Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Jino Peechanatt, Manager/ Lead Engineer -Offshore / Subsea

Jino Peechanatt

Manager/ Lead Engineer -Offshore / Subsea·Saipem - United Arab Emirates

United Arab Emirates

Master's degree, MS in offshore Technology

Work experience

Total years of experience: 18 years, 9 months

Manager/ Lead Engineer -Offshore / Subsea

June 2021 - Present

Saipem - United Arab Emirates

Abu Dhabi, United Arab Emirates

June 2021 - Present

LTA124 Project- EPCIC of the below

• Demolition of existing PDMs (5 Decks /Jackets)

• Five (5) Nos. New SSS Gas lift PDMs (5 Decks/ Jackets)

• Twenty (20) No. Subsea Flowlines (4”, 6” Gas Lift and 5 no's piggyback, Total 125 KM)

• Three (3) Nos. 16” Oil P/L (Total 6 KM)

• Two (2) Nos. 12” Oil P/L (Total 11 KM)

• Five (5) Nos. 5 kV subsea cables (Total 17.4 KM)

• One (1) No. FO Cable (Total 5.85 KM)

• Demolition of Spools, P/L and Cables



LTA-68 Project-one oil producer & two water injection (PDMs) platform deck and associated facilities in Marjan Field. EPCIC of subsea Pipelines, Cables, Valve Skids and Tie-ins.



LTA-70 Project-Replacement of 48” Crude line at Ras Tanura Terminal and Sea island. EPCIC of CLS-14R pipelines in the Ras Tanura Terminal North, Demolition of existing Subsea Spool and Riser, Installation of New Riser, Spool, Dropout Spool & Riser Guard Installation.



LTA-63 Project-Replacement of Two (2) Trunklines in Zuluf field.



LTA-57 Project-Five (5) drilling Jackets

Company industry:
Oil & Gas
Job role:
Oil and Gas

Construction Manager

August 2020 - June 2021

Al hassanain BSC

Manama, Bahrain

August 2020 - June 2021

Bapco Modernisation Project (Sealines, Wharf Gantry demolition & Jetty construction)• 3 no’s 24” sealines from onshore to the sea island wharf, connecting at the T-head Wharf; 1 no 14” sealine from T-Wharf to the Sea island Wharf as well as 3” X 2 no’s nitrogen and instrument air sealines.•Fabrication, Testing and pipe line installation (Shore pull and sinking analysis), •Temporary cathodic protection and permanent impressed current cathodic protection.• Trenching, laying, testing, backfilling, pre-commissioning, preservation etc• Fiber optic cables and instrument cables including trenching, laying, testing, temporary coiling, connection at tie-in points (T-head and Island Wharves)•Temporary jetty (including supply, construction, dismantling & restoration)• Manage project time, cost budgets, quality, risk, interfaces, stakeholders and documentation including project progress certification and Change order management•Address delays/technical issues/discrepancies and advise solutions

Company industry:
Oil & Gas
Job role:
Oil and Gas

Senior Project/Construction Engineer

September 2018 - August 2020

SK Engineering and Construction

Al Ahmadi, Kuwait

September 2018 - August 2020

Al Zour Refinery Project Package EPC#05 (Sea Island and Topside), Kuwait
• Responsible for the piping/ structural/ mechanical construction works, both during preparation and execution phase for topside project at offshore island.
• Assisting Topside and Hook Up Manager for all related matters.
• Provide disciplined support on HSE, Quality and Technical needs.
• Leading piping/ structural / mechanical hook up engineering process at site.
• Responsible for the interface with the discipline engineers from detailed design department, within project/JV, related vendors and Client.
• Prepare or Review piping / structural/ mechanical; technical documents including fabrication drawings, method statements, project procedures and risk assessment for submission to client and to ensure that they meet project specification.
• Define the consumables, tools, materials or services to be purchased / subcontracted for offshore execution in conjunction with Topside/Hook Up Manager.
• Comment and approve all the technical design necessary for the purchase and/or construction of offshore works aids.
• Participate in meetings to examine and, if necessary, audit the technical design.
• Advise on cost and scheduling impacting issues.
• Contribute for optimization of offshore duration and costs.
• Responsible to ensure a safe and effective hook up methodology.
• Ensure that critical RFQ and PO, are issue and finalized on time.
• Ensure offshore team and project equipment are ready for the mobilization on time
• Plan offshore work campaign efficiently with the aim of minimizing Project costs.
• Follow up activities offshore along with daily and weekly reporting.
• Develop material / equipment requisitions aligned to task / job cards, provide guidance on package requirements. (i.e. Bag & Tag details.)
• Identify and support the timely delivery of documentation, fabrication, materials, personnel and vendors aligned to Project delivery schedule.
• Assist Hydrotest/ pre-commissioning team in completion of testing and handover works.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Subsea Pipeline Engineer

