Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Jeffrey Lacang, Qa/qc Civil Inspector

Jeffrey Lacang

Qa/qc Civil Inspector·Saudi Services for Electro Mechanical Works

Philippines

Bachelor's degree, Civil Engineering

Work experience

Total years of experience: 30 years, 6 months

Qa/qc Civil Inspector

August 2019 - Present

Saudi Services for Electro Mechanical Works

Jizan, Saudi Arabia

August 2019 - Present

Project Description : Construction of RO / STP Jizan Saudi Arabia

Company industry:
Utilities
Job role:
Quality Control

3rd Party Lead Civil Inspector

September 2015 - April 2017

Imtech Suir Engineering

Riyadh, Saudi Arabia

September 2015 - April 2017

 Implement the Project Quality Plan, Quality Control Procedures and ITPs in coordination with Site QA/QC Manager. Expedite the review and approval of documents with Client.
 Monitor the performance of Main-contractor to ensure the respect of work’s are carried out as per standard and specifications.
 Initiate action to prevent the occurrence of any non-conformance.
 Review corrective actions recommended in non-conformance reports, initiate and verify corrective actions to prevent reoccurrence of non-conformity.
 Initiate record or provide solutions for quality problems.
 Ensure site personnel follow the Quality Assurance system and assist in training of site personnel in the QA/QC system.
 Development of inspection and test plans (ITP’s), checklists and reporting formats. Maintaining them during the course of the project. Ensure that all inspections and tests are carried out as indicated on the appropriate Inspection & Test Plan (ITP).
 Ensure that all inspections and tests are recorded on the appropriate form or checklist, as indicated on the relevant ITP, and that all documentation is filed in a safe and secure manner.
 Ensure that all Inspection Requests are submitted as required and liaise with Client staff regarding timings of such inspections.
 Raise Non Conformance Reports (NCRs) and Discrepancy Report (DR), when activities deviate from the Contract Specifications or normal Construction industry practices.
 Co-ordinate with the Site / Independent Testing Laboratory / Third Party Inspection and project Construction in conducting tests and to document and submit them for Client’s approval.
 Liaise with Client staff regarding any non-compliances, complaints or areas of concern to ensure that these are handled in a timely and effective manner.
 Preparation of handover documentation packages as required.
 Supervise all inspectors and QC staff and involve in Inspection activities as required for effective quality control of project activities.
 Comply with all safety instructions and standing instructions.

Company industry:
Management Consulting
Job role:
Consulting

Civil / Structural Inspector

September 2013 - May 2015

Australia Engineering Company Saudi Arabia

Jeddah, Saudi Arabia

September 2013 - May 2015

Implement the project Quality Plan in coordination with QA / QC Dept. to ensure an effective quality management system with respect to IMS and Contract requirements are established in the project / Responsible to organize, implement, conduct and manage the QA / QC Programs as per the company’s Quality policy and contract specification requirements of the projects division / Working as front line engineer and coordinate with all inspections, monitor the required tests and record inspections and tests made as per PQP and Contract specifications and attainment of quality requirement / Coordinate with the Project Manager / Site Staff regarding work performance and shall have the authority to stop in any area where discrepancies remain uncorrected and shall cancel the work or Non-Conformance Reports upon satisfactory correction of noted deficiencies / Reporting to QA / QC Manager on the performance of IMS in the Projects and any need for improvement / Monitoring construction quality personnel for the proper implementation of Project Quality Manual and Inspection Test Plan for the project / Controls and Maintain QA/QC related documents and reports / Review and inspect all works to be executed and ensure it is done according to the approved drawings and specifications / Review and inspect all equipments and materials delivered to the site / Assuring that the environment, health & safety procedures and rules are respected / Responsible for monitoring all the construction works on site / Interpret drawings and prepare materials for the job requirements / Delegate tasks & supervise the site to ensure that the project progresses smoothly and on schedule / Attending weekly progress meeting for the ongoing project / Supervising and monitoring to ensure the construction progresses smooth and on schedule / Prepare and provide materials required for every job activities / Check construction activities daily to ensure the accuracy of work performed as per contracts plans and drawings / Attending weekly progress meeting & responsible for preparation of project As-built drawings.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Sr. Qa/Qc Engineer

