Project في Supreme Education Council
  • قطر
  • مايو 2016 إلى أبريل 2016

Day to Day site work progress tracking required for monthly billing for HVAC, Plumbing, Drainage, and Firefighting.
•Project Cost Forecasting Cost & monitor, recorded monthly cost expenditure use in the project
•Allocate Project man-hours; coordinate to subcontractor for baseline man-hour of the project.
• Control BOQ and coordinate contracts for new items and unit rates.
•Review site level 4 construction schedule
•Detailed quantity take-off, based on the shop drawings intended for estimation.
•Prepare report for variation of work, changed request (CR) from contractor.
•Prepare Material Transmittal & submittal to get approval from consultant
•Review and research material specs and standard prior for procurement.
•Attend weekly progress meeting
•Estimate, monitor manpower, budget for remaining works
•Monitor daily manpower supply to site, and achieved man-hours.
•Review and report the progress based on the estimated budgeted quantities and the installed quantities as per the specification and contract.
•Review and verify change requests (Variation) from consultant based on the contract.
•Review and verify contractor’s (Supplier) claims in accordance with agreed and specified approved contract and agreement for the installation procedure.
•Verify and report value of works done for the progress payments.
•Verify and prepare final as-built quantity and final report.
•Prepare and update procedure and administer contract reviews and negotiations of changes.

Senior Project Control Engineer في RASGAS Company LTD
  • قطر - الدوحة
  • سبتمبر 2007 إلى أبريل 2013

• Preparation of project Status report for weekly meeting to contractor and monthly meeting to project
Management services department.
• Preparation, monitor and acknowledge Deliverables of the project.
• Prepare Brown field tool kit of the projects.
• Initiate meetings involve the project management of the projects.
• Monitor and coordinate Budget from Gate 2 through Gate 4 final estimate budget and approved AFE Funding.
• Update SAP System for the commitment (ZI60) and actual Company cost and Contractor cost (CJI3).
• Supply chain management to enable timely input of cost information to the project.
• Monitor labor, Plant and other cost allocations and report cost deviations to Budget.
• Identifying specific changes and cost forecast.
• Cost value reconciliations and cost forecasts.
• Preparation of Cost Forecast (EAC) Estimated at completion & (ETC) estimated to complete expenditure cost profile plan, EPCM, EPC and PCM contract.
• Coordinate to Project Engineers for planning the activities, approval o contract strategy and distribution of expenditure cost budget.
• Measure performance of contractor in regards with Progress.
• Evaluate (VOWD) value of work done of Contractor.
• Coordinate to Project Engineers for the potential change order of Project, communicate and manpower histogram, create curve cost baseline and forecasting.
• Validation of Contractor (VOWD), weekly and monthly.
• Close monitor and Coordination to planning and estimation group for any changes and update of project budget and progress.
• Review the activities for schedule delayed or risk.
• Close monitoring of the changes of Estimation Budget and approval of AFE, supplementary fund process to finance, prepare MCR for funding request of Project.
• Attend meeting to contractor and arrange meeting with Project Engineers regarding cost expenditure profile baseline.
• Project assignment common Off Plot Pipeline, AKG & Offsite Area, Structural and Concrete Bridges, Earthworks for Site Development (ESW).
• Preparation of estimated cost for Shutdown (Brownfield Area) operation.

Senior EngineerQuantity Surveyor في RASGAS Company LTD
  • قطر - الدوحة
  • سبتمبر 2007 إلى يناير 2013

