Company representative
FEED
Total des années d'expérience :13 years, 4 Mois
Design & Detailed Engineering, Construction&
Commissioning of various
•
Preparation/Review of all instrumentation deliverables like
data sheets, speci cations, I/O lists/schedules, inputs for
drawings.
•
Coordinate and interface with Departments, contractors/
consultants to resolve technical issues and ensure quality
engineering design execution and integrity.
•
Supervise the activities of the Engineering Team and
coordinate with Project team to ensure that the assigned
project meets its objectives.
•
Review the design works and studies performed by
Engineering Contractor and ensure that they are in
accordance with the technical requirements. Review and
approve drawings, speci cations and technical documents.
•
Participate and contribute in various workshops e.g. Design
reviews, HAZOP, SIL etc.
•
Participate in Consultant / Engineer / Contractor / Vendor
pre-quali cation technical audits.
•
Participate as
FEED & Detailed desig Technical & commercial Proposals
, Bid Evaluations
•
DCS/ESD/FGS/SCADA/ESD system•
DCS: Honeywell, Emerson Delta V•
ESD system: Honeywell
ROB50.221, CC-E/RTD, TCN4S-2R
•
SCADA- PLC Main Server Schneider CiTech 8.1•
OTDR, Fusion Splicing FOC testing and Joint Fluke, Fusion
Splicer Pro OTDR, FUJIKARA F1S
•
Drives Variable Freq. Schdr, Dnfos Altivar, FC 301•
Data logger Flow & Press Lacroix Sofrel DSI LS 42•
Software Remote access Lacroix Sofrel Softools•
H.M.I Automation Back Ho Twincate TE200(Software)•
Router Remote access Moxa G3101.G3201•
Router Remote access eWON Flexi 201, 202•
Valve Solenoid, FCV & MOV Burgert, Auma 5281, Aumamatic
All Projects Completed during my Current Job in A.O.T.C.
1. Haya Water-Oman
Renovation and build new of Electrical & Instrumentation system for Waste water
Pump Station (20 Nos.) Muscat, Oman-Lead Project as a Project instrument Engg.
2. Honeywell-Installation and Commissioning System architecture of Operator
Training Center-Lead Project as a Project instrument Engg.
3-Oil Filter Skid for PDO-Technical Implementation and redesigning of existing skid
as per PDOrequirement-Lead Project as a Project Engg
4-Petrofac-Successfully Complete Stainless Steel Coiled Tubing Assembly 4 skid as
per PDORequirement Lead Project as a Project Engg
5.Proli c-Installation HV & LV Motor testing unit with control and Monitoring
BACHOLOR OF ENGINEERING ELECTRONIC AND COMMUNICATION WITH FIRST CLASS DISTINCTION