Freelancer / Looking for new job
Home
Total years of experience :11 years, 11 Months
Avoid non productive time, by ensuring - ( in co-ordination with the Drilling Team Leader, Operations Manager & Services Companies Headstaff ) - that all personnel, equipment and materials needed to carry out the planned operations, are available onboard the rig in due time
Working with HT, High T&D ( Torque and Drag ) in very long horizontal wells, till to 3000 m and in overballance drilling, in underbalance with air drilling same and hole water producing zones
Supervise vertical, directional and horizontal drilling of MD 3600-6200 m and TVD around 2700 m depth wells
Continually monitor the effectiveness of the ongoing operational process, and report on same to the Drilling/Workover Well Operations Team Leader, make recommendations for improvements to the programmer, activity and HSEQ. Working in a high level of H2S environment, till to 35%
Ensuring the safety of all aboard, and analyzing and reporting on the performance of the rig, in terms of HSE
Send rig move notification, complete Rig Move report
Check construction location, mark up site, cellar installing, conductor pipe, water wells drilled
Daily reporting rig activity on EDM - Engineering Data Model by Halliburton
Design casing tally, calculate cementing jobs, follow well costs. Order casing, cement, bits, water and chemicals
Work over programs : Abandon of the Well, Cement and Retainer Plugs, Phase-out in productive layers, Squeeze Cement, Drilling out the Plugs, Side Tracking, Washing Out in the Casing Hole and Open Hole, Well Head Test & Chrismass Three, Killing the Well, Single and Dual Completion & Packers, Completion of the well and gas injection, Fishing, Slick Line, Logging, Wire Line, Perforation and Cutting Casing or Tubing, Milling Packers and tubulars, etc.
Working with a total budget exceeding 25 Million USD
Faculty of Wells Drilling and Oil & Gas Pools Exploitation