Project Construction Manager في northvolt
  • السويد - Skelleftea
  • أشغل هذه الوظيفة منذ نوفمبر 2022

ion lithium batery cars gigafactory

Construction Manager في Assystem
  • المملكة العربية السعودية - الجبيل
  • أشغل هذه الوظيفة منذ أبريل 2020

o Project description: EPCM project for a Waste to energy plant. Liquid and solid waste Class I and Class II. Organic 28Mt per year, Inorganic 20Mt per year.
o Client: Veolia

Construction Site Manager في SIDASA Engineering
  • سنغافورة
  • مايو 2017 إلى يناير 2018

Company: SIDASA Engineering.
Professional profile: Site Manager
Project location: Singapore
Client: Dorma-Kaba
SIDASA Engineering is one of the world's leading integrated surface treatment company with 65 years’ experience, applying innovative technologies and capturing new opportunities for profitable growth. SIDASA develop machines to many fields of the surface treatment industry. Researching for design, manufacturing and commissioning of fully automated plants.
SIDASA Engineering is full present in automotive industry. The company portfolio includes OEM, TIER I and TIER II. We supply a wide range of solutions not only for plastic but for metal surface treatment as well.
Project Manager and Site manager for project supervision line assembly in Singapore of a line of automatic painting by means of conveyor system and use of robots for painting.
Also, the design and the assembly of all the steel structure support for the conveyor system, curing ovens, dryers, and cabin booths, covering a total area of 1 km2. All the steel structures are bolt joined and is a three-level steel structure. Duration of the project 6 months. Project budget 5 M €.
Participation in the design and development of the entire line. construction of plans and structural calculations.
During the project visits have been made to suppliers to evaluate qualities of products to be supplied during the assembly of the plant.
Equipment assembled during the installation, ovens, dryers, painting booths, painting robots, conveyor system, blowers, AHU, RAHU, Ducts systems, cleaning tunnels, …
Commissioning (cold and hot) and plant start up.

ACHIEVEMENTS:
start the project with two months delay due to the execution of civil works and manage to deliver the project one month before deadline.

الخلفية التعليمية

ماجستير, MBA
  • في La Salle University
  • سبتمبر 1996
بكالوريوس, Civil and Mechanical engineering
  • في Universitat Politècnica De Catalunya - Barcelona Tech
  • سبتمبر 1994

Specialties & Skills

cost control
quality
problem solving
contracts
procurement