shut machine due to the bug.
4/21
c- Transmission and distribution Dept.: 
 Follow up of GPS applications requirement Project with SBM Company.
 Non-Electrified village projects data treatment. Design of VB-Based
Software to deal with this database. 
 Distribution transformers data treatment 
Design of VB-Based Software to deal with this database
using Maintenance information and Plans..
 GPS project follow. Technician Trainings. Design of
VB-Based Software to introduce the new GPS technology and required equipments.
 Procurement, installation and running of the Network
Simulation Software CYMDIST /CYMTCC to be used in Power
Distribution Field of Work - Network & S/S ( http://www.cyme.com )
Training and follow up of related Distribution Technicians
d- Materials & Contracting Department:
Bidding Packages and Contracts for materials and Equipment procurement and
installation (In relation with Company activities: Power Generation,
Transmission Distribution and services)
My Section was: Contracts for Power Generation & transmission
Projects e- Quality Improvement Team:
Proposed project: The Electronic Fax

Project Engineer at CHU and medical Centers Madinah
  • Saudi Arabia
  • January 1989 to November 1991
Project Engineer at Tunisian Electricity and Gas Company
  • Tunisia
  • June 1986 to June 1988
Mechanics at Tunisian Military Academy
  • October 1984 to February 1985
Maintenance Engineer at Bonna Pipes Co ( French Piping Co ) TUNISIAN BONNA AGENCY
  • August 1984 to February 1985

Generators and Electrical activities (Projects and
company installations)
______________________________________________________________________________
5/21
______________________________________________________________________________
7 )TRAINING PERIODS:
7-1 )Training During university period:
1
st
period: Tunisian Transport Company: 1982, Mechanic maintenance 2
nd
period: Tunisian Engineering High School: 1983, Power Electronics 3
rd
period: Tunisian Naval Construction Co.: 1984, Naval Mechanics
7-2)Training During professional activities:
1
st
period: 1986: Electrical control and remote
Gas Production plant El Borma Tunisia.
2
nd
period: 1987: Production management
Bizerte Petroleum Refinery - Bizerte - Tunisia
3
rd
period: 1992: Electrical distribution network maintenance
Khledia training center - Tunisia
4
th
period: 1994: Engines and Turbines Lube Oil
Shell Co. French Agency
5
th
period: 1998: GE Excitation System: GE-EX2000 EXCITOR
GE/MEELSA - GE Agency in Saudi Arabia
6
th
period: 1999: Alfa Laval Lube Oil separator
To eliminate solid and dissolved extra components from engines
and turbines used lube oil.
Note: Periods less than two weeks are not included above.
___________________________________________________________________________
8 )RESEARCH AND STUDIES, made for the training
center of STEG ( Tunisian Electric and Gas Co ):
1. Safety regulations and clauses: for the LPG production plant - Gabes
Tunisia Approved and Printed on 1987
2. Fire And Spark sources use in fuel tank areas and dangerous zones:
printed and distributed on 1987
3. Rescue and First Help Techniques: printed and distributed on 1988
4. Fire Extinguishers, types and use methods: printed and dist. on 1988
5. Fire fighting water network design method: printed and dist. on 1988
6. Gas And Dangerous Chemical products, Presence in work ambiance:
printed and distributed on 1992
7. Radioactive products presence in electrical and gas ambiance activities:
printed and distributed on 1993

Education

Master's degree, Power Engineering /Renewable energy Green Energy
  • at Tunisian National Engineering High School
  • September 1984

Techniques Numeriques et traitement de signaux

Specialties & Skills

Power Generation
Commissioning
Turbines
Installation
ASSETS RECOVERY
ELECTRONICS
MECHANICAL
NETWORK ENGINEERING
NETWORKING
OIL PAINTING
PRODUCTION MANAGEMENT
RESEARCH

Social Profiles

Personal Website
Personal Website

URL removed due to policy violation. Please contact support for further information.

Languages

Arabic
Expert
English
Expert
French
Expert
Italian
Expert