• Reporting to the Consortium Commercial Manager and working with the Project Management responsible for the day to day management of :
• Day to day work site work inspection of subcontractor works progress.
• Approved and sign RFI , Brown field permit to work sign off,
• Re-measurement of any work which is based on provisional quantities upon receipt of the Mechanical Chiller Piping, Sprinkler, Plumbing m steel structure support, Electrical, Instrumentation, Civil infrastructure, MEP Design Drawings approved for construction.
• Verification of the certified works for monthly construction progress reports and payments.
• Drawing take-off and pricing base in the given unit rate and latest AFC Drawings.
• Evaluating Subcontractor/Supplier change requests and early warnings, working closely with the Project Management and Engineering Team and visiting the Sites along the route when appropriate.
• Participating in the preparation of Subcontractor/Supplier evaluation and reviewing progress of the base scope and variation works on Site with the Project Team.
• Supply chain management - includes preparing early warning notices and quotations in response to Purchaser’s instructions and pricing contract change request for review prior to submission to the client.
• Identifying specific changes and risks.
• Cost value reconciliations and cost forecast.
• Participation in the preparation of Application for Payment.
• Assisting the Consortium Commercial Manager by providing accurate actual cost information and budget cost allocation.
• Prepare claims for submission.
• Assessing and defending claims from Subcontractor / Supplier.
• Management of Subcontractor accounts from tender to final account.
• Administration of the Contract - Assessing risk opportunity and contributing to the provision of commercial Advise to the Team.
• Attend client meetings with regards to projects commercial performance.
• Undertaking and other duties necessary to deliver the project.
• It may be necessary occasionally to undertake Site visits.

Scheduling/Planning

• Review contractor level 4 schedule activities versus actual site progress.
• Initiates PMT construction meeting for any update of the level 3 & 4 schedules.
• Preparations of 2 months look ahead activities base in Primavera P6.
• Attend Construction schedule for potential work delayed and agreement for solution.
• Preparation of schedule analyzer.

Mechanical Quantity Surveyor في CMS&A Chiyoda Mitsue Snamprogetti Joint venture
  • قطر - الدوحة
  • ديسمبر 2004 إلى سبتمبر 2007

• Verification of the certified works for monthly construction progress reports and payments.
• Estimate base in schedule of rate and evaluate subcontractor quotation.
• Re-measurement of any work which is based on provisional quantities upon receipt of the Mechanical piping, Equipment Steel Structure, Electrical, Instrumentation, Civil, and BOQ claims from Sub-Contractor.
• Develop BOQ from Drawings, Drawing Take-off and pricing based in the Sub-Contractor Unit rate, comparison from the Contractor Quotation. Measurement of quantities from IFC drawings and agreement of change orders quotation from Sub contractor extra works.
• Site tracking, develop mark-up drawings as per site progress, verified IFC drawings versus as built drawings to monitor the variation of claims.
• Coordinate construction group for any update Level 4 construction schedule.
• Carried out material Take-off from the Drawings to determine estimated budget cost for additional works. Determine critical activity, Activities achieved completed and on-going base on the level 4 schedule.

Mechanical Quantity Surveyor في CMS & A
  • ديسمبر 2004 إلى سبتمبر 2007

Verification of the certified works for monthly construction progress reports & payments.
•Re-measurement of quantities from drawings.
•Develop BOQ from drawings, drawing quantities detailed take-off and pricing based in the subcontractor approved schedule of rates, comparison from the company cost budget.
•Site progress tracking and mark-up in the drawings for Piping, Steel Structure, equipment & insulation.
•Assist procurement group for the clarity of standard and specification of material prior to procurement.
•Carried out material take-off from the AFC drawings to determine estimated budget cost for additional works and change order process.
•Determine critical activities, activities achieved completed and on-going base on the level 3 schedule.
•Established and implements methods for determining activity duration within assigned disciplines or specialties.
•Review the accuracy of subcontractor’s records of progress and resources. Monitoring progress on weekly, monthly basis against target baseline or forecast schedule and generate reports that will serve as management internal support information or as client management requirement.

