جحر إسلام, Drainage Engineer (Public Works Authority-Secondment Staff)

جحر إسلام

Drainage Engineer (Public Works Authority-Secondment Staff)

WSP International

البلد
قطر - الدوحة
التعليم
بكالوريوس, Civil Engineering
الخبرات
15 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 9 أشهر

Drainage Engineer (Public Works Authority-Secondment Staff) في WSP International
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ سبتمبر 2019

 Review and accept the preventive maintenance plan and activity as well as corrective maintenance work of storm water & foul sewer network.
 Evaluate the reports of assessment/ inspection activities of all the assets of SGW & FSN network provided by the CZF contractor.
 Conduct weekly progress meeting with the contractor and reviewed their submittals not limited to daily, weekly, monthly reports and weekly look ahead plan as well as recovery plan.
 Review the snags list, all the approvals and as-built drawings submitted by the consultant & contractor prior to attend final taking over inspection.
 Perform the scheduled inspections & prepare snags list prior to issue completion certificate.
 Keep updated and maintained the handover database to the date.
 Perform scheduled inspections (customer complaints) and deliver on time accurate reports/documents/ information within assigned job.
 Review the flood mitigation plan and visited the project to assure all the measures are in place and instruct the contractor to add more if required.
 Inspection of preventing & corrective maintenance activities and submit reports.
 Ensure full implementation, monitoring and checking of all Drainage and road works as per approved drawings, method statement, and Inspection and Test plan interfaced to the ASHGHAL requirements in SRRR-Framework projects.
 Liaise with the project manager for the effective implementation of the quality management systems and site supervision activities.
 Check the delivered materials on site as per approved materials submittal, project specification, local and international standards. Witness materials test, check laboratory test report and keep on file for record.
 Prepares inspection checklist & monitor daily activities including Excavation, de-watering, Formation level, Pipe laying and Surrounding, Back filling, Manhole construction and Asphalt works (phase-1 & phase-2), site diary and test performed.
 Observe site safety procedures and report discrepancies, concerns and violations to project manager.
 Preparation and implementation of weekly and monthly work plan in coordination with construction team (Contractor).
 Conduct Quality awareness meeting with construction team (Contractor) and attend in weekly progress meeting to discuss relevant technical issues arose on actual site works.
 Identify non-conforming work or materials, notify contractor and keep a record. Follow up corrective and preventive measure taken by the Contractor.
 Review the design of proposed drainage system and prepare alternate proposals for proposed changes and preparing Site Instruction as directed by the manager.
 Preparation of cost evaluations of proposed site instructions or changes proposed by contractor and evaluate of Contractor’s claims.
 At the end of project, check all the As-built drawings to valuation the project according to B.O.Q., then submit to project manager for the purpose of final payment and prepare snags list on the completed works.
 Evaluate technical documents and financial submittal that submitted by the tenderer and then prepared technical and commercial evaluation report.
 Check as-built drawings, joint measurement and visit the site of completed job relating to shop drawing and revised shop drawing drawing (if issued).
 Assess the completed job according to B.O.Q. & then submit to concern Engineer for interim payment.
 Comprehensive review and recommendation of contractor’s interim payment to ensure the compliance with Ashghal requirements.
 Preparation cost plan/estimates at various stage of a project.
 Apply road-opening permit for the contractor to get approval from different authorities to execute the work.

Drainage Supervisor (Public Works Authority-Secondment Staff) في Salfo & Associates. S.A.
  • قطر - الدوحة
  • مايو 2018 إلى أغسطس 2019

