Senior Supervision Manager
astad project management
مجموع سنوات الخبرة :35 years, 9 أشهر
Reviewed engineering design drawings, constructability and other related engineering documents to identify potential problems ahead of time and proactively implemented solutions.
•Led and directed teams of supervision engineers to ensure all construction activities are in conformance with approved design plans and specifications.
•Reviewed and approved subcontractor pre-qualification submission
•Oversaw all on site project activity to ensure projects are completed on schedule, within budget, and in accordance with the engineering design.
•Took corrective action as needed during project phases and consulted with project designers to resolve issues arising during project execution.
•Oversaw contractors, sub-contractors, and vendors/ suppliers performing on the project.
•Conducted and chaired technical meetings to resolve technical issues and propose solutions.
Coordinated and communicated between field designer and client
•Reviewed, recommended and approved all construction change requests, on site change orders and pay requests
•Interfaced project status and coordinated as required to resolve issues with site construction, procurement and/ or engineering
•Controlled project cost and progress ensuring completion on time, within the budget and in accordance with the engineering design
•Reviewed and approved all the resources required for the execution of the project
•Reviewed and approved the project execution plan and schedule
•Prepared the project manpower histogram
•Prepared the project cash flow diagram
•Attended and chaired project progress meetings
Managed the execution of construction projects
•Developed method statement and procedures for work execution
•Controlled project quality, and health and safety during execution
•Managed third party sub-contractors
•Determined resources required for the execution of projects
•Conducted performance site inspections and quality control
•Prepared site reports documenting the progress to date
•Prepared material approval submissions, method statements, inspections, and test plans
•Prepared the monthly progress for payment requests
•Ensured the best utilization of resources
•Carried out falsework and formwork design, and prepared the relevant shop drawings.