HVAC Commissioning Engineer
T&C Technology Engineering Services LLC
Total years of experience :16 years, 8 Months
Directly reporting to the Commissioning Manager for updates, reports and progress of the project.
Responsible for checking and reviewing mechanically related drawings such as shop drawings and design drawings including as built drawings.
Prepares and updates Installations and Commissioning Progress reports.
Coordination with the consultants and sub contractors regarding commissioning activities
Conducts Commissioning and Testing of all Mechanical Systems and some Electrical Systems
Chilled Water System
Fan Coil Units
Air Handling units
Extract Fans ( Smoke Extract Fans, Stair Pressurization Fans, Kitchen Extract Fans)
Fire Fighting System ( Fire Pumps, Fire Hydrants, Deluge System, Sprinkler System)
Public Health Pumps including Domestic Water Lines, Sump Pumps
Assist Inspection of Low Voltage Panel and Extra Low Voltage System
Inspection for Functional Testing of PLC panels for Building Management System(BMS)
Assist in the Commissioning and Testing of Standalone & Cause and Effect Tests for Fire Alarm System.
Ensures the proper implementation of inspection and testing procedure, project commissioning procedures, method statements and testing plans through monitoring of the related site activities including Health and Safety rules.
Preparing and making of all O&M Manuals prior to the submission to the client
Supervise troubleshooting and repair of defective electrical & mechanical equipment, including its controls.
Conduct witnessing and inspection with the Consultant for Final Approval of IRC’s
In-charge in the closing out of DLP’s and making spreadsheets for DNF(Defect Notification Form)
1. Project: • The Ritz-Carlton Grand Canal Abu Dhabi (Marriot Hotel and Resort)
\[Worked as an MEP Commissioning Engineer in HLG, May 2012-December 2013\]
An international five star hotel located in front of Grand Mosque along Sheik Zayed Road in
Abu Dhabi. It consists of 10 buildings with more than 500 guest rooms and with different
restaurants, with 85 villas (130m by 90m floor area) and 13 Venetian Village (52 units)
which is already currently operating.
Job Description: • Directly reporting to the Commissioning Manager for updates, reports and progress of the project.
• Responsible for checking and reviewing mechanically related drawings such as shop
drawings and design drawings including as built drawings.
• Prepares and updates Installations and Commissioning Progress reports.
• Coordination with the consultants and sub contractors regarding commissioning
activities
• Conducts Commissioning and Testing of all Mechanical Systems and some
Electrical Systems
• Chilled Water System
• Fan Coil Units
• Air Handling units
• Extract Fans ( Smoke Extract Fans, Stair Pressurization Fans, Kitchen
Extract Fans)
• Fire Fighting System ( Fire Pumps, Fire Hydrants, Deluge System, Sprinkler
System)
• Public Health Pumps including Domestic Water Lines, Sump Pumps
• Assist Inspection of Low Voltage Panel and Extra Low Voltage System
• Inspection for Functional Testing of PLC panels for Building Management
System (BMS)
• Assist in the Commissioning and Testing of Standalone & Cause and Effect
Tests for Fire Alarm System.
• Ensures the proper implementation of inspection and testing procedure, project
commissioning procedures, method statements and testing plans through monitoring of the related site activities including Health and Safety rules.
• Preparing and making of all O&M Manuals prior to the submission to the client
• Supervise troubleshooting and repair of defective electrical & mechanical equipment,
including its controls.
• Conduct witnessing and inspection with the Consultant for Final Approval of IRC's
• In-charge in the closing out of DLP's and making spreadsheets for DNF (Defect
Notification Form)
2. Project: • Khalifa Port (Abu Dhabi)
\[Worked as a QA/QC Engineer in Rotary Gulf, March 2011-November 2011\]
Khalifa Port is the new state of the art gateway to Abu Dhabi. It is now handling all of Abu
Dhabi's container traffic. Khalifa Port has the first semi-automated container terminal in the region.
The offshore Port has been constructed on a reclaimed Port Island with an offshore area
extending over 2.7 square kilometers and the Container Terminal situated more than four
kilometers out to sea. This is to help protect the Ras Ghanada coral reef, adjacent to the onshore port areas. ADPC spent AED 880 Million (USD 240 million) building the 8
kilometer-long Environmental Protection Breakwater that helps protects the marine life and coral reef.
Company: TIPCO (Philippines)
Position: Maintenance Cadet Engineer/ Back-up Planner
Date Joined: June2007 - December 2007
Job Description: • In-charge in the maintenance of the paper machines and all other equipments in the plant
• In-charge in the purchasing and ordering of the materials needed
• In-charge in the making of bar graph and maintenance schedules
• Coordinates with Sub Contractor for the Planned Maintenance Shutdown of the plant
• Prepares as Built as well as shop drawings
• In-charge in the fabrication of materials needed in the plant
• Registered Mechanical Engineer Professionals Regulatory Commission, Manila Philippines April 2008 • Bachelor of Science in Mechanical Engineering Saint Louis University, Philippines