QA/QC, Welding Inspector
Petroleum, Chemicals and Mining Company Limited
Total years of experience :14 years, 5 Months
Attend and execute all Requests for inspection forms and provide comments and necessary signed of according to client’s approval.
Monitor all activities of mechanical construction division if the works are done well in procedure and in approved mechanical works specifications with accordance to quality and accuracy of work.
Monitor all materials receiving, check and inspection.
Prepare inspection reports, daily reports and other relevant documents.
Monitor all on going and incoming FRP fit-up and installation works in lay down or at work site area.
Responsible for obtaining clients approval of all FRP piping and mechanical works and doing the inspection as per approved ITP’s and design drawings.
Provides technical strategies and good ideas on some FRP piping and mechanical works for the lease of job repetitions and avoid necessary failures and lessens rejection.
Proper coordination’s with the client in performing joint test, hardness test and some necessary testing needed in FRP piping and mechanical works as per approved ITP and specifications.
Attend and execute all Requests for inspection forms and provide comments and necessary signed of according to client’s approval.
Monitor all activities of mechanical construction division if the works are done well in procedure and in approved mechanical works specifications with accordance to quality and accuracy of work.
Monitor all materials receiving, check and inspection.
Prepare inspection reports, daily reports and other relevant documents.
Monitor all on going and incoming FRP fit-up and installation works in lay down or at work site area.
Responsible for obtaining clients approval of all FRP piping and mechanical works and doing the inspection as per approved ITP’s and design drawings.
Provides technical strategies and good ideas on some FRP piping and mechanical works for the lease of job repetitions and avoid necessary failures and lessens rejection.
Proper coordination’s with the client in performing joint test, hardness test and some necessary testing needed in FRP piping and mechanical works as per approved ITP and specifications.
Coordination for welding and piping. Illustrates weld mapping of designated welding joints. Check and inspection of welding joints necessary for approval of the main contractor to undergone NDT TEST and Inspection. Summarized daily welding reports and welding Inspection requirements for NDT test and Inspection. Update both daily welding Status reports and daily NDT Status reports needed in the project.
Detailed Job Description:
•Ensure that all the QA / QC activities comply with the requirements of the Quality Procedures and Client specified requirements.
•Attend to all RFI (Request for Inspection) forms from Contractors and provide comments as necessary and signed off accordingly.
•Monitor all activities to see if all works are done according method and specification with particular attention to the construction program target schedule.
•Coordinating with clients’ inspector as per the schedule time of inspection and RFI processing.
•Preparing inspection and NDT reports and other relevant documents.
•Attending the NDT test according to approved ITP and verifies the inspection reports and validating the results.
•Monitoring of all the on-going welding works assigned to ensure that quality of works meets the required Welding/ procedure and applicable standard.
•Responsible for obtaining client approval of all works carried out and inspected based on the approved Inspection and Test Plan, Design and Drawings.
•Liaise and communicate with Contractors QC Inspectors and Engineers relating to changes/revisions on drawings and ensure that these are implemented on site.
•Provide technical and statutory advices on some of the piping/welding works.
•Monitoring of all the on-going activities of Piping fit-ups and updated welding report to ensure that quality of Works meets the required procedure.
•Conduct material inspection according to specification and approved materials by the client.
, Malaysia
project
Prepare inspection Test plan (ITP) before start the project & checklist for approval of the client’s requirements.
•Review plan drawings in accordance with the specification and standards.
•Coordinates with the clients QA/QC representative & inspector for any Job Resolution.
•Monitoring the site implementation such the no weld rejection target or Zero defect
•Inspection of piping materials and fittings as per approved isometric drawings and WPS.
•Control and maintain QA/QC related documents.
•Responsible for updating the Isometric drawing to as built condition as the work is in progress.
•Assuring that the environment, health and safety procedures are being followed.
•Inspection of Material According to Specification and Approved Material.
•Witness the preparation and execution of Hydrostatic test, Nitrogen filled Pneumatic test and Air Leak test as per client’s procedure.
/PP Project
of Project : Mechanical / Piping, FRP Piping
Project Name : SEA WATER COOLING SUPPLY AND RETURN WORKS PHASE -1
Scope of Work:
Performed a routine inspection of materials as per MTC which meets the quality standard and as per material specification procedure. Inspection of detailed FRP piping works ether lamination job and FRP pipe coupling joint procedure specifications. Make sure that the piping and accessories meet the quality standards and approved Specifications.Illustrates and interprets mechanical and FRP piping drawing necessary needed as requirements in the SEA WATER COOLING SUPPLY AND RETURN WORKS PHASE 1 and other related jobs in mechanical QA/QC.
Detailed Job Description:
•Attend and execute all Requests for inspection forms and provide comments and necessary signed of according to client’s approval.
•Monitor all activities of mechanical construction division if the works are done well in procedure and in approved mechanical works specifications with accordance to quality and accuracy of work.