May 2017 - August 2018

SK Engineering and Construction

Al Ahmadi, Kuwait

May 2017 - August 2018

Al Zour Refinery Project Package EPC#05 (Subsea Pipeline & Marine Project), Kuwait
•Contractor representative onboard pipe lay /construction barge DLB1600 and Stingray.
•Responsibilities include Engineering, procurement, fabrication, transportation, installation and pre-commissioning with adherence to HSE (Hazard Identification, Risk Assessment, Job safety analysis etc.) & Quality policies.
•Construction Engineering including transportation & installation engineering (Shorepull & Installation analysis, Mooring analysis, Davit analysis, Stalk on, Sea-fastening & transportation analysis of concrete coated pipes and pre-fabricated structures etc.)
•Shore pull and Installation of 4 nos. x 30” offshore pipeline & 1 no. x 10” offshore pipeline (17.5 Km) with two Fibre Optic Cables piggybacked to two 30” pipeline each.
•Fabrication and installation of Stalk-on pipes, pile clamps, brace clamps, risers/ j-tubes clamps, Risers, J-Tubes, Riser Protectors, Offshore tie-ins, concrete mattresses and construction aids.
•Flooding, Cleaning, Gauging, & Hydrostatic Testing (including Mothballing)
•Multibeam echo sounder, Side scan sonar, Diver video and ROV Survey.
•De-watering, Intelligent pigging, drying and nitrogen purging of pipelines.
•Contract Management, Interface Management, Cost management including project progress certification and Change order management
•Report delays/technical issues/discrepancies and advise/recommend remedial solutions.
•Engineering, procurement, fabrication, installation & pre-commissioning of HDPE outfall pipeline installation project (offshore)
•Construction and Installation Engineering, Trenching, PE welding, launching, installation using float & sink, pre-commissioning & testing, installation of diffuser riser, diffuser dome, marker post, air release valve chamber installation, backfilling using crushed stone, concrete mattress and indigenous soil.
•Construction engineering, fabrication and project management of onshore pipelines segment from permanent pig launchers to landfall tie in point using golden joint.

Company industry:
Construction & Building
Job role:
Engineering

Research Engineer

August 2014 - April 2017

University of Stavanger

Norway

August 2014 - April 2017

• Research and analysis of the heat loss from uninsulated pipes, insulated pipes, deck elements in cross-flow wind and time to freeze for liquids inside pipe based on actual experiments at GMC’s climate laboratory at Stavanger, Norway.
• ASME Journal paper titled “OMAE-17-1126 Heat Loss of Insulated Pipes in Cross-Flow Wind” published online in the Journal of Offshore Mechanics and Arctic Engineering on 12th October 2018 and shall be published in the printed edition of the Journal in April, 2019.
• Technical papers reviewed by industry peers were presented in 36th international Conference on Ocean, Offshore and Arctic Engineering OMAE2017, June 25-30, Trondheim, Norway.
• OMAE2017-61588 “Heat Loss of Heated Deck Elements in Cross-Flow Wind”. Proceedings of the ASME 2017 36th International Conference on Ocean, Offshore and Arctic Engineering OMAE2017, June 25-30, Trondheim, Norway.
• OMAE2017-62000 “Calculation of Time-To-Freeze for liquids in pipes”. Proceedings of the ASME 2017 36th International Conference on Ocean, Offshore and Arctic Engineering OMAE2017, June 25-30, Trondheim, Norway.

Company industry:
Primary, Prep, & Secondary School
Job role:
Research and Development

