Jisar Castillo, Civil Engineer / Scheduler

Jisar Castillo

Civil Engineer / Scheduler

Poyry Energy, Inc.

Lieu
Philippines
Éducation
Baccalauréat, Bachelor of Science in Civil Engineering
Expérience
29 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :29 years, 11 Mois

Civil Engineer / Scheduler à Poyry Energy, Inc.
  • Philippines
  • Je travaille ici depuis janvier 2020

- Managed and scheduled remaining works in North Negros Bio Power (NNBP) 25MWe Biomass Power Plant located in Manapla, Negros Occidental Philippines. Includes coordination with Poyry Construction Team and NNBP O&M.

- Designed additional structures as required by O&M (Operation & Maintenance) Team of NNBP Project including procurement coordination and construction supervision.

Senior Consultant à DGA Project Management
  • Émirats Arabes Unis - Dubaï
  • janvier 2019 à janvier 2020

Responsibilities:
• Analysed approved Baseline Schedule (both program & narrative) integrity based on contract agreement, issued for construction documents (specification & drawings), approved method statement and governing construction standards.
• Analysed existing Progress Reports (both program & narrative) integrity based on its consistency of actual dates, agreed productivity rate and manner deployment of resources.
• Analysed Delay Events by collecting all related documents to be able to determine a strong factual storyline in preparation for corresponding fragnet that shall be use in impacting approved Baseline Schedule.
• Prepare delay analysis to determine time impact on Baseline Schedule and corresponding narrative that shall be use as part of Extension of Time or EOT evaluation.
• Prepare an As-Built Schedule with documented references such correspondence, progress reports, register logs, inspection, information request, drawings, meeting minutes and all project documents.
• Supervise and lead Consultants in the process of schedule forensic analysis including method gathering information as factual basis for delay event fragnet development.
• Attend Planning and Delay Coordination meetings in behalf of the Client to discussed disposition based on factual references or evidence leading to disruption of the project.

Project Involved:
• Arabtec - Tiara Union Tower Project (Dubai)
• Arabtec - Media City Project (Dubai)
• SRG - Al Zour LNG Import Project (Kuwait)
• Cleveland Bridge - Conference & Exhibition Center at Expo 2020 (Dubai)
• Cleveland Bridge - Metrolink Station Expolink Route 2020 (Dubai)
• BAM - Museum of the Future (Dubai)

Consultant à DGA Project Management
  • Émirats Arabes Unis - Dubaï
  • mai 2018 à janvier 2019

Responsibilities:
• Analysed approved Baseline Schedule (both program & narrative) integrity based on contract agreement, issued for construction documents (specification & drawings), approved method statement and governing construction standards.
• Analysed existing Progress Reports (both program & narrative) integrity based on its consistency of actual dates, agreed productivity rate and manner deployment of resources.
• Analysed Delay Events by collecting all related documents to be able to determine a strong factual storyline in preparation for corresponding fragnet that shall be use in impacting approved Baseline Schedule.
• Prepare delay analysis to determine time impact on Baseline Schedule and corresponding narrative that shall be use as part of Extension of Time or EOT evaluation.
• Prepare an As-Built Schedule with documented references such correspondence, progress reports, register logs, inspection, information request, drawings, meeting minutes and all project documents.

Project Involved:
• AE7 - Meydan One Project (Dubai)
• A W Rostamani - Trio Building Project (Dubai)
• Arabtec - Tiara Union Tower Project (Dubai)
• Damac - Suburbia Project (Dubai)
• Arabtec - Media City Project (Dubai)
• SRG - Al Zour LNG Import Project (Kuwait)
• Arabtec - World Trade Center (Qatar)

Civil Engineer / Scheduler à Pöyry Energy, Incoporated
  • Philippines
  • juin 2016 à mai 2018