 Review and accept the preventive maintenance plan and activity as well as corrective maintenance work of storm water & foul sewer network.
 Evaluate the reports of assessment/ inspection activities of all the assets of SGW & FSN network provided by the CZF contractor.
 Conduct weekly progress meeting with the contractor and reviewed their submittals not limited to daily, weekly, monthly reports and weekly look ahead plan as well as recovery plan.
 Review the snags list, all the approvals and as-built drawings submitted by the consultant & contractor prior to attend final taking over inspection.
 Perform the scheduled inspections & prepare snags list prior to issue completion certificate.
 Keep updated and maintained the handover database to the date.
 Perform scheduled inspections (customer complaints) and deliver on time accurate reports/documents/ information within assigned job.
 Review the flood mitigation plan and visited the project to assure all the measures are in place and instruct the contractor to add more if required.
 Inspection of preventing & corrective maintenance activities and submit reports.
 Ensure full implementation, monitoring and checking of all Drainage and road works as per approved drawings, method statement, and Inspection and Test plan interfaced to the ASHGHAL requirements in SRRR-Framework projects.
 Liaise with the project manager for the effective implementation of the quality management systems and site supervision activities.
 Check the delivered materials on site as per approved materials submittal, project specification, local and international standards. Witness materials test, check laboratory test report and keep on file for record.
 Prepares inspection checklist & monitor daily activities including Excavation, de-watering, Formation level, Pipe laying and Surrounding, Back filling, Manhole construction and Asphalt works (phase-1 & phase-2), site diary and test performed.
 Observe site safety procedures and report discrepancies, concerns and violations to project manager.
 Preparation and implementation of weekly and monthly work plan in coordination with construction team (Contractor).
 Conduct Quality awareness meeting with construction team (Contractor) and attend in weekly progress meeting to discuss relevant technical issues arose on actual site works.
 Identify non-conforming work or materials, notify contractor and keep a record. Follow up corrective and preventive measure taken by the Contractor.
 Review the design of proposed drainage system and prepare alternate proposals for proposed changes and preparing Site Instruction as directed by the manager.
 Preparation of cost evaluations of proposed site instructions or changes proposed by contractor and evaluate of Contractor’s claims.
 At the end of project, check all the As-built drawings to valuation the project according to B.O.Q., then submit to project manager for the purpose of final payment and prepare snags list on the completed works.
 Evaluate technical documents and financial submittal that submitted by the tenderer and then prepared technical and commercial evaluation report.
 Check as-built drawings, joint measurement and visit the site of completed job relating to shop drawing and revised shop drawing drawing (if issued).
 Assess the completed job according to B.O.Q. & then submit to concern Engineer for interim payment.
 Comprehensive review and recommendation of contractor’s interim payment to ensure the compliance with Ashghal requirements.
 Preparation cost plan/estimates at various stage of a project.
 Apply road-opening permit for the contractor to get approval from different authorities to execute the work.

Civil Inspector/ Quantity Surveyor (Secondment Staff at PWA) في Tobah General Contracting (EDGE Water Technical Services)
  • قطر - الدوحة
  • مايو 2014 إلى مايو 2018

 Review and accept the preventive maintenance plan and activity as well as corrective maintenance work of storm water & foul sewer network.
 Evaluate the reports of assessment/ inspection activities of all the assets of SGW & FSN network provided by the CZF contractor.
 Conduct weekly progress meeting with the contractor and reviewed their submittals not limited to daily, weekly, monthly reports and weekly look ahead plan as well as recovery plan.
 Review the snags list, all the approvals and as-built drawings submitted by the consultant & contractor prior to attend final taking over inspection.
 Perform the scheduled inspections & prepare snags list prior to issue completion certificate.
 Keep updated and maintained the handover database to the date.
 Perform scheduled inspections (customer complaints) and deliver on time accurate reports/documents/ information within assigned job.
 Review the flood mitigation plan and visited the project to assure all the measures are in place and instruct the contractor to add more if required.
 Inspection of preventing & corrective maintenance activities and submit reports.
 Ensure full implementation, monitoring and checking of all Drainage and road works as per approved drawings, method statement, and Inspection and Test plan interfaced to the ASHGHAL requirements in SRRR-Framework projects.
 Liaise with the project manager for the effective implementation of the quality management systems and site supervision activities.
 Check the delivered materials on site as per approved materials submittal, project specification, local and international standards. Witness materials test, check laboratory test report and keep on file for record.
 Prepares inspection checklist & monitor daily activities including Excavation, de-watering, Formation level, Pipe laying and Surrounding, Back filling, Manhole construction and Asphalt works (phase-1 & phase-2), site diary and test performed.
 Observe site safety procedures and report discrepancies, concerns and violations to project manager.
 Preparation and implementation of weekly and monthly work plan in coordination with construction team (Contractor).
 Conduct Quality awareness meeting with construction team (Contractor) and attend in weekly progress meeting to discuss relevant technical issues arose on actual site works.
 Identify non-conforming work or materials, notify contractor and keep a record. Follow up corrective and preventive measure taken by the Contractor.
 Review the design of proposed drainage system and prepare alternate proposals for proposed changes and preparing Site Instruction as directed by the manager.
 Preparation of cost evaluations of proposed site instructions or changes proposed by contractor and evaluate of Contractor’s claims.
 At the end of project, check all the As-built drawings to valuation the project according to B.O.Q., then submit to project manager for the purpose of final payment and prepare snags list on the completed works.
 Evaluate technical documents and financial submittal that submitted by the tenderer and then prepared technical and commercial evaluation report.
 Check as-built drawings, joint measurement and visit the site of completed job relating to shop drawing and revised shop drawing drawing (if issued).
 Assess the completed job according to B.O.Q. & then submit to concern Engineer for interim payment.
 Comprehensive review and recommendation of contractor’s interim payment to ensure the compliance with Ashghal requirements.
 Preparation cost plan/estimates at various stage of a project.
 Apply road-opening permit for the contractor to get approval from different authorities to execute the work.

