Desuperheater calculations using HYSYS
Relief valve calculations
Control valve calculations and report
Pump calculation and their report
Modifying and reviewing the P&
Upgrade Sulfur Handling and Export Facilities (BGP
I did the staffing plan and distribute the hours between me and the CADD operators.
I checked the other discipline documents' such as piping.
HCU Reactor Thermocouple Upgrade Project - SASREF
in the utility unit that feeds to the other units in the refinery such as (cooling sea water, raw water, drinking water, nitrogen, plant air and instrument air).
Mass balance for the above utility
Updating the reports from CFAP after removing Paraxylene unit and BT (Benzene and Toluene) unit.
Worked on hydraulic calculations to find out the line sizes, velocity, pressure drop, and, etc.….
Replace Pressure Vessels - South Ghawar (Jan 2014-March 2014)
Developing vessel data sheets for the existing ones with additional some nozzles.
Upgrade Cooling Tower E-101- Abqaiq. (Dec 2013-Jan-2014)
Hydraulics calculations.
Closed Drain System Project (CDS) - Abqiq (March 2013-August 2013)
Relief valve sizing.
Hydraulics using Pipephase software 9.5.
Modifying P&
Control valve sizing.
Update the safeguarding narrative document.
Modifying and reviewing the P&
in the