Responsibilities:
• Represent as the Owner’s Engineer and responsible for the project supervision, coordination and planning. Review and execution of work according to contract, specification and drawings.
• Assist Head Office Engineering Department for the evaluation of submitted construction drawings based on actual site condition and current status.
• Responsible for presiding QA/QC Civil Meeting in SCBP 20 MW and SNBP 25MW Biomass Power Plant Project.
• Responsible for preparing formats for progress reports and monitoring reports (Daily, Weekly and Monthly).
• Responsible for review and coordination of contractors’ schedule. Then prepare a Master Schedule to determine forecast completion date.
• Responsible for preparing Baseline Schedule for PNG Biomass Project. Including preparation of commodity list and resource loading (manhours, quantity and cost).
• Responsible for preparing Baseline Schedule for Saudi Arabia Solar Power Plant Feasibility Study.

Project Involved:
• RGEC 30MW DC Power Plant Project (Philippines)
• SBPL 2 Additional Work (Philippines)
• Saudi Arabia Solar Power Plant (Saudi Arabia)
• PNG Biomass Project (Papua New Guinea)
• SCBP 20MW Biomass Power Plant Project (Philippines)
• SNBP 25MW Biomass Power Plant Project (Philippines)
• NNBP 25MW Biomass Power Plant Project (Philippines)
• PEDC Hopper Modification Project (Philippines)

Senior Planning (Scheduler) Engineer à Consolidated Contractor Company
  • Jordanie - Amman
  • novembre 2015 à mai 2016

Responsibilities:
• Responsible for the supervision of planning and project coordination of works of Area 1 that consist of Zone A (Qasr Al Aqaba Hotel), Zone A1 (Qasr Al Aqaba On-Shore Villas), Zone E (Grand Villas) and Zone F (Al Qala’a Hotel).
• Responsible for the supervision of planning and project coordination of works at Area 2 that consist of Zone V (Westin Hotel), Zone W (Luxury Collection Hotel) and Zone X (Luxury Collection On-Shore Villas).
• Responsible for improving progress monitoring matrix for gathering detailed information and presentation in engineering, procurement and construction.
• Responsible for preparing weekly progress report and monthly progress report. Prepare Project Progress Dashboard for Management Meeting.

Project Involved:
• Remaining Works of Saraya Aqaba Project (Jordan)

Senior Planning (Scheduler) Engineer à Consolidated Contractor Company
  • Oman - Muscat
  • janvier 2010 à novembre 2015

Responsibilities:
• Responsible for the coordination of works at Fuel Farm, Utility Yard Construction, Primary Substation Construction, Runways, Taxiways, Aprons and underground utilities such as HV/MV/LV Power Cable Network, Potable Water Network, Sewage Network, Fire Fighting Network and AGL.
• Responsible for breaking down the construction activities into progress measurable elements.
• Responsible for preparing Site Instruction Impact Analysis for claiming Extension of Time in areas of responsibility.
• Involved in preparation of revised Baseline Schedule.
• Responsible for preparing progress monitoring format for site engineer and supervisor reports.
• Follow-up of deliverables (materials and drawings) and its impact on the Baseline Schedule.
• Prepare Look Ahead Schedules in order to prioritize distribution of resources and to be able to catch-up contract milestones.
• Prepare Risk Assessment for the mobility of equipment, manpower and materials around Apron area due to interface work with Airport Terminal Contractor.
• Contribute in preparing narrative summary for progress reports.
• Attend progress meeting and coordination meeting with subcontractor and with the client.
• Update Project Schedule.

Project Involved:
• Development of Muscat International Airport Project (Oman)

Planning (Scheduler) Manager à Marubeni Corporation
  • Qatar - Doha
  • avril 2007 à janvier 2010

Responsibilities:
• Managed preparation of Tender Schedule including material delivery analysis for supply of cables and accessories.
• Managed preparation of Project Cashflow, Budget Cashflow and quantity take off.
• Managed preparation of schedule analysis of supplier’s delivery commitments and revised proposal to meet project completion date.
• Managed monitoring and preparation of weekly progress reports, monthly progress reports and management meeting reports.

