TCE Manager
MMM
Total years of experience :22 years, 10 Months
Itezhi-Tezhi hydroelectric project -
Responsibilities:* Managing and controlling all commercial issues.
Monitoring and approving change proposals, .Forecasting
schedule, delay analysis and taking necessary measures.
Contract administration and contract practice, project
financial control and reporting, design economics,
quantification and costing of construction, data
management, communication and negotiation, conflict
avoidance etc.
Time Spent:* 3 Year
2 TCE Name of
Assignment and
Project:*
Project Management of construction of 232 TPD
Pneumatic Tyre, 10 TPD solid tyre & 10 TPD tubes
Manufacturing Plant of Balkrishna Industries
Location:* Bhuj
2-Project Management of construction
of 232 TPD Pneumatic Tyre, 10 TPD
solid tyre & 10 TPD tubes
Manufacturing Plant of Balkrishna
Industries-Site Engineer
3
Responsibilities:* Managing and controlling all civil work pertaining to
requirement of Tyre Industries. Controlling and
Monitoring, progress of civil works. Monitoring quality
tests and implementing quality assurance plan. Co-
ordination, Interaction and maintaining interface with other
discipline for optimal result, construction technology and
environment, contract administration, contract practice,
project evaluation etc.
Time Spent:* 1.5 Year
3 TCE
Responsibilities:* Responsible for Managing and controlling of execution
and billing of all civil work pertaining to Cement Plant
such as - Raw meal, Baghouse, Preheater, Clinker Silo,
Coal mill, Kiln Pier etc Schedule & monitor the civil
activities as per schedule, Ensuring quality and safety
during work project financial control and reporting,
quantification and costing of construction, communication
and negotiation, conflict avoidance, data management,
ethics conduct and practice, health safety, sustainability,
team working
Time Spent:* 6 Months
4 TCE
.
Name of
Assignment and
Project:*
KNBE Hydro-Electric project (a expansion project of
Zambian electricity board) as a Project Management
Consultant/CM (joint venture of EDF and TCE)
Location:* Zambia
KNBE Hydro-Electric project (a
expansion project of Zambian
electricity board)--Responsible for
Managing and controlling all civil
work pertaining to requirement of
powerhouse work such as checking
and revival of powerhouse drawing
submitted by EPC contractor,
Schedule & monitor the civil work
activities. Approval of method
statement, monitoring progress with
contractor and client
Responsibilities:* Responsible for Managing and controlling all work
pertaining to requirement of powerhouse work such as
checking and revival of powerhouse drawing submitted by
Responsibilities:* Responsible for Managing and controlling of billing for all
civil work pertaining to requirement of Automobile
industry such as Power train shop, Utilities as measured
built-up area of 1.5 lacks sqm, rate analysis for extra items,
Schedule & monitor the civil activities as per schedule.
Interpreting the technical specs, bill of quantities and
conveying the same to the contractor for effective contract
administration. Maintaining interface with the other
discipline for optimal result, Analyzing and
recommendation for claims of time extension and extra
cost from contractors, Checking of schedule submitted by
contractors and monitoring resources, Supporting for
Preparation and amendment in Purchase order, Preparation
of Contract closure Documents, Checking of Final bill
submitted by contractors etc.
Time Spent:* 2 Year
6 Era infra structure ltd Name of Assignment and
Project:*
Cut and Cover tunneling Delhi Metro Rail project at
Dwarika Delhi
Location:* Delhi
Era infra structure ltd
Role:*
Raja ram Kohali Marg, 2.5 KM long
Grade separator Project (PWD Delhi)-
-Responsible for Execution of all civil
work (piling, pile cap, pier, pier cap,
retaining wall, voided deck slab pile
load test etc), preparing method
statement and quality check list
Role:*
Bidding
engineer, Site
In-charge of
TBM boring
tunneling
HCC LTD,
, Site In charge
Responsibilities:* At Tendering Department
Preparation of Technical and Financial bid for
Hydropower projects, DMRC metro Projected. - (Ensuring
that realistic but economical proposals and cost estimates
to within the required level of accuracy and to suit the
proposal time schedule, evaluation of new method and
technology (Bar chart and Method statement, Economical
selection and Planning of equipment, Estimation of Direct
cost, Preliminary cost, Indirect cost, Risk analysis,
Escalation, contingencies, and Cash flow statement) etc
.Core analysis of different clauses in contract document,
Preparation of the technical and financial documentation to
be submitted with tender).
Project
Underground tunneling 12.6 km of 4.5 m diameter by
TBM method for water supply Project (BMC Mumbai)
Well sinking and underground TBM erection, 12.6KM
tunneling by TBM Boring method, Tunnel lining, Contact
grouting etc
At Baglihar Hydro electric project -
Responsible for Managing execution
for civil work such as 11mØ
Diversion Tunnel Excavation and
lining, excavation and Diversion of
river Chenab by one go blast
, Cofferdam construction, 19mØbell
mouth shape intake structure
excavation and concreting, Dam
excavation, consolidation grouting of
dam foundation, Shaft excavation for
90 m depth, cable crane foundation for
dam concreting, Development of roads
, Establishment of crushing plant,
cement cello plant and other
Infrastructure works.
Indra Sagar Hydroelectric Project
Responsible for Managing execution
for civil work such as Surface power
house concreting(draft tube to
machine hall), power house building,
Dam concreting, dam bucket
concreting, dam top bridge and pre-
stressing work, Survey with total
station, Curtain grouting in dam
foundation, Site billing
, Reinforcement scheduling etc
Responsibilities:* At Baglihar Hydro electric project -
Responsible for Managing execution for civil work such as
11mØ Diversion Tunnel Excavation and lining, excavation
and Diversion of river Chenab by one go blast, Cofferdam
construction, 19mØbell mouth shape intake structure
excavation and concreting, Dam excavation, consolidation
grouting of dam foundation, Shaft excavation for 90 m
depth, cable crane foundation for dam concreting,
Development of roads, Establishment of crushing plant,
cement cello plant and other Infrastructure works.
Indra Sagar Hydroelectric Project
Responsible for Managing execution for civil work such as
Surface power house concreting(draft tube to machine
hall), power house building, Dam concreting, dam bucket
concreting, dam top bridge and prestressing work, Survey
with total station, Curtain grouting in dam foundation, Site
billing, Reinforcement scheduling etc
Sahara city Lucknow
Responsibilities:* Involved in construction of Township (construction of
different type of house, low cost housing, Road work
and multistory buildings) in Sahara city Luck now
Involved in construction of Khalilabad
Sugar mill (mill foundation, milk and
lime house, foundations) and Building
works
Responsibilities:* Involved in construction of Khalilabad Sugar mill
(mill foundation, milk and lime house, foundations)
and Building works
Involved in construction of six story
commercial mall building, preparation
of architectural drawing of buildings
to satisfy client needs, preparation of
rate for different item of building
work and negotiation with
subcontractors
Detailed Task Assigned (Project Experience)
Responsiblities:* Involved in construction of six story commercial mall
building, preparation of architectural drawing of buildings
to satisfy client needs, preparation of rate for different
item of building work and negotiation with subcontractors
Time Spent:* 2 Year
I T SKILLS
Building Engineering &Quantity Surveying The Institution of Surveyors
Building Engineering &Quantity Surveying The Institution of Surveyors
Building Engineering &Quantity Surveying The Institution of Surveyors
Building Engineering &Quantity Surveying The Institution of Surveyors