•Monitor all materials receiving, check and inspection.
•Prepare inspection reports, daily reports and other relevant documents.
•Monitor all on going and incoming FRP fit-up and installation works in lay down or at work site area.
•Responsible for obtaining clients approval of all FRP piping and mechanical works and doing the inspection as per approved ITP’s and design drawings.
•Provides technical strategies and good ideas on some FRP piping and mechanical works for the lease of job repetitions and avoid necessary failures and lessens rejection.
•Proper coordination’s with the client in performing joint test, hardness test and some necessary testing needed in FRP piping and mechanical works as per approved ITP and specifications.
NPCC FABRICATION Yard Area
Scope of Work / Specific Duties and Responsibilities:
• Preparation of Material Test Certificate (MTC).
• Preview and interpret pressure vessels isometric drawings
• Responsible for handling the pressure vessel’s drawings Latest revisions.
• Doing the onsite pressure vessel inspection which includes vessel attachments vessel Heads LAYOUT and inspection vessel holes Layout Inspection.
• Check the proper procedure upon the fit-up and handover to full welding
• Check and monitor NDT Test and Inspection of the pressure vessel
• Attend actual onsite NDT Test and inspection.
• Inspection and carefully check the vessels welding parameters and Specification as per clients Procedure.
MECHANICAL
ENGINEERING RELATED POSITION
SPECIALIZATIONS : Responsible for obtaining client approval of all works
carried out and inspected based on the approved Inspection and Test Plan.
Design and Drawings.
Ensure that all the QA/QC activities comply with the requirements of the Quality Procedures and client specified requirements.
Prepare for approval prior to implementation of the Quality Control Work Procedures and Inspections and Test Plans.
Attend and execute all Request for Inspection forms and provide comments and necessary signed of according to client’s approval.
Performed surveillance/audits and inspections of ongoing construction projects.
Ensure effective implementation of non-conformance, corrective actions and preventive actions.
Responsible for the Inspection of Mechanical equipments such as pumps, compressors, exchangers, evaporators and boilers.
Conduct material Inspection according to
Specifications and approved materials by the client.
Party Institution for testing and calibrations.
Geographical Areas of
SASREF Mechanical SHUTDOWN
Scope of Work / Specific Duties and Responsibilities:
Illustrate mechanical and piping drawings. Check and inspection of piping joints welding joints as well as their materials as per WPS. Updates piping and welding reports required to undergone RT and other NDE TEST. Monitors PWHT for alloy pipes as per WPS. Performing NDE test and inspection needed as a clients requirements. Check and inspection of piping parameters, straightness as per tolerance. Visual inspections of piping weld joints before undergone NDT test and inspection.
Scope of Work / Specific Duties and Responsibilities:
• Preparation and check Material Test Certificate (MTC).prepare and check the approved Inspection Test Plan (ITP).
• Review the approved WPS .Piping and Welding parameters. Illustrate the isometric drawings as per the projects design and revisions.
• Responsible for handling the Isometric drawings Latest revisions.
• Doing the onsite piping and production weld inspection.
• Monitoring the welder’s site implementation and preparing progress report.
• Doing visual inspection of welders production weld as per RFI.
• Monitor and inspection the on going activities on site.
• Monitors NDE daily status reports and respective repairs and weld rejections.
• Updates welders skills capabilities on work progress and attend welders WQT
Test
• Witness hydrostatic test, Pneumatic test and Air leak test as per WPS and clients Procedure
Sakhalin II LNG, OET Project
Scope of Work / Specific Duties and Responsibilities:
• Preparation and check Material Test Certificate (MTC).prepare and check the approved Inspection Test Plan (ITP).
• Review the approved WPS .Piping and Welding parameters. Illustrate the isometric drawings as per the projects design and revisions.
• Responsible for handling the Isometric drawings Latest revisions.
• Doing the onsite piping and production weld inspection.
• Monitoring the welder’s checklist and preparing progress report.
• Doing visual inspection of welders production weld as per RFI.
• Monitor and inspection of on-going activities on site.
• Monitors NDE daily status reports and respective repairs and weld rejections.
• Updates welders skills capabilities on work progress and attend welders WQT Test
• Monitors PWHT, MPI, PMI, RT, PT HARDNESS TEST.as per clients requirements Procedure and Specification.
NC41 Onshore Project Mellitah Plant Libya
Scope of Work / Specific Duties and Responsibilities:
• Prepare the Material Test Certificate(
Mechanical Engineering Technology
Finished On the Job Training with certificate of Trainings nd seminars of Mechanical Engineering Technology and Maintenance, Quality Assurance and Quality Control.
courses: PNOC Dockyard and Eng’g. Corp. On the Job Training
Graduated in High School, with Diploma in Secondary Education
Graduated in Elementary Education With Diploma of Primary Education.