joey torres, Civil Engineer

joey torres

Civil Engineer

Solb Steel Company

Location
Philippines
Experience
10 years, 7 Months

Share My Profile

Block User


Work Experience

Total years of experience :10 years, 7 Months

Civil Engineer at Solb Steel Company
  • Saudi Arabia
  • July 2013 to December 2013

Client: Solb Steel Company
Jizan Kingdom of Saudi Arabia
Job Title: Civil Engineer
Period: July 30, 2013 to December 30, 2013


• Ensure that all construction activities are systematically
Controlled and executed so that only conforming
Materials and equipments approved method and
Procedure are used for construction.
• Prepared activity reports, manpower and equipment
Utilization.
• Responsible for the quality of work.
• Supervised the construction of civil works such as foundation and alignment of elevation


Company: STX Heavy Industries
Project: Riyadh Refinery Upgrading
Drainage System Project

Civil Engineer/Surveyor at Saudi Aramco
  • United Arab Emirates
  • December 2012 to July 2013

Client: Saudi Aramco
SAP Number: 70010817
Job Title: Civil Engineer/Surveyor
Period: December 30, 2012 to July 29, 2013



• Monitor project and initiate action to ensure project compormance.
• Supervised the construction of Civil works such as foundation and alignment of elevation.
• Responsible for the quality of works.
• Monitor/Supervised construction activities to ensure that the works progresses in a manner that will result in compliance with the project specification and approved drawings and that the work is completed within specified.
Al-Awadh Company - is a major contractor of Saudi Aramco Oil Company, with 24 years industrial experienced. A Saudi owned company with expertise in Infastructure and mechanical works.


Company: Al-Awadh Company
For Trading and Contracting
Abqaiq, Kingdom of Saudi Arabia
Client: Saudi Aramco
Project: Install Cathodic Protection and Steel
Overhead Power line for 6 Wells @
UTMN Area.

Civil Engineer/Surveyor at Saudi Aramco
  • United Arab Emirates
  • December 2012 to July 2013

Client: Saudi Aramco
SAP Number: 70010817
Job Title: Civil Engineer/Surveyor
Period: December 30, 2012 to July 29, 2013



• Monitor project and initiate action to ensure project compormance.
• Supervised the construction of Civil works such as foundation and alignment of elevation.
• Responsible for the quality of works.
• Monitor/Supervised construction activities to ensure that the works progresses in a manner that will result in compliance with the project specification and approved drawings and that the work is completed within specified.
Al-Awadh Company - is a major contractor of Saudi Aramco Oil Company, with 24 years industrial experienced. A Saudi owned company with expertise in Infastructure and mechanical works.


Company: Al-Awadh Company
For Trading and Contracting
Abqaiq, Kingdom of Saudi Arabia
Client: Saudi Aramco
Project: Install Cathodic Protection and Steel
Overhead Power line for 6 Wells @
UTMN Area.

QA/QC Civil inspector at Saudi Aramco
  • United Arab Emirates
  • December 2009 to September 2010

Client: Saudi Aramco
Job Title: QA/QC Civil inspector
Period: December 15, 2009 to September 2, 2010



• Monitoring the quality of works in every activity on the jobsite to ensure that all required standard and specification.
• Always maintain the quality if materials in comformance with Saudi Aramco.
• Prepared RFI and checklist prior to request inspection within 24 hours.
• Monitor/Witness concreting works to ensure that concrete is placed in accordance with concreting procedure.


Company: Al-Awadh Company
For Trading and contracting
Abqaiq, kingdom of Saudi Arabia

QA/QC Civil inspector, surveyor at Saudi Aramco
  • United Arab Emirates
  • January 2008 to October 2009

Client: Saudi Aramco
Project: Khurais Upstream facilities north and south
Job Title: QA/QC Civil inspector, surveyor
Period: January 2, 2008 to October 27, 2009



• Monitoring the quality of works in every activity on the jobsite to ensure the all required standard and specification.
• Prepared the RFI and checklist prior to request inspection within 24 hours.
• Always maintain the quality of materials in comformance with Saudi Aramco.
• Monitor/Witness concreting works to ensure that cone is placed in accordance with concreting procedure.
• Survey the location of the wells for the preparation of access road.
• Lay-out and mark all of the proposed foundation of the poles before concreting.


Company: Department of Public works and

QA/QC Civil Engineer at District Engineering Office Nueva Ecija
  • India
  • August 2003 to December 2006

Highways (DPWH) Nueva Ecija 1st
District Engineering Office Nueva Ecija,
Philippines
Job Title: QA/QC Civil Engineer
Period: August 2003 to December 2006

• Supervise the construction crew during start-up and on-going works to ensure that the works were in accordance with the drawings and specifications.
• Conduct field inspection on construction activities in compliance with plans, specification and standards.
• Recommends remedial actions to resolve problems to meet standard qualities.

Project Engineer at Nueva Ecija Electric Coop
  • June 2002 to July 2003

Company: Nueva Ecija Electric Coop.11 (NEECO)
Talavera, Nueva Ecija Philippines
Job Title: Project Engineer
Period: June 2002 to July 2003

• Responsible in the project construction which include: Excavation of Trenches, Laying of PVC pipes and conduits, construction of steel poles and erection of poles.

Project Engineer, Surveyor at Department of Public Works and Highways
  • India
  • January 1999 to March 2001

Company: Department of Public Works and Highways
(DPWH) Nueva Ecija 1st District
Engineering office Nueva Ecija, Philippines
Job title: Project Engineer, Surveyor
Period: January 1999 to March 2001

• Monitoring and supervised all activities adherence to plan specification and standards.
• Responsible for the planning of all works and activities in the project.
• Monitoring project activities and makes corrective actions to the problems in the project.

Specialties & Skills

Languages

English
Beginner
Tagalog
Beginner