Work Experience

Total years of experience :22 years, 0 Months

SENIOR ELECTRICAL ENGINEER at KEO INTERNATIONAL CONSULTANTS
  • Qatar - Doha
  • My current job since November 2018

SENIOR ELECTRICAL ENGINEER: REFURBISHING AND UPGRADING WORKS FOR ASGHAL SEWAGE WATER PUMPING STATION QATAR
CLIENT: ASHGHAL, DOHA, QATAR
RESPONSIBILITIES: Main role involves, reviewing the contractor submittals of Material review, ITP, QAP, Shop drawing, Engineering drawing, SAT, FAT procedure. Supervision of Site Installation, Liaise with Kahramaa, vendors, Sub-contractors, sub consultant, resolving technical issue, addressing client concerns, quality control and Field engineering. supervision support to the contractor for the Generator sizing, Motor sizing, Capacitor sizing, Cable sizing, Voltage drop calculation, Earth system, Lightning protection system, Lighting system, Battery charger sizing, UPS sizing, Firefighting, Fire hydrants, fire alarm system, fire trace system, Fire suppression system, Instrument transformers, MCC panel, Field instruments Installation.
PROJECT EQUIPMENT DETAILS: 300KVA 415V Generator, MCC Panels 2500A, 415V, 44KA /3sec, Cable, LV cable, Induction Motors, Soft starter, capacitor, Battery charger, UPS 5KVA, Cable tray, Lighting system, Lightning protection system, Earthing system. HVAC, Mechanical screen, Odour control system, EOT crane, potable water system, booster pumps, Level switches, Level transmitter, Flow transmitter, Fire Fighting, fire trace system, Fire alarm system, Proximity switches, SCADA, H2S Gas monitoring system.

SENIOR ELECTRICAL ENGINEER at Ministry Of Electricity And Water - Kuwait
  • Kuwait - Al Ahmadi
  • March 2016 to November 2018

SENIOR ELECTRICAL ENGINEER: CONSTRUCTION OF COMBINED POWER STATION KUWAIT-750 MW
RESPONSIBILITIES: Main role involves, reviewing the contractor submittals of documents, ITP, QAP, Shop drawing, Engineering drawing. Supervision of Site Installation Liaise with vendors, Sub-contractors, Site queries clarification, Field engineering and supervision support, Transformer sizing, Motor sizing, Capacitor sizing, Cable sizing, Voltage drop calculation, Earth, L.P.S calculation, Lighting, Battery charger sizing, UPS sizing, Firefighting, Fire hydrants, Fire suppression system, Instrument transformers, MCC panel, HV panels, Field instruments, Installation, Facility management.
Project Equipment Details: 320MVA Steam Turbine Generator, Heat Recovery Steam Generator, Generator Step-up Transformer 350 MVA, 20KV /400KV, GCB 12.5KA SF6, Static Excitation system, Unit transformer 28MVA 20KV/6.9KV OLTC, RTCC panels, 400KV GIS Panel. C & R Panel, 6.9KV Switch boards, MV Switch gear panel, 6.6KV / 3300KW HRSG Feed water Pumps.6.6KV/2600KW Cooling Water Pumps, 6.9KV / 1100KW, Chiller Unit, 415V LV Switch Board, 220V DC Dual Battery Charger, 240VAC Dual UPS, 400KV / 1C X 1000SQMM, XLPE Cables, HV & LV Cable sizing, Earth, L.P. S, HVAC, Lightings System, Firefighting system, Fire alarm system, Site Engineering.

ELECTRICAL ENGINEER at M/S PARSONS INTERNATIONAL CONSULTANT OMAN
  • Oman - Muscat
  • February 2014 to March 2016

ELECTRICAL ENGINEER: CONSTRUCTION OF NEW 380MLD WATER PUMPING STATION & 230/33KV PRIMARY SUBSTATION, MUSCAT
CLIENT: PUBLIC AUTHORITY FOR ELECTRICTY AND WATER & MUSCAT ELECTRICTY AND DISTRIBUTION COMPANY, OMAN
RESPONSIBILITIES: Main role involves, reviewing the contractor submittals of materials documents, ITP, QAP, Shop drawing, Engineering drawing, SAT, FAT procedure. Supervision of Site Installation Liaise with vendors, Sub-contractors, sub consultant, resolving technical issue, addressing client concerns and quality control Field engineering, supervision support, Transformer sizing Motor sizing, Capacitor sizing, Cable sizing, Voltage drop calculation, Earth system, Lightning protection system, Lighting Battery charger sizing, UPS sizing, Firefighting, Fire hydrants, Fire suppression system, Instrument transformers, MCC panel HV panels, Field instruments Installation.

