كاشف  خان, pipeline engineer

كاشف خان

pipeline engineer

Ali Alghanim Group Company (MECC), Kuwait

البلد
الهند - ناجبور
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
13 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :13 years, 8 أشهر

pipeline engineer في Ali Alghanim Group Company (MECC), Kuwait
  • الكويت - الأحمدى
  • أشغل هذه الوظيفة منذ يوليو 2018

• Leading a team of, site execution team and technical team briefing them of their weekly target and monitoring the progress at closer level, and leading a group of technical team.
• Prepare measurement sheet as per construction drawing with the ref of WPR, test package, MTO, BOQ.
• Cost controlling as per site requirements.
• Co-ordinate with the Client Responsible Team member and attended meeting with client.
• Follow the Isometric Construction drawing, P & ID, GA P.E.F.S reading/understanding & different symbols used in piping drawings.
• Follow up material availability as per BOQ & MTO at site.
• Provide daily updates to Construction Manager on different phases of modification (i.e. pre-shutdown, shutdown, post-shutdown, demolition phase, Well Isolation & de Isolation, Rig Clearance, and pre-commissioning works for each platform).
• Conduct site modifications as per approved site queries and proposals, as-built drawings, installation procedures, risk assessment amendments, work-lists and job cards as required and test packages in addition to attending daily progress meetings.
• Follow up of each test package, punch items and ensuring the smooth flow of packages between various departments (mechanical, civil, instruments, electrical).
• Review of hydro test equipment’s calibrated such as pressure gauge, chart recorder temperature recorder etc.
• Responsibility to clarify Punch list, cross check materials used in fabrication in accordance with design or drawing requirements.
• Followed standard construction practices and safety precautions to effectively build as directed.
• Worked alongside other contractors and clients to meet requirements quickly and efficiently.
• Provided support to piping/mechanical Supervisor.
• Relayed information to construction staff quickly and accurately.

Pipeline Engineer / Permit Applicant في Seeh Al Sharya Engineering LLC ,
  • عمان - مسقط
  • مارس 2016 إلى مايو 2018

• Ensure all work done according to (ASTM, ASME, API 5L) company and Client contract.
• Preparation for Hydro testing Package report deal with the different drawings, material inspection, I&TP etc.
• Worked based on AG & UG, Hookup, Pipeline, Piping Isometrics Drawing, GAD & P&ID, P.E.F.S (Process Engineering Flow Schematic), Drawing Package, and MTO.
• Work involves Pipe stringing, welding, lowering/erection, Tie-ins, Road crossing, HDD, and Isolation, hydro-testing, gauging, purging, Spading, de-spading of pipeline, Isolation Joint Replacement activity.
• Prepare report and forecasts, including summary of construction progress, job manpower forecasts.
• Co-ordinate with the Client Responsible Team member and attended meeting with client.
• Leading a team of, site execution team and technical team briefing them of their weekly target and monitoring the progress at closer level, and leading a group of technical team.
• Preparation of punch list, follow up of rework and involvement of modification activities.
• Routine Area Surveillance erection activities to ensure that they are installed correctly.
• Distribute the job related to concern foreman related to the following the field Piping, Pipeline, Hookup Spool, fabrication, erection.
• Developed all engineering drawings for scheduled project at maximum cost-effectiveness.
• Resolved all technical problems in engineering blueprints.
• Follow the drawings and specifications as per construction requirements.
• Determine/reviews/reports manpower requirements for filed activities.
• Responsible for oversight of field construction operation within assigned areas.
• Coordinate various testing team like Radiography, Magnetic Particle test, Ultrasonic test, Ferrite test, Hydro testing, Pigging, Nitrogen Purging, etc.
• Co-ordinate with Plant for arranging the crane, boom loader, side boom, trailer, etc.
• Attending Safety meetings, Construction meetings and Planning Meeting for further assignments in hand.
• Prepares/reviews schedules, construction methods and procedures as assigned.
• Follow PDO HSE Quality, Standards, & Procedure.
• Provides oversight of field activities to ensure personnel and nuclear safety.