Project Involved:
• GTC/240/2008 Phase 9 - Substations (Qatar)
• GTC/241/2008 Phase 9 - EHV Cables (Qatar)
• GTC/142/2006 Phase 8 - Cables (Qatar)
• GTC/124/2006/C Phase 7 - Cables (Qatar)
• GTC/117/2006 220kV & 66kV Cables (Qatar)
• GTC/14/2003 Phase 5 (Qatar)
• GTC/1/2002 132kV & 66kV Cables (Qatar)

Planning (Scheduler) Engineer à Marubeni Corporation
  • Qatar - Doha
  • mai 2006 à mars 2007

Responsibilities:
• Prepared Project Execution Program that consist of Baseline Schedule, Engineering Register, S-Curves and Histograms.
• Prepared Project Cash Flow, Budget Cash Flow and quantity take off.
• Prepared schedule analysis of supplier’s delivery commitments and revised proposal to meet project completion date.
• Monitor and prepare weekly progress reports, monthly progress reports and management meeting reports.
• Assist in preparing submissions for approval such as Method Statements, Material Specifications, Technical Design and Drawings.
• Assist in evaluation of subcontractor’s billing and organizing project documentation.

Project Involved:
• GTC/124/2006/C Phase 7 - Cables (Qatar)
• GTC/117/2006 220kV & 66kV Cables (Qatar)
• GTC/14/2003 Phase 5 - Cables (Qatar)

Site Supervisor - Civil à Marubeni Corporation
  • Qatar - Doha
  • février 2005 à mai 2006

Responsibilities:
• Supervised and monitor site works of underground transmission cable installation (220kV, 132kV and 66kV) and attend inspection conducted by project consultant.
• Prepare daily progress reports, work schedule, manpower schedule and site instruction.
• Assist Engineering in design proposal to adopt site condition.
• Assist Safety Manager for imposing project Safety Rules and Regulations.

Project Involved:
• GTC/14/2003 Phase 5 - Cables (Qatar)

Site Engineer à Electrowatt - Ekono, Incorporated
  • Philippines
  • janvier 2003 à novembre 2004

Responsibilities:
• Responsible in management and administrative decision for project implementation, coordination, supervision and planning.
• Prepared Bid Documents, Technical Specification and Tender Drawings. Managed project bidding, procurement and evaluation.
• Assist in project design to attain optimum capacity at minimum cost.
• Occupational Safety and Health Officer.

Project Involved:
• Uong Bi 300MW Expansion (Vietnam)
• UPPC 133 ton/hr Coal Fired Boiler Plant (Philippines)
• NPI 2.4MW Diesel Plant Expansion (Philippines)
• FRCC Power Plant Rehabilitation (Philippines)
• MCI Exhaust Stack Reconfiguration (Philippines)

Designer & Project Management Consultant à Self Employed
  • Philippines
  • décembre 2001 à janvier 2003

Responsibilities:
• Prepared Structural Design Calculation, Specification and Construction Drawings.
• Prepared Bill of Quantities, quantity take off, budget, project proposal and schedule.
• Managed project implementation, documentation, coordination and planning.

Project Involved:
• Two Storey Residential Building (Philippines)
• Multi-Level Residential Building (Philippines)
• Bright Ways Academy School Building (Philippines)

Senior Cost Engineer à Jafrika Trading and Services
  • Philippines
  • juin 2001 à décembre 2001

Responsibilities:
• Managed project attend coordination meetings and prepare project schedule.
• Prepare project proposal, estimates and design.
• Prepared progress billing, company respondence and evaluate sub-contractor’s progress billing.

