Assistant Manager Industrial Engineer
Style Textile
Total years of experience :4 years, 11 Months
• Built operation bulletin, SAM bank, and Production board
for all articles and operations
• Sewing Line Engineering and minimizing downtime using
Root Cause Analysis through statistical process control techniques (Brainstorming, Pareto Analysis, Control Charts,
Fishbone Analysis, Histogram, and Six Sigma)
• Sewing and Finishing End Line OL, DHU, and FPY
Reports.
Implementing Total Quality Management, Lean
Manufacturing, and 5S to minimize wastage.
• Optimize process flow by minimizing transportation and
maximizing communication between departments
• Design Layout for newly installed production line
• Supervise and control the induction of all the production lines
• Maintain Capacity Resource planning sheet (CRP), Booking
Sheet, and minimum stock level (MSL).
•
Optimize process flow by minimizing transportation and
Maximize communication between department
•
Communicate all the threats, weaknesses strengths, and
Opportunities to higher management through SWOT
Analysis.
•
Make Monthly process Plan Following the Due Dates of
All the Orders and Fabrics Availability.
• Communicate all the plans to the concerned Department
Make Priority Sheet of Fabric and All the Accessory
Related to Cutting, Sewing, and Finishing & Packing and
make Sure There Availability on Time.
•
Built operation bulletin, SAM bank, and Production board
for all articles and operations
.