Joel Dionido, Consulting Engineer

Joel Dionido

Consulting Engineer

ITP

Location
Philippines
Education
Bachelor's degree, Mechanical Engineering
Experience
5 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :5 years, 0 Months

Consulting Engineer at ITP
  • United Arab Emirates
  • November 2013 to June 2013

Review/ Prepare mechanical data sheets, supply specifications & material requisitions.
•Engineering calculations verification & technical evaluation of Piping & Equipment Design Packages. Issue comments and mark-up drawings as part of design control team.
•Technical review of bids and issuance of comparative reports for executive approval.
•Inspections / assessment of piping & equipment’s, develop life extension methodologies, punch list issuance and supervision of rectification/re-rating works during Maintenance and Revamp project for Up-stream and Down-stream.
•Responsible for physical inspection of all piping’s / mechanical installations and ensuring that all Contractor personnel and workmanship working in accordance with approved designs, international codes, standards and procedures
•Review of P&ID's, Layouts, Isometrics & various piping related drawings and documents.
•Review and approve or disapprove method statements for inspection & test plans (

Inspector at AJEC / Fichtner Consulting Engineer
  • July 2011 to September 2011

2013
Pipeline Construction (24” dia x 43 km Transmission Gas Line) Saline Water Conversion Company-SWCC
Responsibility

•Responsible for physical inspection of all piping’s / mechanical installations and ensuring that all Contractor personnel and workmanship working in accordance with approved designs, international codes, standards and procedures
•Review of P&ID's, Layouts, Isometrics & various piping related drawings and documents.
•Review and approve or disapprove method statements for inspection & test plans (ITP)submitted by vendors and construction contractors.
•Ensured that drawing and documents used for construction are “issued for construction” and are the current revision.
•Responsible for coordinating with the various contractors to ensure that the approved Health & Safety / QA/QC procedures and the Quality Plan are implemented during inspection activities.
•Witness pre-commissioning works internal cleaning (using foam and pig) by pneumatic and gauging.
•Review hydro test, packages and updating reports, documentation and schedules.
•Site Inspection (Coating Evaluation / Holidays testing/ Blasting Profile)
•Review the piping and equipment layout design relevant to the assigned unit or area. Verify piping isometrics in the reference P&ID’s. Review the piping and bulk material take offs and bill of material.

Mechanical Engineer at Gunny Oil Services/Arabian Gulf Company
  • United Arab Emirates
  • June 2010 to January 2010

Preventive Tank Maintenance, (Surge Tank 10, 000bbl) and Installation of Equipment (Water Heater and Piping)


Responsibilities
•Conduct inspection, surveillances and monitoring of various mechanical works, piping, painting and welding as per approved inspection and test plan.
•Perform piping and equipment layout design relevant to the assigned unit and Prepare piping general arrangements and piping isometrics.
•Equipment Installation - Alignment & Elevation Survey (Vertical Vessel & Horizontal Vessel).
•Tank Closure Inspection and final line checking prior for hydro test.
•Involved in Pre-commissioning and commissioning work.
•Evaluate the tank condition for repairing or replacement as per international standard and codes practices. (API 650 and 653)
•Monitoring the Storage, Handling & Preservation of incoming materials.
•Calculate & Estimate material requirements for piping and structural work
•Ensuring that all the rules and regulations of Health, safety & Environment Policy are included in all the maintenance plans.
•Ensure that all equipment and materials delivered are in correct quantities and in good condition. Ensure engineering designs and equipment selections are consistent with project technical requirements and estimate.

QC Engineer at Kato Metal Corporation
  • Philippines
  • May 2000 to January 2005

Create a full set of working drawings prior for fabrication works.
•Work with Engineers regarding details drawing, design, drafting standards and design documentation.
•Prepare shop drawing with full details prior for fabrication.
•Check and monitor all finished product at the fabrication shop and evaluate if its accordance to the approved drawing.

Site Engineer at Makco Uk. Ltd / Harouge Oil Operation
  • July 2007 to

Preventive Tank Maintenance and Piping Fabrication / Installation (Settling / Surge Tank-5000bbl)

Duties and Responsibilities (Turnkey Project)
•Involved in Mechanical / Piping Works, Costing & Estimation/Planning.
•Supervised the Storage Tank Lifting, Maintenance, replacement of plates, cleaning and repair.
•Equipment Verification and Visual Inspection prior for repairing or replacement
•Provides comprehensive engineering, inspection, rehabilitation, repair, repainting and preventative maintenance services for the storage tanks.
•Responsible to analyze the drawing, supervise the activity from fabrication to installation, planning the duration of work, distributing and managing the work and ensure safety measure
•Assist the AutoCAD Operator, preparation of isometrics and supporting details for all construction drawings.
•Monitoring the site activity for tank repair (shell or bottom plate replacement.)
•Prepared test packages and updating reports, documentation, schedules, take-off timetable, and gave presentations.
•Conduct inspection, surveillances and monitoring of various mechanical works, piping, painting and welding as per approved inspection and test plan.
•Final Inspection and line checking for mechanical completion acceptance.

Site Engineer at Al Jalhami Contracting Est. / Kahfji Joint Operation
  • July 2005 to

Monitoring of Pipeline Construction, modification and upgrading. Storage Tank Lifting, Maintenance, replacement of Plates.
•In charged for Overhauling of Static Equipment & Repair of Tubes and Re-tubing Blinding/De-Blinding Piping Modifications Overhauling & Calibration of Valves.
•In charge of calibration of valve, pressure and temperature gauges, and other equipment.
•Supervise the installation of static and rotating equipment..
•Witnessing the hydro testing and commissioning works.
•Discuss with Operations, Maintenance and Engineering departments to determine their shutdown work scope. Ensures that all preventive and maintenance, inspection, recertification, repair, overhaul and modifications’ requirements are included in scope of work.
•Have a technical knowledge tank evaluation for repairing or replacement as per international standard and codes practices. (API 650 and 653)
•Experience to carry out site supervision and inspection for site fabrication, installation work such as plate or pipe work.
•Monitoring the site activity for tank repair (shell or bottom plate replacement

Inspector at Petrochemical Co
  • United Arab Emirates
  • to

Education

Bachelor's degree, Mechanical Engineering
  • at Technological Institute of the Philippines
  • January 2000

Registered Mechanical Engineer

Specialties & Skills

DOCUMENTATION
GRAPHIC DESIGN
MECHANICAL
MICROSOFT WORKS
PAINTING
SUPERVISORY SKILLS