Project Involved:
• Two Storey Residential Building (Philippines)
• Condominium Unit Renovation (Philippines)
• Philip Morris Temporary Facility (Philippines)
• Gardenia Bakery Renovation (Philippines)
• Fantasy World Clubhouse (Philippines)
• NPC Ilijan Substation (Philippines)
• Shangri La Hotel Renovation (Philippines)

Cost Engineer à L&M Maxco Company, Incorporated
  • Philippines
  • septembre 1999 à mai 2001

Responsibilities:
• Reviewed project documents such as Contract of Agreement, drawings, specification and all documents related to project implementation and cost.
• Supervised extra work quantity take off, change order and tender for bidding.
• Supervised project bidding, procurement and evaluation.
• Prepared construction methodology, budget, cash flows, baseline schedule and reports.
• Supervised work implementation and quality for billing preparation and evaluation.
• Prepared correspondence and attended meeting in behalf of the company.

Project Involved:
• FEU Engineering Building Renovation (Philippines)
• NBS Commercial Center Phase 1 (Philippines)
• Shangri-La Plaza Renovation (Philippines)
• NBS Commercial Center Phase 2 (Philippines)

Junior Cost and Planning (Scheduler) Engineer à Trans-Asia, Incorporated
  • Philippines
  • novembre 1996 à août 1999

Responsibilities:
• Reviewed project documents such as Contract of Agreement, drawings, specification and all documents related to project implementation and cost.
• Responsible for extra work quantity take off and change order.
• Prepared project budget, schedules and reports.
• Supervised work implementation and quality for billing evaluation.
• Prepared correspondence and attend coordination meeting.
• Occupational Safety and Health Officer.

Project Involved:
• Raffles Corporate Center Project (Philippines)

Engineer In Charge à A De Vera Corporation
  • Philippines
  • avril 1996 à novembre 1996

Responsibilities:
• Prepared project budget, cash flow, schedules and reports.
• Supervised work implementation and quality for billing evaluation.
• Prepared correspondence and attend coordination meeting.
• Supervised project and warehouse documentation.

Project Involved:
• Pre-Cast Girder Steel Mould for Skyway Project (Philippines)
• A C Steel Mill Plant Project (Philippines)

Planning (Scheduler) Engineer à BF Corporation
  • Philippines
  • mars 1995 à novembre 1995

Responsibilities:
• Prepared Baseline Schedule, Histogram and S-Curves.
• Prepared Progress Reports and Cost Reports.
• Evaluated sub-contractors’ and suppliers’ billings.
• Prepare correspondence and construction methodology.

Project Involved:
• Robinson’s Place (Philippines)

Junior Engineer Planning (Scheduler) à BF Corporation
  • Philippines
  • janvier 1994 à février 1995

Responsibilities:
• Prepared Baseline Schedule, Histogram and S-Curves.
• Prepared Progress Reports and Cost Reports.
• Evaluated sub-contractors’ and suppliers’ billings.
• Prepare correspondence and construction methodology.

Project Involved:
• SM Southmall (Philippines)

Éducation

Baccalauréat, Bachelor of Science in Civil Engineering
  • à Perpetual Help College of Rizal (now University of Perpetual Help)
  • mars 1993

Specialties & Skills

Contract Review
Project Management
Progress Monitoring
Progress Reporting
Quantity Surveying
BUDGETING
DOCUMENTATION
PROCUREMENT
SPECIFICATION
ADMINISTRATION
BILLING
HUMAN RESOURCES
INTELIGENCIA DE NEGOCIOS

Langues

Anglais
Langue Maternelle
Filipino
Langue Maternelle
Arabe
Débutant

Adhésions

Society of Engineers in UAE
  • Affiliate
  • February 2019
International Association of Engineers
  • Member
  • February 2019

Formation et Diplômes

Construction Planning & Scheduling (Certificat)
Date de la formation:
March 2013
Project Management Professional (Certificat)
Date de la formation:
November 2013
Cost Management (Fundamentals) (Certificat)
Date de la formation:
March 2015
Value Engineering (Certificat)
Date de la formation:
November 2015