Wind Power Consultant
Sweco
Total years of experience :8 years, 8 Months
Performing flicker, and other environmental studies for project evaluation and planning. Optimize layout to increase the farms performance to add value to the project by minimizing productions losses and maximizing the energy yield. Assisting environment consultants with noise assessments for the permitting process compliant with the regulatory limit values, and flicker studies ensuring that flicker levels are limited, and photomontages and ZVI (Zone of Visual Impact) studies as preparation for the permitting process, to visualize and evaluate the visual impact.
Designing water and sewerage and stormwater solutions. Planning is often a team effort, and it happens that I am responsible for assignments in projects. In the projects, we help clients to produce necessary project documents for the various phases that the project is at. My duties also include manage coordination of existing pipe infrastructures.
Designing water and sewerage and stormwater solutions. Planning is often a team effort, and it happens that I am responsible for assignments in projects. In the projects, we help clients to produce necessary project documents for the various phases that the project is at. My duties also include manage coordination of existing pipe infrastructures. This task is performed prior to the execution of water and sewerage works to coordinate water and sewerage projects with affected pipe network owners.
Based on project documents, I carried stake out and surveying with a totalstation as a guide for carrying out construction and civil engineering tasks. The tasks included documentation of performed out stackings and measurements. In addition, I designed terrain models for machine control used in excavation works and performed volume calculations.
The education offered expertise in planning and design of wind power and covered a wide range of knowledge areas useful in planning, environment, technology, energy, wind resources, economics and electricity grid connection. The training provided the ability to calculate wind power plants' energy production at a selected location and to communicate wind power issues with those concerned.