August 2012 - July 2013

SEPAM Project Management

Abu Dhabi, United Arab Emirates

August 2012 - July 2013

 Monitor the performance of Main-contractor to ensure the respect of work’s are carried out as per standard and specifications.
 Supervise and monitor the TPI inspectors to assure the works of contractors and sub-contractors are inspected and documented according to project QMS.
 Evaluate and review TPI surveillance reports to the contractor and raise Non Conformance Reports (NCR) if the works carried out is not in accordance with the approved drawings and project specifications.
 Controls and Maintain QA/QC related documents and reports.
 Performed a weekly RFI and NCR statistics reports and submit to client by weekly and monthly basis.
 Review and inspect all equipments and materials delivered to the site.
 Monitoring the material / equipment handling, storage and preservation on site and warehouse lay down yard.
 Coordinate the weekly NCR meeting between Main Contractor, PMC & PMT.
 Review of contractor QCIR to ensure the proper documentation, filing and recording prior to Qc Dossiers Handover.
 Assure that the environment, health and safety procedures and rules are respected.

Company industry:
Business Consultancy Services
Job role:
Quality Control

August 2011 - June 2012

Petroleum Chemicals and Mining Company Ltd

August 2011 - June 2012

MA'ADEN Aluminum Rolling Mill Plant Project, Ras Al-Khair - Saudi Arabia

Function / Responsibilities:
•Implement the Project Quality Plan, Quality Control Procedures and ITPs in coordination with Site QA/QC Manager/Senior QA/QC Engineer. Expedite the review and approval of these documents with Client.
•Initiate action to prevent the occurrence of any non-conformance.
•Review corrective actions recommended in non-conformance reports, initiate and verify corrective actions to prevent reoccurrence of non-conformity.
•Initiate record or provide solutions for quality problems.
•Ensure site personnel follow the Quality Assurance system and assist in training of site personnel in the QA/QC system.
•Responsible for the Independent Testing Laboratory activities.
•Development of inspection and test plans (ITP’s), checklists and reporting formats. Maintaining them during the course of the project. Ensure that all inspections and tests are carried out as indicated on the appropriate Inspection & Test Plan (ITP).
•Ensure that all inspections and tests are recorded on the appropriate form or checklist, as indicated on the relevant ITP, and that all documentation is filed in a safe and secure manner.
•Ensure that all Inspection Requests are submitted as required and liaise with Client staff regarding timings of such inspections.
•Raise Non Conformance Reports (NCRs) and Discrepancy Report (DR), when activities deviate from the Contract Specifications or normal Construction industry practices.
•Co-ordinate with the Site / Independent Testing Laboratory / Third Party Inspection and project Construction in conducting tests and to document and submit them for Client’s approval.
•Liaise with Client staff regarding any non-compliances, complaints or areas of concern to ensure that these are handled in a timely and effective manner.
•Preparation of handover documentation packages as required.
•Supervise all inspectors and QC staff and involve in Inspection activities as required for effective quality control of project activities.
•Comply with all safety instructions and standing instructions.

