Project Management Supervisor/ Estimator
Waltermart Shopping Center Management Inc.
Total des années d'expérience :5 years, 2 Mois
Project Handled: Renovation, Painting, Repair and Maintenance for 41 mall branches.
• Prepare Bill of Quantities in comparison with submittal of Subcontractor
• Compile tender documents for projects during pre-contract stage.
• Conducted feasibility studies, cost estimates, and quantity take-offs.
• Review costing and negotiated with subcontractors.
• Prepare activities for the projects and provide timeline for completion.
• Quality check and supervise repair and maintenance works for malls.
• Review Contract, Issued plans and actual site requirements prior mobilization.
• Facilitate repainting for the mall to have a fresher look.
• Generate report to be presented at top management for progress of projects.
Project Handled: 52 story resort inspired residential with 6 Basement, 3 Swimming pools, Functional Roofdeck and Podium.
• Quantity take off using Excel, Planswift, Revit Model, AutoCAD and Cost X.
• Request materials for the completion project using extracted quantity.
• Communicate with suppliers regarding price, stock, and delivery timeline.
• Provide documentation for budget rehash during post contract.
• Quality checks the work done to abide with the drawings and specification.
• Prepare BOQ for project activities and provide corresponding cost and identify which items can be negotiated to maximize savings for the project.
• Counter check issued budget vs actual accomplishment.
• Prepare regular progress reports, highlighting key accomplishments, challenges, and recommended solutions to senior management.
• Prepare Material approval, CVI, RFIs, RFAs, drawings, and other documents.
• Quantify the kilograms of rebar, formworks area and volume of concrete.
• Review scope of works and contract of subcontractors.
• Evaluate variation order for additive and deductive works.
• Review construction notes and rebar cutting list as a guide for inspection.
• Compare actual quantity and estimates vs awarded during budget rehash.
• Inspect the installed formworks per structural member as per checklist.
• Design formworks systems.
• Led a group of manpower with around 500 personnel during project.
• Prepare project activities, timeline and manpower loading for activities.
• Review methodologies for every activity from structural to fitout
• Inspect lay-out, MEPF, and other requirements prior and during mobilization.
• Quality checks all the works prior, during and after activities.
• Conduct construction meetings to address bottle neck concerns.
• Project Planning prior mobilization for seamless execution.
• Estimating quantities with respect to unit measurement for awarding of contract.
• Site Inspection and Assessment of ongoing and completed works.
• Construction Supervision to fast-track projects and critical activities.
• Quality Control to mitigate back jobs for the projects.
• Health and Safety to mitigate occurrences of accidents.
Studies civil engineer