Jan Michael Daylusan, Estimation Engineer - Mechanical

Jan Michael Daylusan

Estimation Engineer - Mechanical

Arabian MEP Contracting

Lieu
Qatar - Doha
Éducation
Baccalauréat, Mechanical Engineering
Expérience
14 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 11 Mois

Estimation Engineer - Mechanical à Arabian MEP Contracting
  • Qatar - Doha
  • Je travaille ici depuis juillet 2011

1. Provide accurate pricing for Plumbing, Drainage and Fire Fighting tenders and ensure that quotations are in compliance with the project requirements.
2. Receive Tender documents (Drawings + Specification + Bill of Quantities) from Asst. Estimation Manager (Mechanical)
3. Sending Inquiries, Review Supplier Quotation and apply appropriate pricing suited for required items.
4. Review Document for important information and evaluate what is required to prepare an RFI Points to be submitted.
5. Evaluate the BOQ and ensure all important items and information is available to provide accurate pricing for different projects.
6. Quantity Take-off for Equipment Items and Complete Take-off for Job in Hand Projects.
7. Prepare Pricing Summary subject for Asst. Estimation Manager (Mechanical) approval and discussed the most important notes in the project.
8. Prepare price BOQ to be submitted in different contractors bidding for the projects.

Estimation Engineer - Mechanical à Arabian MEP Contracting
  • Qatar - Doha
  • juillet 2011 à juin 2013

1. Provide accurate pricing for Plumbing, Drainage and Fire Fighting tenders and ensure that quotations are in compliance with the project requirements.
2. Receive Tender documents (Drawings + Specification + Bill of Quantities) from Asst. Estimation Manager (Mechanical)
3. Sending Inquiries, Review Supplier Quotation and apply appropriate pricing suited for required items.
4. Review Document for important information and evaluate what is required to prepare an RFI Points to be submitted.
5. Evaluate the BOQ and ensure all important items and information is available to provide accurate pricing for different projects.
6. Quantity Take-off for Equipment Items and Complete Take-off for Job in Hand Projects.
7. Prepare Pricing Summary subject for Asst. Estimation Manager (Mechanical) approval and discussed the most important notes in the project.
8. Prepare price BOQ to be submitted in different contractors bidding for the projects.

MEPF Coordinator à New Kanlaon Construction Inc
  • Philippines
  • mars 2011 à juin 2011

1. Coordinator for Mechanical Installation to ensure all installed equipment’s and materials in accordance to project specification.
2. Attend weekly meeting to discussed work progress, Action Plan (for Delivery of Materials, Schedule of Testing, Materials Approval and progress, etc.), Discussed issue and comments of consultant with regard to installed materials and take appropriate action to solve issues
3. Updating daily working progress for installed materials & equipment’s per floor level and identify or Coordinate with sub-contractors about the work progress.
4. Prepare weekly progress report to be submitted in Construction Manager for evaluation of MEP Sub contractor working progress and take necessary action.
5. Also assigned as supervisor in installation of Sanitary Wares and Accessories (Special Cases only)

MEPF Coordinator à Webforge Phils. Inc
  • Philippines
  • juin 2009 à janvier 2011

Position: MEPF Coordinator
Department: Engineering Department
Project: Avant @ The Fort Project @ March 4, 2011 - June 28, 2011
Job Description: • Monitor's Plumbing, Drainage & Fire Fighting and HVAC Installation.
• Testing of Installation
• Coordination to MEP Sub-Contractor
• Quality Assurance / Quality Control of installed equipment and piping.
• Coordinate Technical Issue to MEP Supplier

Draftsman / Estimator à Webforge Phils. Inc
  • Philippines
  • juin 2009 à janvier 2011

1. Drafting Trench Grating, Trench Flooring, Steel Fences and Heavy Duty Gates in 2D / 3D as required / requested by our clients.
2. Follow up approval of drawings from client to proceed with the fabrication of Steel Gratings.
3. Coordinate with the clients for comments and incorporate as noted by them.
4. Site measurements to see the current conditions of site and ensure that the layout will match with the site conditions before proceeding to fabrication of Steel Gratings.
5. In some case, we are fabrication the Package Stairs (Steel Beams & Steps made by Steel Gratings) within the range of our scope.

Éducation

Baccalauréat, Mechanical Engineering
  • à Central Philippine University
  • mars 2008

• Registered Mechanical Engineer (Board Passer) Since October 2008 • Bachelor of Science Degree in Mechanical Engineering, Central Philippine University,

Etudes secondaires ou équivalent, None
  • à Polytechnic State College of Antique - Tario Lim Ruiz Campus
  • mars 2002

• Polytechnic State College of Antique - Tario Lim Ruiz Campus, March 2002

Etudes secondaires ou équivalent, None
  • à Malabor Elementary School
  • mars 1998

• Malabor Elementary School, March 1998

Specialties & Skills

Tender Preparation
Drafting
Cost Estimating
Quantity Surveying
Customer Service
AUTO CAD
AUTOCAD
CUSTOMER SERVICE
ESTIMATING
ESTIMATION
ESTIMATOR
FABRICATION
SERVICE DEPARTMENT

Langues

Anglais
Moyen

Adhésions

Grade A Contracting Company, ISO Certified, Member of Green
  • Member
Building, Member of Al Malki Group of Company
  • Member