Khaja Rafiuddin, QC

Khaja Rafiuddin

QC

TAMIMI INDUSTRIAL SERVICES

Lieu
Arabie Saoudite - AlJubail
Éducation
Etudes secondaires ou équivalent, Mechanical
Expérience
8 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :8 years, 10 Mois

QC à TAMIMI INDUSTRIAL SERVICES
  • Arabie Saoudite
  • septembre 2018 à mars 2019

PROJECT: (LTA-02) TO MAINTAIN POTENTIAL FACILITIES OFFSHORE KSA.

QC à SAIPEM TAQA AL-RUSHAID FABRICATORS CO. LTD
  • février 2018 à juillet 2018

KING ABDUL AZIZ SEA PORT, DAMMAM.


PROJECT: RABIGH PHASE II - PETROCHEMICAL PACKAGE UO2 & UO3, KSA.
CLIENT: PETRO RABIGH COMPANY LTD.

QC à PETROJET
  • Émirats Arabes Unis
  • octobre 2015 à décembre 2016
QC à RABIGH
  • Arabie Saoudite
  • juillet 2013 à mars 2014
QC à LG-SHAKER CONSTRUCTIONS LTD
  • Arabie Saoudite
  • juin 2011 à juillet 2012

of all documents (WPS, PQR, ITP) and working as per, Quality inspection procedure, schedule Q and all the applicable SAES, SAEP, SAIC, SATIP.
•Inspecting the received materials for damages dimensions and ensures that MTC is available and ensure satisfactory identification of materials as per, proper storage and preservation of spools. Verify proper size and schedule of pipe.
•Inspection of all welding consumables and filler materials as per ASME SEC II C, Consumable handling storage and issuance as per SAIC.
•Ensuring all the welding equipment and other measuring devices are calibrated.
•Performing welding Inspection pre weld, in-process and post welding inspection.
•Inspection of Fit up including material grades, diameter, schedule, joint configuration, root gap, internal misalignment and length.
•Performing inspection as per latest revision of isometrics and checking with test packages.
•Checking preheating & interpass temperature has been maintained as per WPS prior &during welding
•Raising RFI in EPM as per daily production plan and closing accordingly.
•Conducting tool-box meeting to increase the proficiency of the welders.
•Raising RFI for Engineering Modification and Repair.
•Confirm repairs, re-testing and re-inspection in accordance with specifications.
•Preparation of joints for NDE as per required line Class, NDE Matrix.
•Review the requested joints and witness NDE.
•Raise weekly RFI for Selection of welds for NDE, Consumable control, storage and Issuance and Data Base as per SAEP-1160.
•Review Reports SATR-W-2013, SATR-W-2019, Backlog Status Report For NDT Methods
•Review RT Coverage & Repair Status Per Line Class, Tracers Weld Joints Status Report, PMI Test Status Report, Socket, Fill & Split Groove Joints
•Preparing weld summaries and review it.
•Issuing Pro Active and NCR based on the type of violations as per SAES.
•Identifying quality problems, promptly reporting and documenting all the instances of Non-conformance and stopping further processing of work till its rectification.
•Checking the punches and follow up with construction department and clearing the packages
•Attend weekly quality meeting to discuss bottleneck issues
•Orderly collect and manage/check documents certifying tests, controls and inspections documents, ensuring that all welding and testing related records form a complete package and reflect the As Built.
INDIAN EXPERIANCE

Pioneer Inspection Services Pvt Ltd.

QC
  • Inde
  • avril 2009 à juin 2011

Client: Reliance Gas Transportation Infrastructure Limited.
Contractors: Punj Lloyd.
Location: Andhra Pradesh, India.


JOB DUTIES AND RESPONSIBILITIES:
•Review of material test certificates and mill test certificates for compliance with applicable codes.
•Inspection of welding consumables and filler wires.
•Ensure all welding machines and welding equipments are calibrated.
•Control welding consumables and documents.
•Check the qualifications of welders and welding operators.
•Verify Electrode baking oven, Holding and Quivers condition and calibration status.
•Welding Inspection - Pre weld, In process, Post welding inspection,
•Inspection of Fit up including material grades, diameter, schedule, joint configuration, root
gap, Internal misalignment and length.
•Witnessing and Reporting Repair and modifications,
•Inspection of PWHT- chart, thermocouple, heating/cooling rate, soaking time.
•Conducting weekly toolbox meeting to increase the proficiency of welders
•Preparation of quality control forms after all Inspections
•Preparation of Deviation/NCR at all stages of production
•Review & approval of inspection history for hydro test package
•Coordination with NDE agencies to expedite the NDE activities.
•Site inspection and respective documentation and control
•Review the approved drawings
•Attending the Management Review Meeting based Effectiveness, Improvements and NCR Control
•Identifying quality problems, promptly reporting and documenting all the instances of Non-conformance and stopping further processing of work till its rectification.

Éducation

Etudes secondaires ou équivalent, Mechanical
  • à Jawaharlal Nehru •Technological University
  • juillet 2021

Radiographic Testing Ultrasonic Testing Magnetic particle Testing Penetrant Testing

Baccalauréat, Mechanical
  • à Jawaharlal Nehru •Technological University
  • juillet 2021

Radiographic Testing Ultrasonic Testing Magnetic particle Testing Penetrant Testing

Specialties & Skills

Six Sigma
CSWIP 3.1 certified
Strategy Work
Advanced Process Control
CUSTOMER RELATIONS
CALIBRATION
CLOSING
DATABASE ADMINISTRATION
DIMENSIONS
DOCUMENTATION
MATERIALS MANAGEMENT

Langues

Anglais
Expert
Hindi
Expert
Urdu
Expert