Total des années d'expérience: 12 Années, 3 Mois
mai 2023
A À présent
Projects Manager
à Lambda Group for Engineering Solution
Lieu :
Koweït - Al Koweït
• Following up with the site team to achieve the correct details.
• Following up with the shop drawings and achieving the designer’s concept.
• Following up with the projects program to achieve the committed timeline.
• Following up with the procurement team to deliver the materials on time.
• Following up with the subcontractors.
• Preparing reports (Daily, weekly and monthly)
• Coordinating with each party in the project to achieve the design requirements.
• Providing materials as per the design requirements.
• Following up with the shop drawings and achieving the designer’s concept.
• Following up with the projects program to achieve the committed timeline.
• Following up with the procurement team to deliver the materials on time.
• Following up with the subcontractors.
• Preparing reports (Daily, weekly and monthly)
• Coordinating with each party in the project to achieve the design requirements.
• Providing materials as per the design requirements.
septembre 2017
A avril 2023
Projects coordinator/ Projects Manager
à Global Identity General Trading Co
Lieu :
Koweït - As Salimiyah
• Following up with the site team to achieve the correct details.
• Following up with the shop drawings and achieving the designer’s concept.
• Following up with the projects program to achieve the committed timeline.
• Following up with the procurement team to deliver the materials on time.
• Creating the required details.
• Following up with the subcontractors.
• Preparing reports (Daily, weekly and monthly)
• Following up with the QAQC.
• Coordinating with the designer and the site team.
• Coordinating with each party in the project to achieve the design requirements.
• Coordinating the preparation of MEP designs drawings.
• Coordinating the MEP with the architectural design.
• Providing materials as per the design requirements.
• Preparing the required time line, using MS Project
• Preparing the required contracts with clients/ contractors.
• Following up with the shop drawings and achieving the designer’s concept.
• Following up with the projects program to achieve the committed timeline.
• Following up with the procurement team to deliver the materials on time.
• Creating the required details.
• Following up with the subcontractors.
• Preparing reports (Daily, weekly and monthly)
• Following up with the QAQC.
• Coordinating with the designer and the site team.
• Coordinating with each party in the project to achieve the design requirements.
• Coordinating the preparation of MEP designs drawings.
• Coordinating the MEP with the architectural design.
• Providing materials as per the design requirements.
• Preparing the required time line, using MS Project
• Preparing the required contracts with clients/ contractors.
décembre 2011
A août 2017
Project Manager
à sadeer trading & contracting
Lieu :
Koweït - Al Koweït
• Following up with the site team to achieve the correct details.
• Following up with the shop drawings and achieving the designer’s concept.
• Following up with the projects program to achieve the committed timeline.
• Following up with the procurement team to deliver the materials on time.
• Following up with the subcontractors.
• Preparing reports (Daily, weekly and monthly)
• Coordinating with the designer and the site team.
• Coordinating with each party in the project to achieve the design requirements.
• Providing materials as per the design requirements.
• Preparing the required time line, using MS Project
• Following up with the shop drawings and achieving the designer’s concept.
• Following up with the projects program to achieve the committed timeline.
• Following up with the procurement team to deliver the materials on time.
• Following up with the subcontractors.
• Preparing reports (Daily, weekly and monthly)
• Coordinating with the designer and the site team.
• Coordinating with each party in the project to achieve the design requirements.
• Providing materials as per the design requirements.
• Preparing the required time line, using MS Project
Partager sur Facebook
Partager sur Twitter
Partager via Email