joseph jaucian, Project Engineer

joseph jaucian

Project Engineer

Qatar Design Consortium

Lieu
Qatar
Éducation
Baccalauréat, Civil Engineering
Expérience
18 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 5 Mois

Project Engineer à Qatar Design Consortium
  • France
  • avril 2007 à juin 2015

Design Construction and Completion and Maintenance of GWC AL Wukair Logistic Park Phase 1( Dry Ventilated Warehouses; Air Conditioned Warehouses; Open Parking, Peripheral Boundary walls Roads; complete including Wet and Dry Utilities;Roads; Substations
Client: Gulf Warehouse Company
Project Cost: Qar.449, 195, 574 ( Ongoing)


Adding and Modification in Existing Aluminum Extrusion Factory(QALEX)- PEB Warehouses, Substation, Fire Fighting Tank, Including Wet and Dry Utilities, Hard landscaping.
Client: Qatar Aluminum Extrusion Company
Project Cost: Qr. 15 Million

AL Jazeera Digital Division Building (PEB Office, Substation ;complete sincluding Wet and Dry Utilities;Hard landscaping
Client : AL Jazeera Media Network
Project Cost: Qr. 17.9 Million

Logistic Hub In Bu Sulba- (PEB Warehouses;6 Substations, Roads and Hardlandscape.; labor accommodations STP underground tanks; complete including Wet and Dry Utilities;Roads;
Client: Gulf Warehousing Company(GWC)
Project Cost: Qr.685 Million

Student Housing Project complete including Wet and Dry Utilities-Qatar University (LEED PROJECT) Site Development 6 Buildings. Male Hostel & 6 bldgs. Female Hostels, 6 nos. Substation Domestic and Firewater tanks at basement, 10 Apartments, 1 Central Service Unit plus Cooling towers (district cooling), 1 Club House, 1 External Underground Domestic, 1 Irrigation and 1 Firewater tanks, ,; 6nos.Guard Houses, Peripheral Boundary walls, Hard landscaping, Underground Diesel and LPG tanks Concrete Compartments, Carpark Shades, Street lightings, , Inspection Chambers, Bus Stop Waiting Shades. Roads
Client: QATAR UNIVERSITY
Project Cost: Qar. 833 Million




Barwa Village @ Wakrah - Township Project complete including Wet and dry Utilities composed of (18Nos. G+2 L-Shape Mixed use building), Admin Bldg;2 nos. Schools, Plaza, Club house, Mosque, Wet and Dry utilities and Ancilliary buildings. STP; Substations; Roads,
Client: Barwa Real Estate
Project Cost: Qar. 1.5 Billion


Additional Electromechanical Infrastructure Chillers plus Cooling tower including Wet and Dry Utilities complete piping systems of Chilled Water line along with additional HDPE potable water line with Concrete Valve Chambers @ CSU 3 Main campus-Qatar University which supply to College of Law, College of Pharmacy, College of Education and Central Service Unit no.4 and Construction of TSE tank at CSU 2;
Client : Qatar University
Project Cost: Qar. 24.83 Million

B+G+2+ Roof & Upper Roof (Proposed Office Building at Almaseelah)Fire fighting water tanks, Wet and dry utilities, Hardlandscaping; Substation
Client: Mr Homaid Al Madfa
Project Cost: Qr.11 million

B + G + 2 Bahri Villa South 41( Pearl Qatar)Bored Pile foundation, Substations; Valve Chambers, wet and dry utilities, Swimming Pool
Client: Grand Business Services
Project Cost: Qr. 12.33 million

Construction, Completion & Maintenance of Proposed Secondary Substation for Mannai Corporation at Industrial Area complete including Wet and Dry utilities
Client : Mannai Corporation
Project Cost: Qr. 5.1 million



Renovation of Six Second Grade Clubs & Doha Stadium
Client: Qatar Olympic Committee
Project Cost: Qr. 89.9 Million

10 villa compound at Muaither fo SHK.Mariam Ahmad Al Maadid with swimingpool, holding tank, road gullies Soakways, Road Gullies(Wet and Dry Utilities
Client: Al Jassim Group
Project Cost: Qr.10 Million

