FIELD ASSIGNMENT:
DUBAI HILLS ESTATE - DISTRICT COOLING PLANT 01 (Current)
CLIENT: EMAAR
CLIENT REPRESENTATIVE: ALLIED CONSULTANTS LTD.
DIERA WATER FRONT - DISTRICT COOLING PLANT 01 (NETWORK) (Current)
CLIENT: TABREED
PMC: ALLIED CONSULTANTS LTD.
BUSINESS BAY - DISTRICT COOLING PLANT 02 & 03 CLIENT: EMPOWER (Joint Venture of DEWA / TECOM) PMC: ALLIED CONSULTANTS LTD. DATE ASSIGNED: Feb. 08, 2014 - Jan. 31, 2017
DUTIES AND RESPONSIBILITIES:
- Coordinate and assist with contractor prior to local authority inspection requirements (i.e. DEWA (HV/LV Inspection), Civil Defense Authority, TECOM, DM, DU Telecom Inspection)
- Implementation of quality plan which include inspection, testing, documentation and ensure the compliance with approved shop drawing, code and standards, technical specification, local government regulation, manufacturer recommendations and client requirements.
- Prepare Project MV & LV schedule load calculation and single line diagram, maximum starting current calculation and required documentation for DEWA-Design NOC application.
- Review Contractor/ Sub-Contractor’s Submittals (Design Drawings, Shop Drawings, Material Submittal, Inspection &Testing Plan, Method Statement) for comments and approval.
- Review Contractor/ Sub-Contractor’s As-built Dwg., Operation and Manual Submittal, Site Theory/Training Program, Commissioning Report prior for TOC document approvals.
- Attend FAT (Factory Acceptance Test) visit for MVSG, LVSG, PLC/SCADA panel & equipment as representative for Consultants side prior for acceptance/dispatch of panel & equipments.
- Attend Work Inspection Request, Material Inspection Request, Testing and Commissioning Inspection Request issued by contractor/sub-contractor for comments and approval.
- Testing and Commissioning Inspection of MV cables/equipments (11kV Switchgear, 11kV/0.4kV Power Transformer, 11kV Soft Starter-CHILLER)
- Testing and Commissioning Inspection of LV cables/equipments (LV Switchgear, MCC, MDB, Softstarter, VFD (Condenser Pump-630kW, Secondary Pump-500kW, Primary Pump-315kW, Cooling Tower-160kW), SMDB, FDB, UPS, ATS, Generator, Capacitor Bank, Harmonic Filter)
- Testing and Commissioning Inspection of Fire Alarm & Fire Detection System (FM200/CO2) based from Fire Cause and Effect Matrix and Central Battery (Emergency/Exit).
- Testing and Commissioning Inspection of ELV System (Access Control System, CCTV, Structured Cabling, Intercom)
- Testing and Commissioning Inspection of Instrumentation/Control System (PLC/SCADA, BMS, Integrated Test, I/O data points checklist, Field Instrument Checklist)
- Inspection of water leak detection system and fiber optic cable for Chilled Water Network.
- Initiate remedial or corrective action by issuing SI/SON /NCR to performing contractor.
- Respond to correspondence through email/letter directed by Resident and Senior Engineers.
- Observe Environment, Health & Safety procedures for all inspection & testing activities.
- Prepare report to ensure and monitor the project meets the planned construction schedule versus the actual status, and to avoid any delays of activities.
- Prepare final project snag work list and outstanding list prior for TOC documents.
- Coordinate and assist in quantity surveying works.
- Coordinate with client representative related to inspection, testing activities & documentation.