Project Manager / Construction Manager
Meera Shanthi Vanam Projects Limited
Total years of experience :28 years, 5 Months
Area Deputy Manager -Civil- (February 2015 to 31.07.2017)
Petrofac E&C Sdn Bhd.- Construction in RAPID Project Site, at Pengerang.-Malaysia
Responsibilities:
o As an DM, Arranging to Resources and Develop Infrastructural support for In-house
o Maintaining Cost Control on Infrastructural Support for In-house.
o Arranging and Organize Resources for Executing Temporary Construction Facility, Camp, And Process Area Plant.
o Planning, Organizing, and Control Measures on Executing Pile Driven at the Rapid Project.
o Close Monitor and follow-up action implementing the activities at appropriate time.
o Follow up action and implementing works monitored in the War Room Meeting on daily basis.
Joint General Manager -Civil -HOD (November 2010 to 30.09.2014)
ESSAR Projects (India) Limited. - Matix Fertiliser&Chemicals Limited-Durgapur
Responsibilities:
o Planned, Organized, Executing, coordination and completing ISBL, OSBL, & finishing product main unit of Pilling Tower -Urea Plant at Durgapur.
o Organizing resources, materials, manpower, and optimum utilization of Equipment in the project and achieving the target as per Schedule S2.
o Implementing Quality Management system, at site, and conducting regular internal audit at site, and maintained quality system of working.
o Implementing Safety system at start level to end level and conducting regular peb-talk, displacing cut-outs to understand the safety at the entry itself.
o Completed all units civil works and handed over unit structures to client, Pre commissioning, and commissioning is being in active process.
Construction Manager (Nov 2004 to November 2008)
Essar Construction Limited - Essar Oil Limited Jamnagar - Gujarat
Responsibilities:
• Planned, executed, coordinated and commissioned within scheduled time. of the following projects - Cooling Tower, Reservoir, Waste Water Treatment Plant, Stack, Flue Gas Duct Structure, FCCU, DHDS, ARU/SRU. FGD
• Manage the sub-staff and maintain relations with service departments. Ensure adherence to strict quality standards.
• Ensure Contractual Agreement is adhered to with consultants and clients.
• Control Site Management and Achieved Quality, Safety, and Progress in the stipulated time.
Major Achievements:
• The Amount of yearly construction work executed
Concrete - 125000 cubic meters.
Formwork - 425000 square meters.
Steel - 15000 Metric tons.
Epoxy lining - 3000 Sq. meters.
Hard Rock - 6000 Cubic meters.
Officer / Asst.Construction Manager (Sep 1995 to Oct 2004)
Larsen & Toubro Limited ECC Division Chennai
Responsibilities:
• Executed following complete civil work projects Dhyana Vihar Building -27.32 crores.
CWSS - TWAD - Water supply scheme to urban city - Rs 6.50 crores.
Clinker Grinding Unit.
DHDS Expansion - HPCL- Vizag - Cooling Tower Civil Structure - Rs 110 crores
Expansion of NP2NPK Plant at CFL - Vizag - Planning, Execution of NP2NPK plant in the existing plant - Rs4.75Cr
Rain Calcining Plant - Foundations, Chimney, Cooling Tower Structure - Rs 25 crores
Construction of IT Park at Bangalore - Rs 330 crores
Major Achievements:
• The Amount of yearly construction work executed
Concrete -1, 25, 000 cubic meters.
Form work - 2 lakhs square meters.
Steel - 15000 Metric tons.
Masonry - 30000 cubic meters.
Plastering - 125000 square meters.
Painting - 102000 square meters