Transformer sizing, Motor sizing, Capacitor sizing, Cable sizing, Voltage drop calculation, Earthing system, Lightning protection system calculation, Lighting System, Relay setting calculation, Battery charger sizing, UPS sizing, Firefighting, Fire
Hydrants, Fire suppression system, Instrument transformers, MCC panel, HV panels, Field instruments, Installation, Facility management
PROJECT EQUIPMENT DETAILS:
PRIMARY SUBSTATION - 2 X 16 MVA, 33/11.5KV
33/11.5KV primary substation with two Nos of 16MVA Main Transformers OLTC, RTCC panels. 33KV GIS, Control and relay Panels. relay setting calculation, 11KV switch boards, 11.5/0.415KV, 500KVA -2 Nos. 415V LV switch board, 110V DC Dual Battery charger with batteries 33KV, 3C X 300 SQMM XLPE Cables, HV & LV Cable sizing, Earthing system, Lightning protection system, 4 X 25 Ton capacity of Package unit HVAC system, Lightings system, Firefighting system, Fire alarm system, Site engineering.
NEW WATER PUMPING STATION - 380 MLD
11KV switch board, 1.2MW /11KV HV motors, 1.9MVA, 11KV/11KV Yaskawa Variable Frequency Drive. Relay setting calculation, 1000KVA Auxiliary transformers, 415V LV switchboard. HV cables, LV cables, 30VDC Battery chargers, 50KVA UPS 3 In 3 Out system, 10KVA UPS 3in 1 Out system, 60 Ton capacity of Package unit HVAC System, Ventilation fans, Lighting, lightning protection system, Earthing system, Fire Alarm and Firefighting system, FM 200 fire suppression system, CO2 firefighting system, EOT crane, Fire hydrants. Field instruments, Motorized valve actuators, flow transmitters and SCADA System.

SENIOR ELECTRICAL ENGINEER at ALJABER ENGINEERING, DOHA, QATAR
  • Qatar - Doha
  • May 2012 to February 2014

ELECTRICAL ENGINEER- REFURBISHING AND UPGRADING WORKS FOR ASHGHAL PUMPING STATION QATAR
CLIENT: ASHGHAL, DOHA, QATAR
RESPONSIBILITIES: Preparation of MAS, Design Documents, Shop drawing, Material procurement, Execution activities,
Technical Review Meeting with Client, Consultant, Internal Review Meeting with management, rising IR, MIR, FAT, SAT inspection, Erection, testing commissioning of the project.PS30, PS1, PS5, PS6 and Mannai underpass pumping station.
Project Equipment Details: 1.6MVA, 415V Generator 1.6MVA, 11/0.4I5KV, Transformer, MCC Panels 2500A, 415V, 44KA /3sec. 1 KV XLPE / cable, LV cable, Induction Motors with Soft starter controller. Battery charger, Industrial type UPS 15KVA 9KVA UPS, 5KVA UPS, Cable tray, Lighting, Lightning protection system, Earth, 25 TR HVAC, Mechanical screen, Level switches, Level transmitter, Flow transmitter, Fire Fighting, Fire alarm system, Proximity switches and SCADA.H2S Gas monitoring system.

SENIOR ELECTRICAL ENGINEER at M/S CADAGUA FERROVIAL
  • India - Chennai
  • January 2011 to May 2012

SENIOR ELECTRICAL ENGINEER - CONSTRUCTION OF HOGENAKAL WATER SUPPLY AND FLUOROSIS MITIGATION PROJECT INDIA (160 MLD WATER TREATMENT PLANT, PUMPING STATION, 50 MLD SEWAGE TREATMENT PLANT AND 110/33KV SUBSTATION
CLIENT: TAMIL NADU WATER SUPPLY AND DRAINAGE BOARD, INDIA.
RESPONSIBILITIES: Preparation of MAS, Design Documents, Shop drawing, Engineering drawing, Material procurement,
Execution, Technical Review meeting with Client, Consultant, Internal Review Meeting with our management, rising IR, MIR, arranging FAT, SAT inspection for the client, Erection, Testing Commissioning of the project.
Project Equipment Details: Project consist of Raw water Intake pump house, Water treatment plant, Treated Water Pump house, Booster Pump House, Master Balancing Reservoir and 126 Numbers of ELSR/GLSR storage water distribution pumping station. 33KV Dual dedicated outdoor substation for the River water pumping station, treatment plant with pumping station, Booster Pumping Station and Master Balance Reservoir with pumping station, each station having 33KV Indoor Switchboard, 6.6KV Switchboard, Measuring and protective relays. Main transformers 33/6.6KV 6.3MVA, 4MVA 3.2MVA, With OLTC, RTCC. Auxiliary T0.ransformers 6.6/0.415KV 200KVA, 100KVA, 800KVA, HV Motors of 6.6KV, 480KW 930KW, 640KW with FCMA Soft starter, capacitors bank 7.2KV, 121KVAR, 242KVAR, 158KVAR, lightings, lightning protection system, Earth, HV & LV Cables, 18 Nos of VT PUMPS, Field instruments, PLC, SCADA with Telemetric system, 110V Battery charger, UPS .