Offshore Field Engineer

May 2014 - July 2014

Valentine Maritime (Gulf) L.L.C

Canada

May 2014 - July 2014

ADMA OPCO-Satah Al Razboot (SARB) Package 3 Field Development Project, UAE
•Lead offshore field engineer for the shore pull and subsea pipelaying, piggybacked subsea power/communication cable laying, umbilicals, risers and installation of sleepers and structures (Jackets, Decks, Flare Towers, Bridges & Boat landings)
•Preparation/review of procedures, drawings and reporting discrepancies, errors and omission with respect to the information required to perform the work.
•Actively participate in project Task Risk Assessment, HAZID and HAZOP.
•Recommend changes in the technical details and drawings to generate safer and better installation procedures with due regard to safety.
•Planning and execution of offshore operations & mobilisation/demobilisation activities.
•Preparing the list of project materials including installation aids, consumables and liaise with procurement for ordering and inspection ensuring timely delivery at site.
•Maintaining checklists for all activities, items and spares required for operations.
•Developing loadout and seafastening plans for the transportation of materials/ structures to the offshore site that facilitates safe and timely installation.
•Liaise with the Customer representative, various subcontractor representatives, Barge superintendent at the offshore site and with the Operations Engineer.
•Witnessing / inspecting pre-rigging, loadouts, seafastening and acknowledging the receipt of fabricated structures, line pipe and other materials to be installed offshore.
•Managing pre-commissioning activities like pipeline flooding, cleaning, gauging, calliper pigging and hydro testing.
•Miscellaneous Field Engineering, including: Final Spool Piece Geometry, Pipeline Laydown, Design/modification of installation aids, Vessel modifications/repairs, Anchor Patterns, Dive Plans, Rigging Calculations, Structural Design Calculations etc.
•Conducting/Inspecting site integration test (SIT) and attending FATs at vendor works.
•Preparing Post-Job Reports / collating as-built documentation and records.

Company industry:
Oil & Gas
Job role:
Oil and Gas

Lead Project Engineer

December 2011 - April 2014

Larsen and Toubro Hydrocarbon Engineering

India

December 2011 - April 2014

PTTEP International-Zawtika Field Development-Phase 1A, Myanmar
•Lead engineer for the engineering, procurement, construction, installation and pre-commissioning of three wellhead platforms consisting of jackets of length 140-150 m weighing 7, 000-8, 000 T, topsides weighing 1100-1200 T and 21km subsea pipeline.
•Responsible for the fabrication works and deputed at L&T’s Modular fabrication yard at Oman during the construction phase of Jackets/Topsides as PMT representative.
•Supervising four disciplines in topside structure: structural, piping, mechanical, safety.
•Reviewing of procedures, drawings and other deliverable. Reporting discrepancies, errors, and omissions in the information required to perform the work at site.
•Participate in project Risk Assessment, HAZID and HAZOP.
•Recommend changes in the technical details and drawings to generate safer and better installation procedures with due regard to safety.
•Monitoring the procurement process from material requisitioning (MR), ordering, inspection until final delivery at site.
•Ensuring that the project follows the mandatory project management system and assurance processes.
•Managing client expectations and making sure that the project is delivered as per Client requirement / Contract / Specification.
•Maintaining strict adherence to project quality, health, safety, environmental, cost, and schedule guidelines.
•Ensuring proper usage of project material and ascertaining reconciliation during and after execution of the project.
•Monitoring the progress of the work and site conditions and advising the Project Manager of any development that may result in changes to the project schedule and / or execution sequence.
•Raising Technical query, site query, overall contract management, change orders (COs), Management of change (MOCs), strict adherence to project specification, scope of work, and material grades resulting in proper implementation.
•Pre-commissioning activities of the topsides/jacket systems.
•Inspecting pre-rigging, loadouts, seafastening and developing checklists in accordance with procedures.
•Offshore commissioning of the plant including troubleshooting of topside systems and resolution of technical problems arising at offshore during start up and first gas.
•Liaising with the client's offshore team to ensure proper handover of systems and handling As-Built documentation to effect final handover and close out.

Company industry:
Oil & Gas
Job role:
Engineering

Project Engineer

September 2007 - November 2011

Reliance Industries Ltd

Mumbai, India

September 2007 - November 2011

R series and Satellite Field Development Project, India
• Conceptual studies for the development of R-series and satellite fields present in the large KG-D6 block involving the effective usage of the existing Dhirubhai 1&3 facilities both onshore and offshore.
• Preparing the scope of work, RFQs and Technical evaluation of the bids and responding to the technical clarification sought by the bidders.
• Reviewing the project execution plan submitted by the contractor.

Liquid & Solid Bulk Storage and Pumping Facility, Kakinada Shore Base-Finger Jetty
• Reviewing pipeline system design required for pumping liquid bulk product from shore tanks to OSV tanks and vice versa and also between the system.
• Reviewing PFDs, Pump adequacy report, Tank fabrication drawings, piping layout, Isometric drawings, piping material specification, pipe fittings and valve MTOs.

Remedial works on the well A5 of the Dhirubhai 1&3 Gas field, India
• Preparing SOW for remedial works on A5 well caused due to well related issues.
• Developing the FIM list having ROV tools, Pressure caps, Wet Parking frames etc.
• Performing retrieval of installed rigid jumper between PLET and XMT.
• Load-out, Rigging, Sea Fastening and refurbishment of the retrieved jumper
• Assessing metrology data for modification after XMT replacement & final installation.