Piping Supervisor في Kentz Engineering and Construction
  • المملكة العربية السعودية - الجبيل
  • أغسطس 2015 إلى يناير 2016

 Good work practices with an Isometric Construction drawing, P & ID, GA reading/understanding & different symbols used in piping drawings MTO.
 Conduct site modifications as per approved site queries and proposals, as-built drawings, installation procedures, risk assessment amendments, work-lists and job cards as required and test packages in addition to attending daily progress meetings.
 Coordination between Project management team and Construction group (QA/QC, PID, PMT, Electrical, Civil, Transporting dept.) on all site situation issues.
 Working along project management team, Preparation of Project documentation (work packs, job cards, test packs etc.)
 Provide daily updates to Construction Manager on different phases of modification (i.e. pre-shutdown, shutdown, post-shutdown & demolition phase, hook-up and pre-commissioning works for each platform).
 Analyses the flow of direct incoming materials for the assigned assembly over the short-medium term period, comparing the findings with the scheduled program and in the case of variation forecasts, rescheduling works in such a way as to minimize any negative impact on times and costs.
 Co coordinates with Material Dept for smooth functioning.
 Supervise the work of the technicians, identifying any critical areas and implementing the necessary action to overcome said critical phases in the stipulated time.
 Planning with the team member/ department for erection, commissioning etc, activity are in sequence, achieve the worked completion as scheduled time period.
 Attend every day Safety meeting (TBT, LOTO, and PTW).
 Co-ordination with QHSE department for update safety training procedure

Mechanical Supervisor في Ray International Energy LLC
  • عمان - مسقط
  • يونيو 2014 إلى يونيو 2015

 Follow the P & ID reading / understanding & different symbols used in piping drawings.
 Planning, execution and supervision of construction works to achieve milestones in accordance with installation, procedures, engineering drawings and client specifications.
 Review test package check, availability of material needed in executing hydro test.
 Supervise to Supervisor follow the pipe cleaning procedure flushing, air blowing, pigging, gauging as per method of standard, procedures prior to hydro-testing activities.
 Follow up of each test package, punch items and ensuring the smooth flow of packages between various departments (civil, instruments, electrical).
 Review of hydro test equipment’s calibrated such as pressure gauge, chart recorder temperature recorder etc.
 Responsibility to clarify Punch list, cross check materials used in fabrication in accordance with design or drawing requirements.

Mechanical Supervisor في Al Turki Enterprises LLC
  • عمان - مسقط
  • ديسمبر 2012 إلى مايو 2014

 Leading a team of, foremen and technicians, briefing them of their daily work and monitoring the progress at closer level. Leading a group of technician.
 Proper selection & handling of Skilled and Unskilled manpower.
 Co-ordinate with the Client and Consultant.
 Execution of work as per drawing and approved procedure.
 Supervision of all pipeline construction activities like stringing, mainline welding, joint, lowering, bending, Pre hydro testing etc.
 Documentation related to project works and making pipe books.
 Inspection of incoming material and preparation of IMIR.
 Weld visual inspection of mainline and tie in welding
 Control and Maintain Quality Standard at Site.
 Preparing daily working schedule & daily progress reports.
 Preparation of inspection reports.
 Coordination with all concerned departments for smooth & timely execution of contract.
 Fabrication and erection of piping spools.
 Receiving work permits, implementing standard procedure and safety rules and regulations, conducted weekly safety auditing and reporting, participated weekly safety meetings and familiar with all relevant safety induction like Tool Box Talk, Confined Space Entry and Pre-Commissioning priority etc.

Engineer في APPLE AIRCON PVT LTD
  • الهند - مومباي
  • يوليو 2010 إلى ديسمبر 2012

• Fabrication, erection, and installation various type piping related to as per isometrics and GA drawings.
• Ensure the completion of shop fabrication on time as per given schedule.
• Cross checked all fabricated spool along Isometrics or GA Drawings.
• Referring codes, standards and follow specification.
• Carry out fit up & visual inspection of spools as per relevant isometric drawings.
• Monitoring Health and Safety Environment of the working area.
• Coordinating with QA/QC Dept related quality, production issue.
• Coordinating with Material Dept. HSE, Transport, and Personal Dept.
• Prepare work progress report and update to Sr. Engineer /Manager

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في Institute of Mechanical Engineers, Mumbai
  • مايو 2020

Pursing

دبلوم, Mechanical Engineering
  • في Anjuman Polytechnic
  • أبريل 2010

I have done three years Diploma Mechanical Engineering subject are TOM, Strength of Material , Math, Fluid Mechanics, Physics, design,

Specialties & Skills

Pipelines
Oil and Gas
Team Supervision
MS-Office
Auto cad
Piping Construction
Pipeline Construction
Project Managements
Supervision
Mechanical Construction

اللغات

الانجليزية
متمرّس
الأوردو
اللغة الأم
الهندية
اللغة الأم
العربية
متوسط

الهوايات

  • Traveling
    Visit adventuresses place.
  • Reading
    "The QURAN",