Senior Engineer في RASGAS Company LTD
  • قطر
  • سبتمبر 2007 إلى أبريل 2007

8 years and 4 months)
Reporting to commercial manager and working with the project management responsible for day to day management of:
•Re-measurement of Mechanical works which is based on provisional BOQ upon receipt of the monthly progress for Piping, Steel Structure, Equipment, Painting and Insulation with the reference of AFC drawings.
•Verification of certified works for monthly construction progress reports & payments.
•Evaluate, monitor, and coordinate, filling, negotiation to contractor & management reports for site change order, variation from project designed.
•Preparation of detailed quantities take-off from drawings and pricing based in the approved schedule of rate.
•Preparation of cost estimation for contractor cost clarity.
•Site progress tracking
•BOQ reconciliation to contractor and sign-off.
•Initiate PMT construction meeting for the update of level 3 and level 4 schedules.
•Preparation of two months looks ahead schedule based in P6 software.
•Attend construction progress meeting with contractor and subcontractor for ongoing progress update.
•Preparation of project control report (PCR), for weekly meeting to contractor and monthly meeting to project control management.
•Monitor and coordinate project budget, final estimate and approved AFE funding from Gate 2 through Gate 4 construction.
•Develop project dashboard for management report and update.
•Update SAP system for project budget commitment from contractor and actual project cost including contractor cost.
•Monitor labor cost allocation and cost deviation to budget.
•Established project cost forecast ( EAC) estimated @completion and estimated to complete the project ( ETC)
•Develop expenditure cost profile (Graphing) and distribution profile.
•Close coordinate to project engineers, planners for the priorities, contract strategy for expenditure distribution purposes and approval.
•Evaluate VOWD of contractors.
•Attend project engineers meetings for priorities and contract strategy of the project.

Project Quantity Surveyor في Snamprogetti
  • الإمارات العربية المتحدة
  • يونيو 2002 إلى أغسطس 2003

Assist construction group for monitoring of site progress in Piping, Pipe supports, Steel Structure, UG piping, Equipment, Painting, Insulation and fire Proofing.
•Review; evaluate change order estimation, quotation from sub-contractor.
•Sicon user for updating project BOQ and schedule of rates.
•Assist construction for Test packages preparation of documents, drawings, material availability in site punch list items.
•Construction reports preparation.

Quantity Surveyor في Abdullah H. Al-Shuwayer Trading and Contracting Company
  • يوليو 1998 إلى أغسطس 1999

Made site inspection on designated project and made sure that they follow plans and quality standard as specified in the contract.
•Preparation of bill of quantities for the project, tracking site progress, and report to planning and manager.
•Prepare monthly invoicing to be submitted to main contractor.
•Prepare Fabrication Material take-off and request to client for fabrication.
•Punch list for defective construction and hand it to the site engineer’s in-charge for implementation and commissioning.
•Checked Construction Plans and made sure that the design is sound and followed the scope of works and industry code to be followed.

Construction Engineer في EEI Corporation
  • الفلبين
  • أبريل 1992 إلى فبراير 1996

Supervised construction installation of Piping, Equipment & Steel Structure of 2500 Megawatt coal fired Boiler ( Pagbilao Lucena City Philippines) ( SOIBA Jeddah K.S.A Coal fired Boiler )
•Day to day overseen the installation of Mechanical Works.
•Initiate site meetings for worker including Foreman and Site Safety.
•Give training to all workers, coordinate potential unsafe activities during installation and erection.
•Coordinate MHI, Bechtel for work priorities.
•Insure workmanship should be following the project standard and specification.

Construction Engineer في GAMA Power System Engineering and Contracting, Inc
  • أكتوبر 2000 إلى

1 year 4 month)
•Coordination, meetings to main contractor for level 4 schedule, AFC drawings standard and specification of projects.
•Preparation of drawings from document control and distribute to site supervisors, foreman for installation.
•Coordinate management project control for Cost Budget and approval of level 4 schedule.
•Established manpower histogram for total man-hour baseline.
•Site monitoring and supervised in daily basis.
•Develop construction weekly and monthly progress reports.
•Execute site client & contractor comments for safety and quality of works.

Quantity Surveyor
  • إلى
Estimation Engineer في FAL PLATINUM Contracting Company
  • إلى

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في College of San Agustin
  • يناير 1990

بكالوريوس, Mechanical Engineering
  • في College of San Agustin
  • يناير 1990

Specialties & Skills

QA QC Engineering
Job Scheduling
Cost Engineering
Quantity Surveying
Control
BUDGETING
MECHANICAL
MEETING FACILITATION
MICROSOFT WORKS
PAINTING
PRICING
PROCUREMENT
PROGRESS
SPECIFICATION