ELECTRICAL ENGINEER at OMAN NATIONAL ENGINEERING AND INVESTMENT COMPANY
  • Oman - Salalah
  • July 2009 to January 2011

ELECTRICAL ENGINEER: CONSTRUCTION O&M OF 48000 M3/DAY SEWAGE TREATMENT PLANT JUL 2009-JAN 2011
CLIENT: SALALAH SANITARY DRAINAGE SERVICES COMPANY, OMAN.
RESPONSIBILITIES: Erection, Inspection, testing, commissioning, Operation and maintenance for Expansion of 48, 000 M3/day Sewage Treatment Plant with Existing Plant Operating Capacity 35, 000 M3/day
Project Equipment Details: Area pumping stations Waste Water is pump in to the WRP through M. P. S. Each station having 11KV /415V, 1000KVA Substation with 6 nos of LT Motors 200HP, 90HP, 40HP, VFD, Odour Control system, HVAC, Lighting, Earth, Sump pumps, Ventilation fans. Primary Treatment Plant, Secondary Treatment Plant, Tertiary Treatment Plant, Chlorination System, Chlorine Neutralization System, Sludge Treatment, WRP and MPS s are connect with PLC/SCADA System for healthy operation. Dual Main 11KV switch gear boards. Dual dedicative 11/3.3KV 1600KVA substation feed the Medium Voltage MCC for Aeration Blower and Backwash Blowers. Conveyor Systems, Grinder System, EOT Cranes, H2S Gas Monitoring system, dual dedicative 11KV/415V Transformer feeds the 8 Nos of MCC panels, 1600KVA Generator can Provide power to all units of Water Reclamation Plant through step up transformer (415V to 11KV) in the event of power outage.

SENIOR ELECTRICAL ENGINEER at MAHINDRA WATER UTILITIES LTD
  • India - Chennai
  • January 2005 to July 2009

SENIOR ELECTRICAL ENGINEER: CONSTRUCTION OF 185 MLD WATER TREATMENT PLANT, PUMPING STATIONS, 50MLD SEWAGE TREATMENT PLANT, 110/11KV SUBSTATION
CLIENT: NEW TIRUPUR AREA DEVELOPMENT CORPORATION LIMITED, INDIA.
RESPONSIBILITIES: Installation, Erection, Testing, Commissioning, Operation and Maintenance of 185 MLD River water treatment plant, Sewage Water Treatment Plant (RWI, WTP, BPS, MBR operated by SCADA Securing system, IMS Implementation, 110KV substation, 11KV substation)
Project Equipment Details: 11KV dual outdoor switching yard .11KV Switchboard for River water intake pumping system Water Treatment Plant, Booster Pumping station. HV, LV cables installation, Clear water pumping station 1.570 MW, 11KV HT Motors with FCMA Soft Starter. HV Capacitor bank for power factor improvement, Booster pumping station, 1.8 MW 11KV Motor controlled by FCMA Soft starter, River water intake pumping station, 0.520 MW motor control by V.F.D
30V Battery charger for HV panel relay operations, Industrial UPS 10KVA, 110/11 KV substation with two Nos of 10 MVA Power transformers, Instrument transformers, RTCC panel and C&R Panels.

ELECTRICAL OFFICER at TANTECH AGRO CHEMICALS LTD, INDIA.
  • India - Chennai
  • May 2002 to January 2005

ELECTRICAL OFFICER: CONSTRUCTION OF AGRO AND PHARMA INDUSTRY (M/s TACL) MAY 2002-JAN 2005
RESPONSIBILITIES: Erection, Installation, Testing, Commissioning, Operation and Maintenance of whole project (Pharma & pesticide division) including 22KV substation.
Project Equipment Details: 22KV switch board, 2.5MVA Transformer, 1.6MVA Generator, 415V switch board, HV, LV Cable installation Battery charger, 5 Tons of Boiler control panel, Vapor Absorption and Refrigeration system, Cooling tower, HVAC system, Conveyor system, Lighting, Lightning protection, Earth, Reactors, Incineration, Laboratory system, pesticide and pharmaceutical division electrical equipment installation testing and commissionin

Education

Bachelor's degree, Electrical And Electronics Engineering
  • at Annamalai University,Tamilnadu,India
  • May 2002

Specialties & Skills

Unit Testing
Equipment Sizing
Installation
Engineering
Maintenance Planning
Construction
Substation construction
SUPERVISORY SKILLS
Sewage pumping station and treatment plant
Pumping station
sizing of electrical equipments

Languages

English
Expert
Tamil
Native Speaker
Hindi