Site Engineer في Kubota-Marubeni JV
  • بنجلاديش
  • سبتمبر 2013 إلى أبريل 2014

 Review drawings, procedures and specifications and Ensure full implementation, monitoring and checking of all works as per approved & latest revisions interfaced to the clients/consultant’s requirements.
 Manage & coordinate construction activities and maintenance operation in the project site to ensure conformance to the design codes & specifications.
 Prepare budgetary estimate & B.O.Q. and project documentation during design development stage to the construction phase of the project and material request as well as coordinates delivery to the project.
 Preparing daily working plan and regular progress report and comparing the progress of the work with the schedule of the project and ensuring projects run smoothly & completed within budget & on time.
 Scheduling materials and equipment purchases and coordinates delivery to the project.
 Marking pipe-jacking centerline and setting out for departure and arrival shaft and excavate departure and arrival shaft prior to check service line to divert outside the shaft.
 Sheet pile, linear plate driving at departure and arrival shaft prior to start excavation and then place strut at the designed depth at departure and arrival shaft.
 Making thrust wall at departure shaft and setting thrust platform to support upper loads safely.
 Setting out H-beam for guide rail and check sleeper spacer block, jack stand, hydraulic jack and other equipment, which used in pipe jacking.
 Setting of cutting edge and jacking pipe and check the soil condition behind sheet pile and then start cutting of departure face opening.
 Check the arrangement of grouting equipment, mixing proportion, ratio Grouting speed, pressure, depends on soil start primary grouting, and then continue if necessary.
 After completion jacking DIP insert casing pipe and completed along with fittings and check with hydraulic pressure test. Finally completed with cement grouting between the main DIP and casing pipe.
 After all, completed reinstatement work according to Roads and Highway, Chittagong City Corporation and Chittagong development authority specifications.
 Monitoring and pro-actively identifying site technical & construction issues and close out of corrective & preventive actions
 Ensure efficient work methodologies in compliance with safety, quality & productivity for successful completion.
 In the resolution of disputes and negotiation of change orders during construction assist project manager.
 Providing guidance and assistance to all site staff with respect to any aspect of the management system applied to their area of assigned responsibility.
 Mange all phases of projects including; execution, progress meetings, change orders, payment request and quality control.

Project Engineer في Amra Prokousholi Construction
  • بنجلاديش
  • مارس 2013 إلى سبتمبر 2013

 Review drawings, procedures and specifications and Ensure full implementation, monitoring and checking of all works as per approved & latest revisions interfaced to the clients/consultant’s requirements.
 Manage & coordinate construction activities and maintenance operation in the project site to ensure conformance to the design codes & specifications.
 Prepare budgetary estimate & B.O.Q. and project documentation during design development stage to the construction phase of the project and material request as well as coordinates delivery to the project.
 Preparing daily working plan and regular progress report and comparing the progress of the work with the schedule of the project and ensuring projects run smoothly & completed within budget & on time.
 Scheduling materials and equipment purchases and coordinates delivery to the project.
 Marking pipe-jacking centerline and setting out for departure and arrival shaft and excavate departure and arrival shaft prior to check service line to divert outside the shaft.
 Sheet pile, linear plate driving at departure and arrival shaft prior to start excavation and then place strut at the designed depth at departure and arrival shaft.
 Making thrust wall at departure shaft and setting thrust platform to support upper loads safely.
 Setting out H-beam for guide rail and check sleeper spacer block, jack stand, hydraulic jack and other equipment, which used in pipe jacking.
 Setting of cutting edge and jacking pipe and check the soil condition behind sheet pile and then start cutting of departure face opening.
 Check the arrangement of grouting equipment, mixing proportion, ratio Grouting speed, pressure, depends on soil start primary grouting, and then continue if necessary.
 After completion jacking DIP insert casing pipe and completed along with fittings and check with hydraulic pressure test. Finally completed with cement grouting between the main DIP and casing pipe.
 After all, completed reinstatement work according to Roads and Highway, Chittagong City Corporation and Chittagong development authority specifications.
 Monitoring and pro-actively identifying site technical & construction issues and close out of corrective & preventive actions
 Ensure efficient work methodologies in compliance with safety, quality & productivity for successful completion.
 In the resolution of disputes and negotiation of change orders during construction assist project manager.
 Providing guidance and assistance to all site staff with respect to any aspect of the management system applied to their area of assigned responsibility.
 Mange all phases of projects including; execution, progress meetings, change orders, payment request and quality control.

