construction manager
Redyar company
مجموع سنوات الخبرة :15 years, 7 أشهر
Construction manager to execute and supervising of(New Erbil food Distribution center) the project contains(in phase 1) 5 ware house of 10000m2 each with cold storage of 20000m2 with all parking's and road and sewerage system, all ware houses in steel structures and sandwich panel .
construction manager to execute civil works of new steel silo in Erbil which contains tunnels and workhouse building of 9m depth underground with hopers and etc. under supervising of MULMIX company (Italian) that they will be complete the steel parts with mechanicals accessories .
Area manager to execute trade building contains three building of 5 flats each one. The work including subcontractors, my duty to control and distribution the item for the project, coordination with consultant, complete the project at the time planned .
construction manager for constructing hydropower station in Bekhal contains forebay tank, retaining wall, bridge and the main station of two turbines contains big chamber of 12*9*10m and the control room is above the all items in reinforced concrete under auspices of Korean company (koika), my duty is coordination with korian company about the the execution all items according to the specification, with calculation the quantity, time schedule, invoices, material incoming etc.
complete the remaining buildings of Development of Erbil city centre project (structure and finishing)
I worked as a area engineer of development of Erbil city centre project contains of multi-storey buildings, malls, parking, offices etc. with a new method of construction in Iraq like hollow core slabs and precast beams with combined structure of steel and concrete, friction piles of 16m depth, my duty is checking the drawings from the consultant, materials incoming to the project like quantities and qualities, making time schedule for the items, making reports for the project manager and control on the executing quality.
I worked as a construction manager to execute multi story building in (AL-Hadbaa housing project), this project contains 56 building of 9 flat each one, my work is supervising and executing 7 of these buildings by preparing and calculate the quantities according to sketches and recommends of AL-Mansour company which represents the main contractor of the project
I worked as a site engineer for repairing multi-story buildings for new Iraqi army in AL-KASSEK (northern al Mosul city about 65km), the works including repairing and finishing works.
I worked as a site engineer of construction a water seepage network and pumping station which include excavating works at different levels and extending plastic pipes of different diameter then constructing pumping station of 6m depth with three submerged pumps.
I worked as a site engineer in MAKHOOL dam (about 250 km northern of Baghdad) by supervising on preparing filters of dam like sand, gravel, clay then casing the body of dam by concrete block (pre-cast plain concrete) and making test on those materials according to the specification of the project. In additional of these works constructing the office of the administration at the down stream of the dam.
Responsible for construction of the reinforced concrete skeleton, Supervision of the repair works.
university of mosul - college of engineering - civil engineering department