Completely designing for HVAC systems, coordination HVAC works with other disciplines, coordination with site works and contractors, supervision on site works and installations, value engineering for HVAC systems, preparation of fully lengthed specification and preparation of bill of quantities and scope of work.
Projects in (ECG):
- The New Entity in The New Administrative Capital (Al Masa), New Cairo (Total Area = 220, 000 m2 consists of 11 buildings + utility buildings and the total cooling load = 11, 000 T.R.)
- Two Towers in Lusail, Qatar 91.5 meters high (3-level basement + 3-floor podium include commercial center and health club + 20 floors hotel tower + 19 floors office tower).
- Residential Development for EMAL Emirates Aluminium Company in Abu Dhabi. (12 buildings, land area = 143, 564 m2).
- Qatar Petroleum New Natural Gas Liquied (NGL) Support Campus at Mesaieed.
- Hawadi Village (King Abdullah Economic City) in Jeddah, KSA.
- P&G Cairo Project DSR Cairo Brownfield.
- Danat Al Emarat women and children hospital with built up area of 84, 000 m2 and 256 bed in Abu Dhabi, UAE.
- Military Medical Complex Chillers’ Plant (90, 000 T.R) and Utility buildings in Riyadh.
- Core Medical Hospital and Emergency Medical Building in Military Medical Complex (Built up area 500, 000 m2, 4, 400 bed).
- Halliburton Technology and Training Center (built up area = 16, 740 m2, LEED Certified Project)
- Design Services for Madinaty Projects.
- Al Marasem International Hospital (30, 000 m2, the 200 bed) in New Cairo.
- INMA Commercial & Administrative Building (Built up area = 50, 000 m2) in New Cairo)
- Rabigh Hospital (110, 000 m2 built up area, 500 bed) in Riyadh.
- National Bank of Egypt - Greater Cairo Branches (Helwan branch, New Maadi branch and 6th of October branch)
- MIS & MIST Offices at IWAN office building in Smart Village.
- E-STURENICS power generation plant in Cairo.
- National Bank of Egypt in Sudan.
- BEYTI Dairy Farm (131 Feddan) and Plant Extension in Nubaria, Cairo-Alex Road.
- BUKHARA SEWERAGE PROJECT (rehabilitation of sewer networks, pump stations, and WWTPs) in Uzbekistan.
- SAMARKAND SEWERAGE PROJECT (rehabilitation of sewer networks, pump stations, and WWTPs) in Uzbekistan.
- GULSAN EGYPT PLANT (On a land area of 85, 100m2 and a built-up area of 50, 000 m2) in 6th of October City.
- Extension of ALXCT Terminal - Phase II at Al Dekhaila Port (Extension of the current facilities of Alexandria Chemicals terminal ALXCT).
- Renovation of Mena House Oberoi Golf Course & Golf Club House in Giza.
- Marriott Courty Hotel (The hotel consists of 4 basements, ground floor and mezzanine, and 22 floors) in Riyadh.
- Etisalat Misr New Premises (Supervision and Management Services) in Smart Village.
- Al UWAYNAH Motel & Majilis (900 m2. Majlis building consists of ground and first with approx. built up area 1222 m2) in Kingdom of Saudi Arabia.
- Design build and maintain stage II phase II in Al Gabal Al Asfar WWTP.
- Company industry:
- Business Consultancy Services
- Job role:
-
Engineering