Responsible for FEED/BID and Detail engineering for:
• 8 MPTA, Iron Ore Material Handling at Khondbond, Joda, Bhubaneshwar for TATA Steel (Sr. C&I Engineer: Safty Switches, Cables, IMCC interfaces, Control room layouts and Feeder schemes), India - Dec 2018 to June-2019.
• 1 X 800 MW (KPTM) Super critical thermal power plant at Krishnaptnam, Andhra Pradesh for APGENCO (Sr. C&I Engineer: Package in charge for Fuel oil handling, Ash handling, water treatment plants, Compressor unit), India - May 2017 to Jan 2019.
Responsible for detail engineering for:
• TENGIZCHEVROIL (TCO) for Future Growth Project (C&I Design Engineer), Kazakhstan (Total Project Value-$36.8 billion) - Dec 2016 to May 2017
• KNPC Clean Fuel Project - Al-Zore refinery for Detail Engineering Services scope, Kuwait (Total Project Value-$3.4 billion) - Jan 2016 to Feb 2017.
• KNPC Clean Fuel Project -MAB2 (Mina Al Abdullah) refinery detail engineering scope, Kuwait - March 2015 to Sep 2015
• Salamanca Refinery - for Pemax FEED engineering, Mexico (Expected $5 to $& billion) - March 2015 to Dec 2015
• Propane De-hydrogenation (PDH) for Williams (Sr. C&I Engineer) at Calgary Canada - Oct 2014 to March 2015
Responsible for FEED and detail engineering for:
• KAIS Combined Cycle Power Plant Algeria for GS E&C -Daelim at Algeria - March 2013 to Sep 2014
• 388 MW Combined Cycle Power Plant for PGPL Raigad, Maharashtra, India - Jan 2011 to April 2013
• 2 X 600 MW Thermal Power Plant for Jindal India Pvt. Ltd. (Client review engineering) At Odisha, Bhubaneshwar, India - July 2010 to Dec 2011.
Worked as system engineer for Rockwell automation. Implemented Ladder logic for the project control system like: Thermax furnace system, Essar's pump house system, Jindal's ESP system.
Process Instrumentation
Instrumentation Engineering