Civil Inspector (QC) / on a mission visa في Dodsal Engineering & Construction PTE. Ltd, on behalf of GIS Mutawa Inspection Services.
  • الإمارات العربية المتحدة - أبو ظبي
  • يوليو 2012 إلى يناير 2013

•  Checking materials as per approved materials submittal, project specification, local and international standards. Witness materials test, check laboratory test report and keep on file for record.
 Prepares method statement generally for Excavation, Concrete works and other related civil and architectural works.
 Ensure all measuring tools and equipment’s are calibrated prior to use and update calibration-monitoring log.
 Conduct pre inspection on site based on approved checklist to verify and validate the inspection request prior to consultant actual inspection in order to ensure full conformity of work progress.
 Prepare Inspection Request, Nonconformity Report, and Action Request for any finding during inspection; make sure the implementation of Correction, corrective and preventive action. Perform necessary coordination with construction team.
 Assist in conducting internal audit within the project in order to check the compliance to the implementation of Quality Assurance Plan.
 Preparation and implementation of weekly and monthly work plan in coordination with construction team.
 Attends coordination meeting with the client and consultant to discuss relevant technical issues arose on actual site works.
 Discuss problems encountered during construction with the Construction team and verify rectification done.

Project Engineer في Bab Al Khair Trad. & Contr. Co
  • قطر - الدوحة
  • مارس 2009 إلى مارس 2012

•  Study shop drawing, project specification and plan schedule of works. Any lack of information and details raise Request for Information to consultant
 Prepare method statement for activities and check its implementation.
 Ensures project compliance with QCS requirements based on Quality, Health and Safety, and Environmental management systems standards.
 Prepare worker allocation plan, assign workers accordingly and make work progress report.
 Supervise daily works activities on specific ‘area of responsibility’ and responsible of its work execution progress.
 Check works of subcontractors and determine productivity. Coordinate with project manager for any issues encountered in site and take necessary action to mitigate.
 Follow up project works with all site staff and evaluate their performance.
 Determine quantity materials and work force required for scheduled works and submits to project Manager for approval.
 Responsible for keeping all records of site actual works and analyzes the actual productivity of workers and equipment.

Project Engineer في Amanat Holdings Pvt. Ltd.
  • بنجلاديش
  • مايو 2008 إلى فبراير 2009

 Implementation of layout as per architectural and structural drawing.
 Responsible for all construction activities on site.
 Listing the material requirements and sending materials purchase request to head office.
 Checking the test reports, preparing materials submittals and submitting to consultants.
 Regular meeting with the senior concerned persons and client regarding the work.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Chittagong University of Engineering & Technology (CUET), Chittagong
  • مايو 2008

#Successfully completed the course of "Project management Professional". # Successfully completed the seminar titled “Key Project Management Tools.”‎ # Successful completion workshop on “Fundamentals of Earthquake Engineering” organized by Professor Dr. Mr. DURKA, KESSEL University, GERMANY. & Earthquake Engineering Research Center (EERC), Department of Civil Engineering (CUET). # Successful completion workshop on “Community Participation & Management Of Water Supply & Sanitation” organized by ITN-BUET & Department of Civil Engineering (CUET).

Specialties & Skills

Project Supervision
Site Supervision
Construction Supervision
Project Execution
Auto Cad 2D, STAAD PRO,MS Word, MS Excell, MS Project

اللغات

الانجليزية
متمرّس
العربية
متمرّس
الهندية
متمرّس
البنغالي
اللغة الأم

العضويات

Institute of Engineers Bangladesh
  • Member
  • June 2012
Institute of Engineers Bangladesh, Qatar Chapter
  • Member
  • May 2009

التدريب و الشهادات

Registered Professional Civil Engineer (الشهادة)
تاريخ الدورة:
May 2017
صالحة لغاية:
May 2020
Computer aided Structural Design. (Staad-Pro) (الشهادة)
تاريخ الدورة:
February 2008
صالحة لغاية:
March 2008