IDCC COMPLEX @ Abu Hamour with 7 Buildings and Ancilliary Buildings plus Substation, Drainages, Roads and Wet and dry Utilities;Roads
Client: Inter Denominational Christian Church
Project Cost: Qrs. 21. 7 Million

Maritime Coastal Station @ Al Lusail
Client: Qatar Telecom
Project Cost: Qrs. 11. 943 Million

10 Villa Compound @ Old Airport
Client: Shk. Hamad Al Attiyah
Project Cost: Qrs. 10 Million

Section Engineer à Obayashi Corporation
  • Philippines
  • juin 2005 à avril 2007

Project: Zone A package 1, Subic - Clark & Tarlac Expressway Project
Philippines 4 LANES
Client: BCDA - Bases Conversion Development Authority
Consultant: PKN Joint Ventures (PCI, Katahira and Nippon Koei)
Scope of Work: Roads 50.5 km;Intercharge;Underpass;Bridges, Reinforced Concrete Box Culvert(RCBC);Reinforced Concrete Pipe Culverts(RCPC) complete including Wet and Dry Utilities
Total Project Cost: Php.34.957 Billion pesos


Duties & Responsibilities:
Attend coordination meeting together with sub-contractors with regards to daily target schedule.
Discuss to management any problems encountered and any right of way issues
Arrange Manpower and Equipments.
Review subcontractors submittals and Billing and claims
Supervise daily Construction operation (Construction of underpass, RCBC Common soil, Embankment, Slope protection, RCPC, Bridge pavement; Wet and Dry Utilities
Prepare work request per item of work prior for inspection of the Consultant.
Coordinate with the batching plant prior for concreting.
Checking of formworks and rebars prior for concreting.
Conduct slump test at site prior for concrete pouring.
Conduct quality control at site and prepare checklist each item of work.
Conduct Progressive snagging list.

Project Engineer à BC Construction
  • janvier 2004 à mars 2005

Project: Residential Buildings
Duties & Responsibilities:
Arrange Payroll of workers
Coordination to Municipality regarding Utilities tie in and existing utilities
Arrange Manpower and Equipments
Supervise daily construction operation.
Prepare estimate based on approved shop drawings.
Checking of formworks and rebars prior for concrete pouring.
Conduct survey works (Elevation Checking)

Project Engineer à SDR ENGINEERING ENTERPRISE
  • novembre 2001 à novembre 2003

Project: Pier 16 North Harbor
Philippines
Client: Philippine Port Authority
Scope of works: Construction of Reinforced Rail for Gantry Crane, open canal with steel grating, Asphalting & Building Renovations; paving blocks installation.


Duties & Responsibilities:

Attend Progress and Coordination meetings
Close coordination with Philippine Port Authority with regards to traffic management
Supervise daily construction operation.
Review contractors submittals;Monthly Valuation
Arrange Manpower and equipements
Joint inspection for verification of layout/Survey/Scanning of underground services
Prepare monthly billing, estimates.
Prepare work request prior to construction per item of work.
Preparation & monitor manpower, equipment and materials.
Checking of formworks and rebars prior for concrete pouring.
Conduct slump test at site prior for concreting.
Conduct quality control at site and prepare checklist each item of work.
Prepare daily accomplishment report.

Project Engineer à Tutto Asia Philippines
  • mars 1999 à octobre 2001

Project: RCBC tower; PBCom Tower.Rockwell (Tiles and Stone claddings)

Duties and Responsibilities:
Attend Coordination Meeting/Progress meeting
Arrange Material and Shop drawing for submittals
Supervision daily construction operation and arrange Survey(Setting out)
Coordinate to Main Contractor and secure permit to work
Arrange manpower and equipments
Prepare Request for inspection
Prepare Daily Progress Report
Review Monthly Valuations and claims

Éducation

Baccalauréat, Civil Engineering
  • à Aquinas University of Legazpi
  • septembre 2021

Qatar MMUP-UPDA Registration No.

Baccalauréat, Civil Engineering
  • à Aquinas University of Legazpi
  • janvier 1998

in

Specialties & Skills

BILLING
CUSTOMER RELATIONS
QUALITY CONTROL
BRIDGES
CONSULTING
CONVERSION
UTILITIES
GRAPHIC DESIGN

Langues

Arabe
Expert
Anglais
Expert
Tagalog
Expert