Electrical System Engineer ( Electrical installation, Test&commissioning and maintenance)
Alstom Egypt for Transpot
Total years of experience :12 years, 6 Months
I'm as an electrical system engineer work in electrical Installation, Test and Commissioning, Corrective, Predictive and Preventive maintenance.
I'm working in Cairo metro - Line 3 project:
• Mainly the unique responsible for making all testing and commissioning procedures for all HV, MW and LV electrical substations before drag them in service to be sure that they are ready to be used safely.
• Responsible for making (FAT) for all electrical stations components as transformers, rectifiers, electrical panels, protection devices and so on.
• High ability to cooperate with AC and DC systems.
• Making injections for alot of kinds of protection devices like relays, SEPCOS, SEPAM and so on
• Monintoring installations of all substaions components to consistently meet rigorous customer requirements and to avoid any problems during SAT which were due to the wrong installation.
• Making after sales (guarantee period ) corrective, preventive and protective maintenance for all power supply sub stations components.
• Responsible for training my team members like technicians and junior engineers.
I was working in (Planning, Sourcing, Tendering, Logistics, Training, Installation, Operation and Corrective maintenance)
• Responsible for searching on electrical and mechanical tenders which are issued throughout the public and private sector
• Responsible for filtering them to get the suitable tenders to work on
• Responsible for studying deeply the customer’s tender technical specifications
• Responsible for making wide search inside and outside Egypt to completely meet our customer’s specifications
• Responsible for making negotiations with our suppliers to get the best offer which enables us to strongly compete our competitors and also meets our customer’s payment conditions
• Responsible for making training for our customer staff either outside or inside Egypt
• Responsible for excitation the site installation and operation
• Responsible for the corrective maintenance through the guarantee period
• I could win five tenders through these three years
I was working in Cairo metro - Line 2 as an electrical system engineer:
• Responsible for making installation for HV, MV and LV electrical substations components
• Making FAT procedures
• Making testing and commissioning for HV, MV and LV electrical substations components
• High ability to cooperate with AC and DC systems.
• Making injections for alot of kinds of protection devices like relays, SEPCOS, SEPAM and so on
• Responsible for training my team members like technicians and junior engineers.
I was working in NILE RITZ CARLTON (NILE HILTON Previously)
• Responsible for installing, testing and operating the power, lighting and dimming systems
• Responsible for installing, testing and operating the light current systems like internet, telephone, sound, data show, CCTV and fire systems
• Responsible for installing, testing and operating the electrical power station which has transformers, electrical panels, power and control cables
• Responsible for making (FAT) for all electrical panels which were used in whole project
• Responsible for making AS BUILT drawings
• Performed in depth electrical acceptance testing of completed hardware, including continuity and high potential testing