Dhirubhai 1 & 3 Gas and D-26/MA Oil Field Development Project, India
• Project Engineer (Client representative) on board Trailer Suction Hopper Dredgers (TSHDs), Cutter Suction Dredgers (CSDs) and Rock dumping vessels.
• Supervising offshore pipelaying of 3*24-inch trunk lines piggybacked with 6-inch MEG line, 1*12.75-inch effluent line and 2*101 mm OD Type 0 power umbilical.
• Overseeing the various stages involved in the pipelaying like pull-in operation, joint preparation, welding, QC/NDT, field joint coating and anode installation.
• Progress and As-Built survey of backfill operation & Touchdown survey of pipelines.
• Monitoring the pre-commissioning of Trunklines, MEG line and effluent line from the LFP to the CRP which included flooding, cleaning, gauging and hydrotesting.
• Supervising the fabrication works of 6 inch, 8 inch, 10 inch, 16 inch and 24 inch jumpers for subsea tie-in connection and 24 inch spools for hook up to the platform.
• Confirming orientation and alignment of connectors before actual fit-up for welding.
• Reviewing of procedures, specifications, method statements, ITP’s, pre-fabrication drawings and metrology drawings pertaining to fabrication.
• Handling the issuance of all FIM materials, manpower and machinery management.
• Witnessing NDT of the field joint, HSS coating, VIV strakes installation, anode installation, hydrotesting, MEG fill and site integration test (SIT) of the jumper.
• Inspecting rigging, loadouts, seafastening on the barge prior to sail away of the jumper.
• Reviewing of As-built drawings of backfill works, alignment drawings of offshore pipelines & umbilicals, overall field layout and drawings showing approach details.
• Deputed at Jurong Shipyard, Singapore and Aker Kvaerner’s Port Klang base (Malaysia) for studying the construction of FPSO Dhirubhai-1 and subsea structures like manifolds, suction anchors, vertical connection modules, XMTs etc.

Company industry:
Oil & Gas
Job role:
Engineering

Education

University of Stavanger

August 2016

August 2016

Master's degree, MS in offshore Technology

Norway

GPA (percentage): 86%

GPA (percentage): 86%

Subjects: Semester 1 a) Offshore Field Development b) Risk analysis and Risk management c) Probability and Statistics d) Fluid Dynamics Semester 2 a) Marine Technology and Design b) Advanced Mechanics of solids c) Plastic analysis of structures d) Computational fluid dynamics e) Operations and Maintenance management Semester 3 a) Subsea Technology b) Marine Operations c) Pipeline and Risers d) Life extension of structures e) Project Management Semester 4 Thesis-Validation of Heat Transfer coefficients in pipes and deck elements without ice glazing (A grade)
View attachment

SCMS, Mahatma Gandhi University

August 2011

August 2011

Bachelor's degree, Mechanical Engineering

India

GPA (percentage): 78%

GPA (percentage): 78%

Class - 2nd Rank Mechanical Engineering
View attachment

Skills

Offshore Projects
Expert
Offshore Projects
Expert
Project Execution
Expert
Project Execution
Expert
Pipelines
Expert
Pipelines
Expert
Subsea
Expert
Subsea
Expert
Engineering
Expert
Engineering
Expert
CABLING
Expert
CABLING
Expert
CONTRACT MANAGEMENT
Expert
CONTRACT MANAGEMENT
Expert
MICROSOFT WORKS
Expert
MICROSOFT WORKS
Expert
PROCUREMENT
Expert
PROCUREMENT
Expert
PROGRESS
Expert
PROGRESS
Expert
PROJECT MANAGEMENT
Expert
PROJECT MANAGEMENT
Expert
QUALITY
Expert
QUALITY
Expert
RISK ASSESSMENT
Expert
RISK ASSESSMENT
Expert
SAFETY
Expert
SAFETY
Expert
SPECIFICATION
Expert
SPECIFICATION
Expert
Offshore Projects
Expert
Offshore Projects
Expert
Project Execution
Expert
Project Execution
Expert
Pipelines
Expert
Pipelines
Expert
Subsea
Expert
Subsea
Expert
Engineering
Expert
Engineering
Expert

Languages

English
Expert
Hindi
Expert
Norwegian
Expert

Training and Certifications

Certifications
BOSIET
Sep 2017 - Sep 2021
Show credentials
Piping Stress
Project Management

Training
Subsea Course
Subsea1
Aug 2014
Show credentials