جيسون Cortez, QA/QC Engineer

جيسون Cortez

QA/QC Engineer

Amana Contracting and Steel Buildings

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, BS in Civil Engineering
الخبرات
20 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 4 أشهر

QA/QC Engineer في Amana Contracting and Steel Buildings
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ نوفمبر 2012

 Conduct inspections with Project Engineer and Consultant.
 Issue Non Conformance Report to subcontractor/s whose works were not complied with the approved drawings, technical submittals, and Method of Statement.
 Attend closing of NCR issued by Consultant.
 Prepare and arrange technical submittals for laboratory tests.
 Conduct material inspection with consultant.
 Receive and check material deliveries on site.
 Receive concrete deliveries at checkpoint.
 Prepare Inspection Request.
 Review and prepare Method of Statement
 Maintain QA/QC documents logs (Inspection Request, Material Inspection, Cubes, FDT, ..)
 Prepare weekly progress report.
 Attend weekly QA/QC meeting with Consultant.

QA/QC Engineer في EVAN LIM PENTA CONSTRUCTION LLC
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2010 إلى نوفمبر 2012

 Conduct inspections with Project Engineer and Consultant.
 Issue Non Conformance Report to subcontractor/s whose works were not complied with the approved drawings, technical submittals, and Method of Statement.
 Issue Site Instructions and Internal Memo to Project Engineer/s whose works were not satisfied the technical issues as per method of statement.
 Attend closing of NCR issued by Consultant.
 Prepare and arrange technical submittals for laboratory tests.
 Conduct material inspection with consultant.
 Receive and check material deliveries on site.
 Assist concrete testing at checkpoint.
 Assist preparation of Inspection Request.
 Attend weekly departments’ meeting with QA/QC Manager.

Site Inspection Engineer في TEO A. KHING DESIGN CONSULTANTS
  • الإمارات العربية المتحدة - دبي
  • مارس 2009 إلى أكتوبر 2010

 Conduct inspection with Project Engineer and QA/QC Engineer.
 Issue Non Conformance Report to Contractors’ work not complied with approved drawing, technical submittals, and Method of Statement.
 Attend concrete delivery at checkpoint.
 Material delivery inspection based on technical submittal.
 Snagging and identifying defective works, outstanding works and preparation of report to follow up with contractors prior to handling over to client.

Site Engineer في NUROL CONTRACTING LLC
  • الإمارات العربية المتحدة - دبي
  • سبتمبر 2007 إلى فبراير 2009

 Allocation and supervision of manpower with regards to quality and time schedule of the project as per technical specifications, approved shop drawings, contract requirements, site condition, and concerning authorities.
 Ensure works and activities based on latest shop drawings as well as construction drawings to would be implemented on site.
 Prepare Inspection Request with proper attachment.
 Coordination on site to subcontractors’ scope of work.
 Coordinate with MEP Supervisors regarding work schedule.
 Monitor and evaluate the performance of the workers and sub-contractors including their daily accomplishment.
 Monitoring of daily, weekly, and monthly progress.
 Attend concrete casting to ensure safety.

Site Engineer في HOUSE OF NOBLES
  • الإمارات العربية المتحدة - دبي
  • يوليو 2006 إلى أغسطس 2007

 Supervise construction activities to ensure that the method statement and standard quality work procedure are properly carried out.
 Coordinate with site manager (Project Engineer) regarding work activities and work schedule.
 Read and interpret drawings to be implemented in site.
 Prepare daily report and daily activities.
 Conduct joint inspection with Project Engineer and Inspectors
 Attending weekly coordination meeting for the progress of work.

Junior Site Engineer في G.S. DIMACULANGAN CONST. INC.
  • الفلبين
  • ديسمبر 2003 إلى مايو 2006

 Supervise construction activities to ensure that the method statement and standard quality work procedure are properly carried out.
 Coordinate with site manager (Project Engineer) regarding work activities and work schedule.
 Read and interpret drawings to be implemented in site.
 Prepare daily report and daily activities schedule for tomorrow.
 Conduct joint inspection with Project Engineer and Inspectors
 Attending weekly coordination meeting for the progress of work.

الخلفية التعليمية

بكالوريوس, BS in Civil Engineering
  • في Polytechnic University of the Philippines
  • نوفمبر 2003

Specialties & Skills

Testing
Preparation
Inspection
Instructions
Autocad

اللغات

العربية
مبتدئ

العضويات

OFCEA
  • memeber
  • April 2010

الهوايات

  • Sports