Electrical Engineer
Al Mariah United Group
Total years of experience :15 years, 7 Months
Designed and implemented special strategies related to maintenance procedures. Performed routine maintenance inspections of equipment to identify and respond to problems in a timely manner, thus preventing breakdowns. Repairing and Troubleshooting Gensets from 500kva to 1mva, Power Factor Panels, LV Panels, all type of Electrical Control Panels, Low Voltage System, Sliding Doors, Fire Alarm Panel, Public Address System, Automatic lighting controls, Works on UPS Systems, MBD, SMBD, FDB, Lv panels, Water Heater panels, control panels used in HVAC system (DDR panels, Heater control panels, AHU control panel, Chiller control panels) Provided solutions and fixed equipment malfunctioning, system faults, corrective actions, modifications and performed replacements and/or new installations. Assigned personnel and technical support teams to sites requiring 24/7 maintenance. Worked with company’s vendors and supervised subcontractors during various maintenance projects to ensure proper completion of work performed at customers’ facilities.
WORK EXPERIENCE (continued)
My area of work in Trafo-Panels was to perform all tests of transformer from BCT (before connection test), ACT (after connection tests) and final tests, I also have to make reports of all tests and handing over reports as well. Except all this, I designed and developed equipment for the testing of transformer.