Company industry:
Construction & Building
Job role:
Other

Civil QA/QC Supervisor

December 2009 - June 2011

Linde Engineering Middle East L.L.C

Canada

December 2009 - June 2011

Project Description: Mirfa 1- Elixier 2 Project - Construction of Air Separation Plant for Nitrogen Gas Generation and Seawater Intake & Outfall Project, Mirfa City - Abu Dhabi
Function / Responsibilities:
•Monitor the performance of sub-contractors to ensure the respect of work’s standard and specifications.
•Review all contractors ITP’s in accordance to the Linde minimum ITP requirements.
•Review and inspect all works to be executed and ensure it is done according to the approved drawing and specifications.
•Controls and Maintain QA/QC related documents and reports.
•Performed a day to day inspection according to the RFI's schedule submitted by contractor.
•Review and inspect all equipments and materials delivered to the site.
•Review and approved material submittal and method statement submitted by contractor.
•Attending QA/QC weekly meeting between the Owner and the contractor.
•Responsible for witnessing any materials testing and concrete delivery on site.
•Review of all material test reports submitted by contractor.
•Responsible for issuing of Non Conformance Report or Surveillance Reports to contractor if works found not as per drawing and required project specifications.
•Responsible and interact for an internal / external audit performed by the owner/company.
•Performed a punch listing prior to schedule of final inspection and pre-commission.
•Assure that the environment, health and safety procedures and rules are respected.

Company industry:
General Engineering Consultancy
Job role:
Quality Control

QA/QC Engineer

August 2008 - October 2009

SNC-LAVALIN Gulf Contractor L.L.C

August 2008 - October 2009

(1 Yr.)

Company industry:
Construction & Building
Job role:
Quality Control

Qa/Qc Superintendent, Qa/Qc Engineer/Inspector, Site Engineer

May 2006 - July 2008

May 2006 - July 2008

Sharq 3rd Expansion Polyethylene Plant Project - Jubail City (Client- Linde Arabi, Saudi Arabia

Job role:
Other

Start / End Date

November 1997 - July 2008

Saudi Binladin Group

Canada

November 1997 - July 2008

Company industry:
Construction & Building
Job role:
Other

QA/QC Superintendent

November 2004 - November 2006

November 2004 - November 2006

Linear Alpha Olefins Project - Jubail (Client- Linarco/Linde Saudi Arabia

Job role:
Quality Control

QA/QC Engineer/ Inspector

January 2003 - January 2004

January 2003 - January 2004

Jubail United Petrochemical Project - Jubail City (Fluor Arabia

Job role:
Quality Control

Site Engineer

January 2001 - January 2002

January 2001 - January 2002

Ibn Zahr Common Facility Upgrade - Jubail City (Lummus Aleriza

Job role:
Civil Engineering

Site Engineer

January 2000 - January 2001

January 2000 - January 2001

Ibn Zahr Polypropylene II Project - Jubail City (Parson Saudi Arabia

Job role:
Civil Engineering

Qc Inspector

January 1998 - January 1999

Saudi Aramco

United Arab Emirates

January 1998 - January 1999

Shell Refinery Package Preparation for Major Shutdown “Turn Around 2000” - Jubail City (SHELL Saudi Arabia

Company industry:
Oil & Gas
Job role:
Quality Control

Maintenance Planner

January 1997 - January 1998

January 1997 - January 1998

Petrokemya Petrochemical Plant Project - Jubail City (Fluor Arabia

Job role:
Maintenance, Repair, and Technician

Site Supervisor, Offshore Maintenance Planner

March 1993 - July 1997

Hadi H. AL-Hammam Contracting & Establishment, Saudi Arabi

Canada

March 1993 - July 1997

Job role:
Maintenance, Repair, and Technician

Education

Cebu Institute of Technology University

March 1990

March 1990

Bachelor's degree, Civil Engineering

Philippines

GPA (rating): Good

GPA (rating): Good

Graduate of five years BS Civil Engineering
View attachment

Skills

CALIBRATION
Expert
CALIBRATION
Expert
CUSTOMER RELATIONS
Expert
CUSTOMER RELATIONS
Expert
DELIVERY
Expert
DELIVERY
Expert
DOCUMENTATION
Expert
DOCUMENTATION
Expert
ISO
Expert
ISO
Expert
MA
Expert
MA
Expert
MATERIALS MANAGEMENT
Expert
MATERIALS MANAGEMENT
Expert
MICROSOFT WORKS
Expert
MICROSOFT WORKS
Expert
PERSONNEL
Expert
PERSONNEL
Expert

Training and Certifications

Certifications
Work Certificate

Hobbies and interests

Playing Tennis and Singing